Attachment_23_-_CAFB_MAFR_Contractor_Env_Guide__Appendix_A_&_B_Forms_-_2_Jul_2015.pdf

PDF 744 KB Posted

Attached to
Simplified Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA4855-18-R-0003
Issued by
Department of the Air Force Special Operations Command

About this file

Attachment 23. CAFB/MAFR Environmental Guide 2015 Appendix A & B Forms 2 Jul 2015

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Base Engineering Requirements (SABER), newest first.
File Type Posted
FA485518R0003_Amendment_5.pdf PDF
Attachment_45_-_Education.Experience_Matrix_20_May.pdf PDF
Questions_and_Answers_Part_6.pdf PDF
FA485518R0003_Amendment_0003.pdf PDF
FA485518R0003_Q&A_Part_5.pdf PDF
Attachment_43_-_Seed_Project_Attachments_-_18_Jan_2018.pdf PDF
Attachment_41_-_Sample_Project_Attachment_-_18_Jan_2018.pdf PDF
FA4855-18-R-0003_Amendment_0002.pdf PDF
FA485518R0003_Q&A_Part_4.pdf PDF
Pre-Proposal_Site_Visit_Memo.Addendum.pdf PDF
FA485518R0003_Q&A_Part_3.pdf PDF
Pre-Proposal_Site_Visit_Memo.Part1.CAFB.pdf PDF
Site_Visit_Sign_In_Sheet_Redacted.pdf PDF
Pre-Proposal_Site_Visit_Memo.Part2.MAFR.pdf PDF
FA485518R0003_Q&A_Part_1.pdf PDF
Attachment_33-_WD_NM50_Highway_Curry_&_Roosevelt_-_6_Jan_2017.pdf PDF
Attachment_09_-_GeoBase_Initial_Operating_Capability_-_19_May_2010.pdf PDF
Attachment_44_-_Additional_Contractor_Information_-_no_date.pdf PDF
Attachment_40_-_Sample_Project_Statement_of_Objectives_-_31_Aug_2017.PDF PDF
Attachment_42_-_Seed_Project_Statement_of_Objectives_-_21_Nov_2017.pdf PDF
Attachment_25_-_AF_Carpet_Standard_-_ETL_07_4_-_28_Mar_2007.pdf PDF
Attachment_24_-_Statement_of_Work_Example_-15_Sep_2017.pdf PDF
Attachment_16_-_AF_Form_103v10_Work_Clearance_Request_-_29_Feb_2015.pdf PDF
Attachment_26_-_As-Built_Submittal_Guidelines_-_3_Feb_2014.pdf PDF
Attachment_17_-_AF_Form_592_Hot_Work_Permit_-_4_Sep_2012.pdf PDF
Attachment_01-_SABER_General_Requirements_-_6_Oct_2017.pdf PDF
Attachment_30-_NMGRT_Invoice_Certification_-_no_date.pdf PDF
Attachment_14_-_AF_Form_66_Schedule_of_Material_Submittals_-_no_date.pdf PDF
Attachment_32-_WD_NM5_Residential_Curry_&_Roosevelt_-_6_Jan_2017.pdf PDF
Attachment_20_-_Base_Contractor_Storage_Lot_Agreement_-_no_date.pdf PDF
Attachment_21_-_Contractor_Security_Handbook_-_8_Oct_2015.pdf PDF
Attachment_41_-_Sample_Project_Attachments_-_no_date.pdf PDF
Attachment_11_-_UFC_1-300-8,_Real_Property_Transfer_with_change_-_2_Aug_2011.pdf PDF
Attachment_18_-_Building_Custruction_1354_Checklist_-_7_Feb_2010.pdf PDF
Attachment_15_-_AF_Form_3000_Material_Approval_Submittal_-_1_Sep_2003.pdf PDF
Attachment_07_-_AEC_CAD_Standards_-_Aug_2015.pdf PDF
Attachment_12_-_AF_Form_3064_-_Progress_Schedule_-_1_Sep_2003.pdf PDF
Attachment_19_-_CAFB_Labeling_Standards_for_Communications_-_29_Jan_2009.pdf PDF
Attachment_03_-_Example_Drawings_-_May_1975.pdf PDF
Attachment_28_-_Cost_Estimate_Example_-_no_date.pdf PDF
Attachment_02_-_SABER_Specifications_-_14_Nov_2017.pdf PDF
FA485518R0003_-_SABER.pdf PDF
Attachment_22_-_CAFB_MAFR_Contractor_Env_Guide_-_2_Jul_2015.pdf PDF
Attachment_31-_NMGRT_Proposal_Certification_-_no_date.pdf PDF
Attachment_29-_MAFR_Standard_Operating_Procedures_-_13_Mar_2017.pdf PDF
Attachment_06_-_CAFB_Landscape_Development_Plan_-_3_Feb_2012.pdf PDF
Attachment_34-_WD_NM23_Building_Curry_-_22_Sep_2017.pdf PDF
Attachment_05_-_CAFB_Hardware_Specifications_Guideline_-_Nov_2016.pdf PDF
Attachment_36-_WD_NM7_Heavy_Curry_-_15_Sep_2017.pdf PDF
Attachment_37-_WD_NM12_Heavy_Roosevelt_-_15_Sep_17.pdf PDF
Show all 50

