Attachment 3 Specifications Dated 2/21/2012 02 41 00 Demolition and reconstruction

View the file

Other files

File Type Posted
Questions and Answers of FBO.pdf PDF
amendment 3.pdf PDF
amendment 2.pdf PDF
Sign in sheet.pdf PDF
C101.pdf PDF
QUESTION FORM.doc DOC document
Amendment 1.doc DOC document
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS.doc DOC document
05 05 23 WELDING STRUCTURAL.doc DOC document
32 92 23 SODDING.doc DOC document
08 81 00 GLAZING.doc DOC document
A-10.pdf PDF
23 23 00 REFRIGERANT PIPING.doc DOC document
01 35 29 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS.doc DOC document
C102.pdf PDF
26 05 73.00 40 OVERCURRENT PROTECTIVE DEVICES.doc DOC document
26 41 01.00 10 LIGHTNING PROTECTION SYSTEM.doc DOC document
Solicitation.doc DOC document
08 11 13 STEEL DOORS AND FRAMES .doc DOC document
07 11 13 BITUMINOUS DAMPPROOFING.doc DOC document
26 24 16.00 40 PANELBOARDS.doc DOC document
E5.pdf PDF
23 00 00 AIR SUPPLY DISTRIBUTION VENTILATION AND EXHAUST.doc DOC document
33 30 00 SANITARY SEWERS.doc DOC document
10 26 13 WALL AND CORNER GUARDS.doc DOC document
Demo Plan2-Layout2.pdf PDF
m2.pdf PDF
A-1.pdf PDF
31 60 00 FOUNDATION PREPARATION.doc DOC document
08 51 23 STEEL WINDOWS.doc DOC document
28 05 26.00 40 GROUNDING AND BONDING FOR ELECTRONIC SAFETY A.doc DOC document
E4 —
03 15 13 00 10 EXPANSION JOINTS CONTRACTION JOINTS AND WAT.doc DOC document
08 71 00 DOOR HARDWARE.doc DOC document
03 20 01.00 10 CONCRETE REINFORCEMENT.doc DOC document
Attach 1 Building Wage Determination.docx DOCX document
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM.doc DOC document
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS.doc DOC document
FP02.pdf PDF
A-9.pdf PDF
A-4.pdf PDF
sow.pdf PDF
E9.pdf PDF
A-5.pdf PDF
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS.doc DOC document
27 21 10.00 10 FIBER OPTIC DATA TRANSMISSION SYSTEM.doc DOC document
E6 —
26 51 00 INTERIOR LIGHTING.doc DOC document
X-1.pdf PDF
A-3.pdf PDF
Show 40 more

Latest 50 of 146 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 02 41 00

DEMOLITION AND RECONSTRUCTION

PART 1 GENERAL

1.1 REFERENCES

1.1.1 The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. Unless other wise noted, the latest published version and/or revision shall be used.

1.1.1.1 AIR-CONDITIONING AND REFRIGERATION INSTITUTE (ARI)

a. ARI Guideline K Guideline for Containers for Recovered Non-Flammable Fluorocarbon Refrigerants

1.1.1.2 AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

a. ANSI A10.6

Safety Requirements for Demolition Operations

1.1.1.3 AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO)

a. AASHTO M 145 Classification of Soils and Soil-Aggregate Mixtures for Highway Construction Purposes

b. AASHTO T 180 Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and an 457-mm (18-in) Drop

1.1.1.4 AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)

a. ASSE/SAFE A10.6 Safety Requirements for Demolition Operations

1.1.1.5 CARPET AND RUG INSTITUTE (CRI)

a. CRI 104 Standard for Installation Specification of Commercial Carpet

1.1.1.6 U.S. ARMY CORPS OF ENGINEERS (USACE)

a. EM 385-1-1

Safety -- Safety and Health Requirements

1.1.1.7 U.S. DEFENSE LOGISTICS AGENCY (DLA)

a. DLA 4145.25

Storage and Handling of Liquefied and Gaseous Compressed Gases and Their Full and Empty Cylinders

