m1.pdf

PDF 60 KB Posted

Attached to
Add/Alter Aerial Delivery Mobility Bag Storage Building
Solicitation number
FA4830-12-B-0001
Issued by

About this file

Attachment 4 Drawings m1

View the file

Other files

File Type Posted
Questions and Answers of FBO.pdf PDF
amendment 3.pdf PDF
amendment 2.pdf PDF
Sign in sheet.pdf PDF
C101.pdf PDF
QUESTION FORM.doc DOC document
Amendment 1.doc DOC document
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS.doc DOC document
05 05 23 WELDING STRUCTURAL.doc DOC document
32 92 23 SODDING.doc DOC document
08 81 00 GLAZING.doc DOC document
A-10.pdf PDF
23 23 00 REFRIGERANT PIPING.doc DOC document
01 35 29 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS.doc DOC document
C102.pdf PDF
26 05 73.00 40 OVERCURRENT PROTECTIVE DEVICES.doc DOC document
26 41 01.00 10 LIGHTNING PROTECTION SYSTEM.doc DOC document
Solicitation.doc DOC document
08 11 13 STEEL DOORS AND FRAMES .doc DOC document
07 11 13 BITUMINOUS DAMPPROOFING.doc DOC document
26 24 16.00 40 PANELBOARDS.doc DOC document
E5.pdf PDF
23 00 00 AIR SUPPLY DISTRIBUTION VENTILATION AND EXHAUST.doc DOC document
33 30 00 SANITARY SEWERS.doc DOC document
10 26 13 WALL AND CORNER GUARDS.doc DOC document
Demo Plan2-Layout2.pdf PDF
m2.pdf PDF
02 41 00 DEMOLITION AND RECONSTRUCTION.doc DOC document
A-1.pdf PDF
31 60 00 FOUNDATION PREPARATION.doc DOC document
08 51 23 STEEL WINDOWS.doc DOC document
28 05 26.00 40 GROUNDING AND BONDING FOR ELECTRONIC SAFETY A.doc DOC document
E4 —
03 15 13 00 10 EXPANSION JOINTS CONTRACTION JOINTS AND WAT.doc DOC document
08 71 00 DOOR HARDWARE.doc DOC document
03 20 01.00 10 CONCRETE REINFORCEMENT.doc DOC document
Attach 1 Building Wage Determination.docx DOCX document
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM.doc DOC document
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS.doc DOC document
FP02.pdf PDF
A-9.pdf PDF
A-4.pdf PDF
sow.pdf PDF
E9.pdf PDF
A-5.pdf PDF
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS.doc DOC document
27 21 10.00 10 FIBER OPTIC DATA TRANSMISSION SYSTEM.doc DOC document
E6 —
26 51 00 INTERIOR LIGHTING.doc DOC document
X-1.pdf PDF
Show 40 more

Latest 50 of 146 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JAN.

HP-1

OUTDOOR

SECTION

HP-1

INDOOR

SECTION

CONCRETE

PAD

EF-1

ON ROOF

MECHANICAL

ELEC.

102 MEN

WOMEN

COMM.

OFFICE

CORRIDOR

T

HP-1

14"x13"

14"x10"

10"x6"

10"x7"

10"x7"

6X6 CRR

60 CFM

6X6 CER

75 CFM

6X6 CER

75 CFM

6X6 CER

75 CFM

10X10 CD

232 CFM

8X8 CRR

210 CFM

8X8 CRR

159 CFM

10"Ø

8"Ø

6"Ø

6"Ø

10"Ø

6"Ø

10"Ø

6X6 CD

59 CFM

6X6 CD

88 CFM

8X8 CD

188 CFM

6X6 CD

59 CFM

10X10 CD

249 CFM

10"x10"

8"x4"

8"x4"

8"x4"

14"x14" DN TO

RA PLENUM

CONCRETE

PAD

14"x12"

12"x12"

10"x12"

6"x12"

3'-0"x1'-0"

OSA LOUVER

250 CFM

14"x12" DN

TO HP-1

F.D.