Simplified Base Engineering Requirements (SABER) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev. 5 02 July 15

Cannon AFB & Melrose AFR Contractor Hazmat Worksheet

1. Contractor Information

Contractor Name:

Contract Number:

Project Number:

Estimated Start Date:

Estimated Completion Date:

Assigned Shop Code, if known:

2. Material Information

Material Name (from SDS):

Material Stock No. (MSN), or National Stock No. (NSN), or Local Stock No. (LSN), enter if known:

Container Type (circle one):

Box Bottle Can Drum Bag Tube Cartridge

Other (Specify):_

Container Volume or Weight (circle one):

Weight Oz. Pounds Tons Grams Kilograms

Fluid Oz. Pints Quarts Gallons Other (Specify):_

Total No. of Containers: Container Size: Total Hazmat

Quantity:

3. Process Information

Process Type:

Process Description:

4. Engineering Controls

Describe process engineering controls:

5. Personal Protective Equipment (PPE)

Describe process PPE:

6. Location Information

Process will be performed on/at (circle all that apply):

Existing Facility New Facility Equipment

Aircraft Outdoors Other (Specify):_

Physical location of process:

Staging location of hazmat:

Attachment 23 FA4855-18-R-0003

Signature Block

Contractor Title Phone Date

Printed Name Signature

7. Additional Information

Will a hazardous waste be generated (circle one)?

Yes No

TBD

Describe method(s) of waste manage-ment, transport, and disposal:

IAW FAR 52.223-3/AFI 32-7086 3.4.1; All HAZMAT brought onto an installation for use shall be authorized via the process described in this section.

NOTE: Manufacturer’s Safety Data Sheet (SDS) is required for every worksheet

Cannon AFB & Melrose AFR Contractor Hazmat Review

1. Project Information

Contractor:

Contract Number: Project Number:

Project Location: Shop Code (if known):

Form Turn-In Day / Frequency (Cannon AFB/ Melrose AFR will complete):

Day of Month and/or

End of project

2. Reporting Information Reporting Date:

Name:

3. Material Usage

Hazmat Name (SDS) MSN Container Size (w/ Unit of Measure) Containers Used This Period

4. Project Information

Contractor:

Contract Number: Project Number:

Project Location: Shop Code (if known):

Form Turn-In Day / Frequency (Cannon AFB/ Melrose AFR will complete):

Day of Month and/or

End of project

5. Reporting Information Reporting Date:

Name:

6. Material Usage

Hazmat Name (SDS) MSN Container Size (w/

Unit of Measurement)

Containers Used This Period

1. Contractor Information

Date:

Contractor Name:

Contract Number:

Project Number:

Assigned Shop Code:

2. Material Information

Material Name (from SDS):

MSN, NSN or LSN:

The Cannon AFB HAZMART has received and reviewed the attached:

1. Cannon AFB/ Melrose AFR Contractor Hazmat Information Worksheet

2. Cannon AFB / Melrose AFR Contractor Hazmat Usage Worksheet, and

3. Associated Safety Data Sheets.

The information submitted is complete. The hazmat noted above may enter Cannon AFB and/or Melrose AFR

The information submitted indicates that the material is not hazardous and may enter Cannon AFB and/or Melrose AFR

The information submitted is incomplete and/or erroneous. Please follow the instruction below and resubmit.

Problem If Checked

Description

The Contractor Hazmat Information Worksheet is incomplete. Missing information is highlighted or described:

The Contractor Hazmat Usage Worksheet is incomplete. Missing information is highlighted or described:

The SDS is illegible or outdated:

Other 1:

Other 2:

Other 3:

Other 4:

Cannon AFB & Melrose AFR Contractor Fuel Tank Approval Worksheet

1. Project Information Contract Number:

Project Number:

Project Name:

Project Coordinator (Name & Phone Number):

2. Tank Information Tank Location:

Dates the tank will be utilized on CAFB or MARF:

Tank Size:

Tank Content:

Does the tank have proper labeling?

Does the tank have a secondary containment?

Are the personnel trained on the Spill Response Procedures and Notifications as described in Appendix C of this guide?

Does the contractor have adequate spill supplies?

X Project Coordinator (Signature & Date)

Fire Department: Approve Disapprove

Comments: ___________________________________________________________________________

X Fire Department, Chief (Signature & Date)

Environmental Element: Approve Disapprove

Comments: ___________________________________________________________________________

X Environmental, Tank PM (Signature & Date)

Cannon AFB & Melrose AFR Contractor Solid Waste Disposal, Diversion, and Recycling Plan

Contract and Project Information Contract Number:

Project Number:

Project Name:

Project Waste & Recycling Coordinator(s):

Debris Disposal and Recycling Guidelines 1.

2.

3.

Material Total

Estimated Quantity

Recycling or Disposal Method Material Handling Procedure

Cannon AFB & Melrose AFR Contractor Solid Waste Disposal, Diversion, and Recycling Worksheet

Contract Number:

Project Number:

Project Name:

Project Waste & Recycling Coordinator(s):

Reporting Month:

Material

Monthly Volume, Weight, or Count Managed Project Totals To Date

Recycled Landfilled Recycled Landfilled

1. Introduction:
2. Rules and Regulations
3. Responsibilities
1. Summary of Common Environmental Requirements and Contractor Responsibilities
2. Phone Numbers
3. Contractor Guide Electronic Version
Instruction for completing AF Form 3000, Material Approval Submittal
Instructions for Completing Attachment A-1, Cannon AFB & Melrose AFR Contractor Hazmat Worksheet
ATTACHMENT A-1
A. Initial Completion Requirements (Prior to Starting Work)
ATTACHMENT A-2
Cannon AFB & Melrose AFR Contractor Hazmat Review
Cannon AFB & Melrose AFR Contractor Hazmat Review
Cannon AFB & Melrose AFR Contractor Hazmat Review
Appendix B – Solid Waste Disposal, Diversion, and Recycling
Appendix B – Solid Waste Disposal, Diversion, and Recycling
ATTACHMENT B-1
ATTACHMENT B-2
Example
Appendix C – Proper Mgmt. & Disposal of RCRA Hazardous, Universal, and Toxic Wastes
Appendix D – Investigation-Derived Waste; Proper Management and Disposal
IDW – Proper Management
IDW – Proper Sampling
IDW – Proper Disposal

Appendix E – Environmental, Safety, and Occupational Health – Training Network Access and Registration Instructions

File details come from the government source that posted it.