1.1.1.8 U.S. DEPARTMENT OF DEFENSE (DOD)

a. DOD 4000.25-1-M

Requisitioning and Issue Procedures

b. MIL-STD-129

Military Marking for Shipment and Storage

1.1.1.9 U.S. FEDERAL AVIATION ADMINISTRATION (FAA)

a. FAA AC 70/7460-1

Obstruction Marking and Lighting

1.1.1.10 U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

a. 40 CFR 61

National Emission Standards for Hazardous Air Pollutants

b. 40 CFR 82

Protection of Stratospheric Ozone

a. 49 CFR 173.301

Shipment of Compressed Gases in Cylinders and Spherical Pressure Vessels

1.2 SYSTEM DESCRIPTION

1.2.1 General Requirements

1.2.1.1 Do not begin demolition or deconstruction until authorization is received from the Contracting Officer. The work of this section is to be performed in a manner that maximizes salvage and recycling of materials. Remove rubbish and debris from the project site; do not allow accumulations inside or outside the buildings or on airfield pavements. The work includes demolition, salvage of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections. A minimum of 50% of demolition or reconstruction debris will be recycled or reused.

1.2.1.2 Remove materials and equipment as indicated to be removed by the Contracting Officer and that are to remain the property of the Government, and deliver to a storage site as directed by the Contracting Officer.

1.2.1.3 Contractor shall salvage items and material to the maximum extent possible.

1.3 SUBMITTALS

1.3.1 Government approval may be required on any of the following items. Items requiring submittals will be listed on the Submittal Register. Provide copies of all submittals per the requirements in Section 01 33 00, Submittal Procedures, or as listed on the Submittal Register.

1.3.2 Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

1.3.2.1 SD-01 Preconstruction Submittals

a. Existing Conditions

1.3.2.2 SD-03 Product Data

a. Work Plan

(1) The procedures proposed for the accomplishment of the work. The procedures shall provide for safe conduct of the work, including procedures and methods to provide necessary supports, lateral bracing and shoring when required, careful removal and disposition of materials specified to be salvaged, protection of property which is to remain undisturbed, coordination with other work in progress, and timely disconnection of utility services. The procedures shall include a detailed description of the methods and equipment to be used for each operation, and the sequence of operations in accordance with EM 385-1-1.

1.3.2.3 SD-07 Certificates

a. Demolition Plan; G, CO

b. Notifications; G, CO

c. Notification of Demolition and Renovation forms; G, CO

d. Submit proposed demolition and removal procedures for approval before work is started.

1.3.2.4 SD-11 Closeout Submittals

a. Receipts

(1) Receipts or bills of lading, as specified.

1.4 QUALITY ASSURANCE

1.4.1 Qualifications

1.4.1.1 The Contractor shall provide a qualified, licensed Geologist experienced in subsurface exploration for each drill unit to oversee all drilling, sampling, and field testing operations. This individual shall be responsible for the preparation of a separate log and/or report for each boring, pressure test, or test pit. This individual shall also be responsible for the preparation of all soil and rock samples for delivery to the designated point.

1.4.1.2 The presence of a Government representative or the keeping of separate drilling records by the Contracting Officer shall not relieve the Contractor of the responsibility for the work specified in this specification.

1.4.2 Regulatory and Safety Requirements

1.4.2.1 Furnish timely notification of demolition and renovation projects to Federal, State, regional, and local authorities in accordance with 40 CFR 61, Subpart M. Notify the Regional Office of the United States Environmental Protection Agency (USEPA), State's environmental protection agency local air pollution control district/agency and the Contracting Officer in writing 10 working days prior to the commencement of work in accordance with 40 CFR 61, Subpart M.

1.4.2.2 Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSE/SAFE A10

1.4.3 Receipts

1.4.3.1 Submit a shipping receipt or bill of lading for all containers of ozone depleting substance (ODS) shipped to the Defense Depot, Richmond, Virginia.

1.5 DELIVERY, STORAGE, AND HANDLING

1.5.1 Required Data

1.5.1.1 Prepare a Demolition Plan. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services and lighting, a detailed description of methods and equipment to be used for each operation and of the sequence of operations. Identify components and materials to be salvaged for reuse or recycling with reference to paragraph Existing Facilities to be removed. Append tracking forms for all removed materials indicating type, quantities, condition, destination, and end use. Coordinate with Waste Management Plan. Include statements affirming Contractor inspection of the existing roof deck and its suitability to perform as a safe working platform or if inspection reveals a safety hazard to workers, state provisions for securing the safety of the workers throughout the performance of the work. Provide procedures for safe conduct of the work in accordance with EM 385-1-1. Plan shall be approved by a Structural PE prior to work beginning.

