Atch 36- Submittal Register.pdf

PDF 35 KB Posted

Attached to
Nellis/Creech AFB Simplified Acquisition of Base Engineering Requirements (SABER) Solicitation
Solicitation number
FA486119RA009
Issued by

About this file

This is a material submittal schedule for an unspecified construction project. The schedule lists 25 line items for required submissions including technical data, test reports, samples, color selections, manufacturer recommendations, warranties, catalog data, shop drawings, certificates of compliance, operating instructions, schedules, reports, plans, and field reports. For each item, the schedule requires the submission date, a description including any relevant contract references and whether it is a shop drawing, test report, or other type of submittal. Space is provided to record the contractor notified date and submittal numbers, and for the contracting officer to note the date received, return suspend dates, and final approval.

Not Listed

View the file

Other files

File Type Posted
Atch_04-_SABER_Specs_Rev_24Sept19.pdf PDF
Atch_53-_Revised_SABER_RFIs_24Sept19.pdf PDF
Solicitation_Amendment_-_FA486119RA0090009.pdf PDF
Atch_49-_Statement_of_Objectives_(SOO)_for_RKMF_19-0080_Rev_24Sept19.pdf PDF
Atch_00-_SABER_List_of_Attachments.pdf PDF
Solicitation_Amendment_FA486119RA0090009_SF_30.pdf PDF
Solicitation_Amendment_FA486119RA0090008_SF_30.pdf PDF
Atch_49-_SOO_RKMF-190080_RPR_Rest_Rms_&_Infrastructure_99_FSS_B-20.pdf PDF
Atch_02-_FA486119RA009_Section_L.pdf PDF
Atch_04-_SABER_Specs_29Aug19.pdf PDF
Atch_00-_SABER_List_of_Attachments.pdf PDF
Solicitation_Amendment_FA486119RA0090007_SF_30.pdf PDF
Atch_52-_19RA009_SABER_RFIs_and_Historical_Data.pdf PDF
Atch_02-_FA486119RA009_Section_L.pdf PDF
Atch_00-_SABER_List_of_Attachments.pdf PDF
Solicitation_Amendment_FA486119RA0090006_SF_30.pdf PDF
Atch_02-_FA486119RA009_Section_L.pdf PDF
Atch_00-_SABER_List_of_Attachments.pdf PDF
Solicitation_Amendment_FA486119RA0090005_SF_30.pdf PDF
Atch_00-_SABER_List_of_Attachments.pdf PDF
Solicitation_Amendment_FA486119RA0090004_SF_30.pdf PDF
Atch_02-_FA486119RA009_Section_L.pdf PDF
Solicitation_Amendment_FA486119RA0090003_SF_30.pdf PDF
Atch_00-_SABER_List_of_Attachments.pdf PDF
Atch_51-_19RA009_Preproposal_Site_Visit_(Slides_and_Sign-In_Sheet).pdf PDF
Atch 44- Teaming List.pdf PDF
Atch 25- UM33 VEA Standards.pdf PDF
Atch 22- UG 17-2 3-Phase Delta-Wye Pad Mounted Transformer Loop Feed.pdf PDF
SABER_Atchmts_21-26.zip ZIP file
Atch_00-_SABER_List_of_Attachments.pdf PDF
Atch 24- UG17-2 VEA Standards.pdf PDF
SABER_Atchmts_44-48.zip ZIP file
Solicitation_Amendment_FA486119RA0090002_SF_30.pdf PDF
Atch_34-_Progress_Report_Template.pdf PDF
Atch 45- Past Peformance Information Sheet.pdf PDF
Atch 46- Subcontractor Teaming Partner Consent Form.pdf PDF
Atch 48- Past Performance Questionnaire.pdf PDF
Atch 26- UM48-2 Multi-Grounds.pdf PDF
Atch 21- Power Trench Sand and Backfill Requirements.pdf PDF
Atch 47- Sample Client Authorization Letter.pdf PDF
Atch_04-_SABER_Specs_16Jul19.pdf PDF
Atch 23- UM3-14 VEA Standards.pdf PDF
Solicitation_Amendment_FA486119RA0090001_SF_30.pdf PDF
Atch 22- UG 17-2 3-Phase Delta-Wye Pad Mounted Transformer Loop Feed.pdf PDF
Atch 23- UM3-14 VEA Standards.pdf PDF
Atch 21- Power Trench Sand and Backfill Requirements.pdf PDF
Atch 25- UM33 VEA Standards.pdf PDF
19RA009_SABER_Attch_22-27.zip ZIP file
Atch 48- Past Performance Questionnaire.pdf PDF
Atch 39- WDNV190001-20180001.pdf PDF
Show 40 more

Latest 50 of 99 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).

Approved Disapproved

R et ur n

S us pe ns e D at e

Te ch ni ca l D at a

Te st

R ep or ts

D at e to

C iv il E ng in ee rin g

S am pl es

C ol or S el ec tio n

M an uf ac tu re r's R ec om m en da tio n

M an uf ac tu re r's W ar ra nt y

C at al og

D at a

Project Number:

[ enter here ]

Project Title:

[ enter here ]

Solicitation / Contract Number:

[ enter here ]

Remarks

(To be completed by Project Engineer)

Li ne

N um be r

R eq ui re d S ub m is si on D at e

Item or Description of Item, Contract Reference, Type of Submittal

C er tif ic at e of C om pl ia nc e

S ho p D ra w in gs

Date Contractor Notified

(To be completed by Contract Administrator)

S ub m itt al N um be rs

C on tra ct or R es ub m itt al

Fi na l A pp ro va l

Number of Copies Required

D at e R ec ei ve d in C on tra ct in g

Fi el d R ep or ts

O pe ra tin g In st ru ct io ns

S ch ed ul es , L is tin gs , R ep or ts , P la ns

Material Submittals Schedule

File details come from the government source that posted it. Updated .