Atch_00-_SABER_List_of_Attachments.pdf
PDF 60 KB Posted
- Attached to
- Nellis/Creech AFB Simplified Acquisition of Base Engineering Requirements (SABER) Solicitation
- Solicitation number
- FA486119RA009
About this file
This document provides an attachment list for solicitation number FA486119RA009, the Nellis/Creech AFB Simplified Acquisition of Base Engineering Requirements. The solicitation seeks bids for construction and facility support services at Nellis Air Force Base and Creech Air Force Base, including fire protection, communications, electrical, lighting, mechanical, plumbing and utility meter installation. The attachment list includes specifications, requirements documents, standards, forms and wage determinations totaling over 500 pages of reference materials. Past performance documentation and a quality control plan will also be required as part of respondents' proposals. The solicitation is issued by the Department of the Air Force Air Combat Command. The preproposal site visit slides and sign-in sheet are also provided.
Attachment 00- SABER List of Attachments
View the file
Other files
Show 40 more
Latest 50 of 99 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attach # Description Date # of Pages
Solicitation Attachments 1 Price Schedule 20 2 Section L- Instructions to Offerors 3 Section M- Evaluation Factors for Award 4 SABER Specifications 16 Jul 19 66
Nellis/Creech Requirements 5 Nellis-Creech AFB IFS Fire Protection Requirements 22 Jan 19 10 6 Nellis-Creech AFB IFS Appendix Comm Requirements 9 Feb 17 29 7 Nellis-Creech AFB IFS Electrical Requirements 22 Jan 19 11 8 Nellis-Creech AFB IFS Lighting Requirements 22 Jan 19 3 9 Nellis-Creech AFB IFS Mechanical and Plumbing Requirements 22 Jan 19 7
10 Nellis-Creech AFB IFS Utility Meter Requirements 22 Jan 19 6 11 Environmental Permit Guidance 1 Sept 18 2 12 ACC Sole Source EMCS Letter 3 June 03 1 13 NAFB Plan 32-7086 Hazardous Materials Management 01 Feb 10 57 14 USAF Integrated Cultural Resource Mgmt Plan 13 Nov 17 384
Creech AFB Electrical Standards 15 UM1-6C 3-Phase Pad and Vault 20 June 13 1 16 UR2 (S) Primary and Secondary Trenching Requirements 20 June 13 1 17 UM3-14 1-Phase CJE Conduit Placement Standards 21 June 13 1 18 UM33 200 Amp 3-Phase CJE 4 Inch Conduit Placement Standards 21 June 13 1 19 UM33 3-Phase CJE Conduit Placement Standards 20 June 13 1 20 Bulletin 1728F-806 UG Main VEA Standard 26 June 00 91 21 Power Trench Sand and Backfill Requirements 30 Apr 13 2 22 UG 17-2 3-Phase Delta-Wye Pad Mounted Transformer Loop Feed 28 June 13 1 23 UM3-14 VEA Standards 21 June 13 1 24 UG17-2 VEA Standards 21 June 13 1 25 UM33 VEA Standards 21 June 13 1 26 UM48-2 Multi-Grounds 21 June 13 1 27 VEA Connection Charge Agreement N/A 2
Forms 28 Nevada Test and Training Range Visit Request/Authorization 20 Mar 19 3 29 Nuclear Gauge Form 1 30 Apr 13 3 30 Nuclear Gauge Form 2 30 Apr 13 3 31 AF Form 103, Base Civil Engineering Work Clearance Request 21 June 13 1 32 AF Form 3052, Construction Cost Estimate Template 21 June 13 1 33 AF Form 3064, Progress Schedule Template 21 June 13 1 34 AF Form 3065, Progress Report Template 21 June 13 1 35 Schedule of Values Template N/A 1 36 Submittal Register N/A 1 37 AF Form 3000, Material Approval Submittal 01 Sep 03 2 38 Builder Inventory Sheet N/A 1
Wage Determinations 39 General Decision Number NV190001 NV1 8 March 19 10 40 General Decision Number NV190038 NV38 18 Jan 19 9 41 General Decision Number NV190024 NV24 18 Jan 19 7 42 General Decision Number NV190012 NV12 18 Jan 19 6
Quality Control Plan 43 Quality Control Plan TBD
31 Jul 19
Past Performance Packet 44 Teaming List 1 45 Past Performance Information Sheet 3 46 Subcontractor/Teaming Partner Consent Form 1 47 Sample Client Authorization Letter 1 48 Past Performance Questionnaire 4
Demonstration Project Packet 49 Statement of Objectives (SOO) for RKMF 19-0080 50 Building 20 As Builts (PDF) 139
Solicitation Attachments 51 19RA009 Preproposal Site Visit (Slides and Sign-In Sheet) 22 Jul 19
File details come from the government source that posted it. Updated .