1.6 PROJECT / SITE CONDITIONS

1.6.1 Environmental Requirements

1.6.1.1 Comply with all Environmental Protection Agency requirements specified.

1.6.1.2 Dust and Debris Control

a. Prevent the spread of dust and debris to occupied portions of the building and on airfield pavements and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Clean the work area daily. Sweep pavements as often as necessary to control the spread of debris that may result in foreign object damage potential to aircraft.

1.6.1.3 Use of Explosives

a. Use of explosives will not be permitted.

1.6.1.4 Burning

a. The use of burning at the project site for the disposal of refuse and debris will not be permitted.

1.6.2 Existing Conditions

1.6.2.1 Documentation

a. Before beginning any demolition or deconstruction work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions in the presence of the Contracting Officer showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs sized 100 mm (4 inch) will be acceptable as a record of existing conditions. Include in the record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to before starting work. It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document.

1.7 SEQUENCING AND SCHEDULING

1.7.1 Availability of Work Areas

1.7.1.1 Areas in which the work is to be accomplished will be available during the time indicated in the NTP.

1.7.2 Foreign Object Damage

1.7.2.1 Aircraft and aircraft engines are subject to FOD from debris and waste material lying on airfield pavements. Remove all such materials that may appear on operational aircraft pavements due to the Contractor's operations. If necessary, the Contracting Officer may require the Contractor to install a temporary barricade at the Contractor's expense to control the spread of FOD potential debris. The barricade must include a fence covered with a fabric designed to stop the spread of debris. Anchor the fence and fabric to prevent displacement by winds or jet/prop blasts. Remove barricade when no longer required.

1.7.3 Relocations

1.7.3.1 Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Items to be relocated which are damaged by the Contractor shall be repaired or replaced with new undamaged items as approved by the Contracting Officer.

1.8 RELATED REQUIREMENTS

1.8.1 The information provided in this section applies to all other specification sections that are applicable to project.

PART 2 PRODUCTS

2.1 FILL MATERIAL

2.1.1 Comply with excavating, backfilling, and compacting procedures for soils used as backfill material to fill basements, voids, depressions or excavations resulting from demolition or deconstruction of structures. Fill material shall be waste products from demolition or deconstruction until all waste appropriate for this purpose is consumed.

2.1.2 Fill material must conform to the definition of satisfactory soil material as defined in AASHTO M 145, Soil Classification Groups A-1, A-2-4, A-2-5 and A-3. In addition, fill material must be free from roots and other organic matter, trash, debris, frozen materials, and stones larger than 50 millimeter (2 inches) in any dimension.

2.1.3 Proposed fill material must be sampled and tested by an approved soil testing laboratory, as follows:

2.1.3.1 Soil classification

AASHTO M 145

2.1.3.2 Moisture-density relations

AASHTO T 180, Method B or D

PART 3 EXECUTION

3.1 EXISTING FACILITIES TO BE REMOVED

3.1.1 Inspect and evaluate existing structures on site for reuse. Existing construction scheduled to be removed for reuse shall be disassembled. Dismantled and removed materials are to be separated, set aside, and prepared as specified, and stored or delivered to a collection point for reuse, remanufacture, recycling, or other disposal, as specified. Materials shall be designated for reuse on site whenever possible.

3.1.1.1 Structures

a. Remove existing structures indicated to be removed on the drawings. Interior walls, other than retaining walls and partitions, shall be removed to below grade or to top of concrete slab on ground as indicated on the drawings. Break up basement slabs to permit drainage. Remove sidewalks, curbs, gutters and street light bases as indicated.

b. Demolish structures in a systematic manner from the top of the structure to the ground. Complete demolition work above each tier or floor before the supporting members on the lower level are disturbed. Demolish concrete and masonry walls in small sections. Remove structural framing members and lower to ground by means of derricks, platforms hoists, or other suitable methods as approved by the Contracting Officer.

c. Locate demolition equipment throughout the structure and remove materials so as to not impose excessive loads to supporting walls, floors, or framing.

d. Building, or the remaining portions thereof, not exceeding 25 m (80 feet) in height may be demolished by the mechanical method of demolition if approved by the Contracting Officer.