F.D.

10"x10" UP TO

EF-1 ON ROOF

W/FIRE DAMPER

@ RATED PARTITION

8X8 CRR

196 CFM

R

R

R

RR

MECHANICAL

CORRIDOR

ELEC.

MEN

JAN.

WOMEN

COMM.

OFFICE

WAREHOUSE

6"Ø TYPE "B" THRU WALL

WITH FLASHING AND

VENT CAP.

4"Ø TUBE WITH REFLECTORS

COMBUSTION

AIR INLET CAP

4"Ø

BOOT

COMBUSTION

AIR INLET CAP

4"Ø

AIR INLET

COMBUSTION

AIR INLET CAP

4"Ø

4"Ø TUBE WITH REFLECTORS

6"Ø TYPE "B" THRU WALL

WITH FLASHING AND

VENT CAP.

BUILDING 932 ADDITION - FLOOR PLAN - MECHANICAL

1/8" = 1'-0"

EF-2 EF-3

5'-9"x 5'-9" EXHAUST

LOUVER. MOUNT HIGH

AS POSSIBLE. SEE

ARCHITECTURAL DRAWINGS

FOR EXACT LOCATION.

M

EF-2

M S

EF-3

12'-4"x 6'-0" INTAKE

LOUVER. MOUNT 8"

ABOVE FINISH FLOOR. SEE

ARCHITECTURAL DRAWINGS

FOR EXACT LOCATION.

MECHANICAL CONTRACTOR SHALL

FURNISH AND INSTALL 5'-0x5'-0x9"

DEEP PLENUM OVER 48" SQUARE

OPENING. SEAL AIR TIGHT AND

CONNECT NEW 54" Ø SPIRAL DUCT

54"Ø SPIRAL DUCT

54"Ø SPIRAL DUCT

54"Ø SPIRAL DUCT

54"Ø SPIRAL DUCT

54"Ø SPIRAL DUCT

54"Ø SPIRAL DUCT

EF-4

EF-5

EF-6

EF-8

EF-9

EF-7

6'-0"X6'-0"

EXHAUST LOUVER

30,000 CFM

6'-0"X6'-0"

EXHAUST LOUVER

30,000 CFM

6'-0"X6'-0"

EXHAUST LOUVER

30,000 CFM

6'-0"X6'-0"

EXHAUST LOUVER

30,000 CFM

6'-0"X6'-0"

EXHAUST LOUVER

30,000 CFM

6'-0"X6'-0"

EXHAUST LOUVER

30,000 CFM

IR-1

VP-1

IR-2

IR-3

IR-4

VP-1

6"Ø TYPE "B" UP THRU

ROOF W/ FLASHING STORM

COLLAR AND VENT CAP.

4"Ø TUBE WITH REFLECTORS

IR-5

VP-3

4" Ø COMBUSTION AIR

INLET UP THRU ROOF

W/FLASHING, STORM

COLLAR AND VENT CAP.

T

T

T

FLEX. CONN.

(TYPICAL)

AS SHOWN. (TYPICAL 6 PLACES)

FIRE DAMPER

FIRE DAMPER

FIRE DAMPER

FIRE DAMPER

FIRE DAMPER

FIRE DAMPER

M1M2 A

S

S S S

S S S

EF-4

EF-5

EF-6

EF-7

EF-8

EF-9

NOTE:

1. INTERLOCK EF-2 AND EF-3 WITH RESPECTIVE MOTORIZED INTAKE DAMPER. MOTERIZED DAMPERS SHALL OPEN

PRIOR TO EXHAUST FAN OPERATION.

CAPE

1674 Headland Avenue

Dothan, AL 36303

(334) 793-2790

Fax: (334) 671-7157

Engineering H 1214 1st Avenue Suite 210

Columbus, GA 31901

(706) 596-1840

Fax: (706) 596-9233

FLOOR PLAN - MECHANICAL

1/4" = 1'-0"

BUILDING 932 ADDITION - ENLARGED

File details come from the government source that posted it. Updated .