3.1.1.2 Utilities and Related Equipment

a. General Requirements

(1) Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by the Contracting Officer. Do not interrupt existing utilities serving facilities occupied and used by the Government except when approved in writing and then only after temporary utility services have been approved and provided. Do not begin demolition or deconstruction work until all utility disconnections have been made. Shut off and cap utilities for future use, as indicated.

b. Disconnecting Existing Utilities

(1) Remove existing utilities as indicated on the drawings and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Contracting Officer. When utility lines are encountered that are not indicated on the drawings, the Contracting Officer shall be notified prior to further work in that area. Remove meters and related equipment and deliver to a location in accordance with instructions of the Contracting Officer.

c. Masonry

(1) Sawcut and remove masonry so as to prevent damage to surfaces to remain, to removed materials being salvaged and to facilitate the installation of new work. Where new masonry adjoins existing, the new work shall abut or tie into the existing construction as indicated. Provide square, straight edges and corners where existing masonry adjoins new work and other locations.

d. Concrete

(1) Saw concrete along straight lines to a depth of a minimum 2 inches. Make each cut in walls perpendicular to the face and in alignment with the cut in the opposite face. Break out the remainder of the concrete provided that the broken area is concealed in the finished work, and the remaining concrete is sound. At locations where the broken face cannot be concealed, grind smooth or saw cut entirely through the concrete.

e. Structural Steel

(1) Salvage for recycle structural steel, steel joists, girders, angles, plates, columns and shapes. Flame-cutting torches are permitted when other methods of dismantling are not practical.

f. Miscellaneous Metal

(1) Salvage shop-fabricated items such as access doors and frames, steel gratings, metal ladders, wire mesh partitions, metal railings, metal windows and similar items as whole units. Salvage light-gage and cold-formed metal framing, such as steel studs, steel trusses, metal toilet partitions, toilet accessories and similar items. Scrap metal shall become the Contractor's property. Recycle scrap metal as part of demolition and deconstruction operations. Provide separate containers to collect scrap metal and transport to a scrap metal collection or recycling facility, in accordance with the Waste Management Plan.

g. Carpentry

(1) Salvage for recycle lumber, millwork items, and finished boards, and sort by type and size. Chip or shred and recycle salvaged wood unfit for reuse, except stained, painted, or treated wood. Remove windows, doors, frames, and cabinets, and similar items as whole units, complete with trim and accessories. Do not remove hardware attached to units, except for door closers. Brace the open end of door frames to prevent damage.

h. Acoustic Ceiling Tile

(1) Remove, neatly stack, and recycle acoustic ceiling tiles. Recycling may be available with manufacturer. Otherwise, priority shall be given to a local recycling organization.

i. Patching

(1) Where removals leave holes and damaged surfaces exposed in the finished work, patch and repair these holes and damaged surfaces to match adjacent finished surfaces, using on-site materials when available. Where new work is to be applied to existing surfaces, perform removals and patching in a manner to produce surfaces suitable for receiving new work. Finished surfaces of patched area shall be flush with the adjacent existing surface and shall match the existing adjacent surface as closely as possible as to texture and finish. Patching shall be as specified and indicated, and shall include:

(a) Concrete and Masonry: Completely fill holes and depressions, caused by previous physical damage or left as a result of removals in existing masonry walls to remain, with an approved masonry patching material, applied in accordance with the manufacturer's printed instructions.

(b) Where existing partitions have been removed leaving damaged or missing resilient tile flooring, patch to match the existing floor tile.

(c) Patch acoustic lay-in ceiling where partitions have been removed. The transition between the different ceiling heights shall be effected by continuing the higher ceiling level over to the first runner on the lower ceiling and closing the vertical opening with a painted sheet metal strip.

j. Air Conditioning Equipment

(1) Remove air conditioning, refrigeration, and other equipment containing refrigerants without releasing chlorofluorocarbon refrigerants to the atmosphere in accordance with the Clean Air Act Amendment of 1990. Recover all refrigerants prior to removing air conditioning, refrigeration, and other equipment containing refrigerants and dispose of in accordance with the paragraph entitled "Disposal of Ozone Depleting Substance (ODS)." Turn in salvaged Class I ODS refrigerants as specified in paragraph, "Salvaged Materials and Equipment."

k. Cylinders and Canisters

(1) Remove all fire suppression system cylinders and canisters and dispose of in accordance with the paragraph entitled "Disposal of Ozone Depleting Substance (ODS)."

l. Locksets on Swinging Doors

(1) The Contractor shall remove all locksets from all swinging doors indicated to be removed and disposed of. Deliver the locksets and related items to a designated location for receipt by the Contracting Officer after removal.

m. Mechanical Equipment and Fixtures

(1) Disconnect mechanical hardware at the nearest connection to existing services to remain, unless otherwise noted. Mechanical equipment and fixtures must be disconnected at fittings. Remove service valves attached to the unit. Salvage each item of equipment and fixtures as a whole unit; listed, indexed, tagged, and stored. Salvage each unit with its normal operating auxiliary equipment. Transport salvaged equipment and fixtures, including motors and machines, to a designated storage area as directed by the Contracting Officer. Do not remove equipment until approved. Do not offer low-efficiency equipment for reuse; provide to recycling service for disassembly and recycling of parts.

(2) Preparation for Storage

(a) Remove water, dirt, dust, and foreign matter from units; tanks, piping and fixtures shall be drained; interiors, if previously used to store flammable, explosive, or other dangerous liquids, must be steam cleaned. Seal openings with caps, plates, or plugs. Secure motors attached by flexible connections to the unit. Change lubricating systems with the proper oil or grease.

(3) Piping

(a) Disconnect piping at unions, flanges and valves, and fittings as required to reduce the pipe into straight lengths for practical storage. Store salvaged piping according to size and type. If the piping that remains can become pressurized due to upstream valve failure, end caps, blind flanges, or other types of plugs or fittings with a pressure gage and bleed valve shall be attached to the open end of the pipe to ensure positive leak control. Carefully dismantle piping that previously contained gas, gasoline, oil, or other dangerous fluids, with precautions taken to prevent injury to persons and property. Store piping outdoors until all fumes and residues are removed. Box prefabricated supports, hangers, plates, valves, and specialty items according to size and type. Wrap sprinkler heads individually in plastic bags before boxing. Classify piping not designated for salvage, or not reusable, as scrap metal.

(4) Ducts

(a) Classify removed duct work as scrap metal.

(5) Fixtures, Motors and Machines

(a) Remove and salvage fixtures, motors and machines associated with plumbing, heating, air conditioning, refrigeration, and other mechanical system installations. Salvage, box and store auxiliary units and accessories with the main motor and machines. Tag salvaged items for identification, storage, and protection from damage. Classify [non-porcelain] broken, damaged, or otherwise unserviceable units and not caused to be broken, damaged, or otherwise unserviceable as debris to be disposed of by the Contractor.

n. Electrical Equipment and Fixtures

(1) Salvage motors, motor controllers, and operating and control equipment that are attached to the driven equipment. Salvage wiring systems and components. Box loose items and tag for identification. Disconnect primary, secondary, control, communication, and signal circuits at the point of attachment to their distribution system.

(2) Fixtures

(a) Remove and salvage electrical fixtures. Salvage unprotected glassware from the fixture and salvage separately. Salvage incandescent, mercury-vapor, and fluorescent lamps and fluorescent ballasts manufactured prior to 1978, boxed and tagged for identification, and protected from breakage.

(3) Electrical Devices

(a) Remove and salvage switches, switchgear, transformers, conductors including wire and nonmetallic sheathed and flexible armored cable, regulators, meters, instruments, plates, circuit breakers, panelboards, outlet boxes, and similar items. Box and tag these items for identification according to type and size.

(4) Wiring Ducts or Troughs

(a) Remove and salvage wiring ducts or troughs. Dismantle plug-in ducts and wiring troughs into unit lengths. Remove plug-in or disconnecting devices from the busway and store separately.

(5) Conduit and Miscellaneous Items

(a) Salvage conduit except where embedded in concrete or masonry. Consider corroded, bent, or damaged conduit as scrap metal. Sort straight and undamaged lengths of conduit according to size and type. Classify supports, knobs, tubes, cleats, and straps as debris to be removed and disposed.

o. Items With Unique/Regulated Disposal Requirements

(1) Remove and dispose of items with unique or regulated disposal requirements in the manner dictated by law or in the most environmentally responsible manner.

3.2 PREPARATION

3.2.1 Protection

3.2.1.1 Traffic Control Signs

a. Where pedestrian and driver safety is endangered in the area of removal work, use traffic barricades. Anchor barricades in a manner to prevent displacement by wind, jet or prop blast. Notify the Contracting Officer prior to beginning such work.

b. Contractor must provide a minimum of 2 aviation red or high intensity white obstruction lights on temporary structures including cranes over 100 feet 30 meter above ground level. Light construction and installation must comply with FAA AC 70/7460-1. Lights must be operational during periods of reduced visibility, darkness, and as directed by the Contracting Officer. Maintain the temporary services during the period of construction and remove only after permanent services have been installed and tested and are in operation.

3.2.1.2 Documentation

a. Before beginning any demolition or deconstruction work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions in the presence of the Contracting Officer showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs sized 100 mm (4 inch) will be acceptable as a record of existing conditions. Include in the record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to before starting work. It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document.

3.2.1.3 Items to Remain in Place

a. Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer. Coordinate the work of this section with all other work indicated. Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract. Do not overload [structural elements] [pavements to remain]. Provide new supports and reinforcement for existing construction weakened by demolition, deconstruction, or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.

3.2.1.4 Existing Construction Limits and Protection

a. Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and migration of dust and dirt in all work areas. Remove [snow,] dust, dirt, and debris from work areas daily.

3.2.1.5 Weather Protection

a. For portions of the building to remain, protect building interior and materials and equipment from the weather at all times. Where removal of existing roofing is necessary to accomplish work, have materials and workmen ready to provide adequate and temporary covering of exposed areas.

3.2.1.6 Trees

a. Protect trees within the project site which might be damaged during demolition or deconstruction, and which are indicated to be left in place, by a 1.8 m( 6 foot) high fence. Erect and secure fence a minimum of 1.5 m( 5 feet) from the trunk of individual trees or follow the outer perimeter of branches or clumps of trees. Replace any tree designated to remain that is damaged during the work under this contract with like-kind or as approved by the Contracting Officer.

3.2.1.7 Utility Service

a. Maintain existing utilities indicated to stay in service and protect against damage during demolition and deconstruction operations. Prior to start of work, utilities serving each area of alteration or removal will be shut off by the Government and disconnected and sealed by the Contractor.

3.2.1.8 Facilities

a. Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Floors, roofs, walls, columns, pilasters, and other structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, must remain standing without additional bracing, shoring, or lateral support until demolished or deconstructed, unless directed otherwise by the Contracting Officer. Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract.

3.2.1.9 Protection of Personnel

a. Before, during and after the demolition and deconstruction work the Contractor shall continuously evaluate the condition of the structure being demolished and deconstructed and take immediate action to protect all personnel working in and around the project site. No area, section, or component of floors, roofs, walls, columns, pilasters, or other structural element will be allowed to be left standing without sufficient bracing, shoring, or lateral support to prevent collapse or failure while workmen remove debris or perform other work in the immediate area.

3.3 DISPOSITION OF MATERIALS

3.3.1 Title to Materials

3.3.1.1 Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting from demolition and deconstruction, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's demolition, deconstruction, and removal procedures, and authorization by the Contracting Officer to begin demolition and deconstruction. The Government will not be responsible for the condition or loss of, or damage to, such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.

3.3.2 Reuse of Materials and Equipment

3.3.2.1 Remove and store materials and equipment listed in the Demolition Plan indicated to be reused or relocated to prevent damage, and reinstall as the work progresses.

3.3.3 Salvaged Materials and Equipment

3.3.3.1 Remove materials and equipment that are listed in the Demolition Plan indicated to be removed by the Contractor and that are to remain the property of the Government, and deliver to a storage site as directed by the Contracting Officer.

a. Salvage items and material to the maximum extent possible.

b. Store all materials salvaged for the Contractor as approved by the Contracting Officer and remove from Government property before completion of the contract. Material salvaged for the Contractor shall not be sold on the site.

c. Remove salvaged items that are to remain the property of the Government in a manner to prevent damage, and pack or crated to protect the items from damage while in storage or during shipment. Items damaged during removal or storage must be repaired or replaced to match existing items. Properly identify the contents of containers. Deliver the following items reserved as property of the Government to a site designated by the Contracting Officer.

d. Remove all items reserved as property of the using service prior to commencement of work under this contract.

e. Remove historical items in a manner to prevent damage. Deliver the following historical items to the Government as directed by the Contracting Officer for disposition: Corner stones, contents of corner stones, and document boxes wherever located on the site.

f. Remove and capture all Class I ODS refrigerants in accordance with the Clean Air Act Amendment of 1990, by shipping the refrigerant container to the Defense Logistics Agency at the following address:

Defense Depot Richmond VA (DDVA)

SW0400

Cylinder Operations

800 Jefferson Davis Highway

Richmond, VA 23297-5000

3.3.4 Disposal of Ozone Depleting Substance (ODS)

3.3.4.1 Class I and Class II ODS are defined in Section, 602(a) and (b), of The Clean Air Act. Prevent discharge of Class I and Class II ODS to the atmosphere. Place recovered ODS in cylinders meeting ARI Guideline K suitable for the type ODS (filled to no more than 80 percent capacity) and provide appropriate labeling. Recovered ODS shall be removed from Government property and disposed of in accordance with 40 CFR 82. Products, equipment and appliances containing ODS in a sealed, self-contained system (e.g. residential refrigerators and window air conditioners) shall be disposed of in accordance with 40 CFR 82.

a. Special Instructions

(1) No more than one type of ODS is permitted in each container. A warning/hazardous label shall be applied to the containers in accordance with Department of Transportation regulations. All cylinders including but not limited to fire extinguishers, spheres, or canisters containing an ODS shall have a tag with the following information:

(a) Activity name and unit identification code

(b) Activity point of contact and phone number

(c) Type of ODS and pounds of ODS contained

(d) Date of shipment

b. Fire Suppression Containers

(1) Deactivate fire suppression system cylinders and canisters with electrical charges or initiators prior to shipment. Also, safety caps must be used to cover exposed actuation mechanisms and discharge ports on these special cylinders.

3.3.5 Transportation Guidance

3.3.5.1 Ship all ODS containers in accordance with MIL-STD-129, DLA 4145.25 (also referenced one of the following: Army Regulation 700-68, Naval Supply Instruction 4440.128C, Marine Corps Order 10330.2C, and Air Force Regulation 67-12), 49 CFR 173.301, and DOD 4000.25-1-M.

3.4 CLEANUP

3.4.1 Remove debris and rubbish from basement and similar excavations. Remove and transport the in a manner that prevents spillage on streets or adjacent areas. Apply local regulations regarding hauling and disposal.

3.5 DISPOSAL OF REMOVED MATERIALS

3.5.1 Regulation of Removed Materials

3.5.1.1 Dispose of debris, rubbish, scrap, and other nonsalvageable materials resulting from removal operations with all applicable federal, state and local regulations off of Moody AFB. Storage of removed materials on the project site is prohibited.

3.5.2 Burning on Government Property

3.5.2.1 Burning of materials removed from demolished and deconstructed structures will not be permitted on Moody Air Force Base. Transport combustible materials removed from demolished and deconstructed structures to an area designated for burning. Comply with Federal, State and local laws.

3.5.3 Removal to Spoil Areas on Government Property

3.5.3.1 Transport noncombustible materials removed from demolition and deconstruction structures to designated spoil areas on Government property as directed by the Contracting Officer.

3.5.4 Removal from Government Property

3.5.4.1 Transport waste materials removed from demolished and deconstructed structures, except waste soil, from Government property for legal disposal. Dispose of waste soil as directed.

3.6 REUSE OF SALVAGED ITEMS

3.6.1.1 If approved for reuse by the Contracting Officer recondition salvaged materials and equipment designated for reuse before installation. Replace items damaged during removal and salvage operations or restore them as necessary to usable condition.

END OF SECTION 02 41 00