05 05 23 WELDING STRUCTURAL.doc

DOC document 63 KB Posted

Attached to
Add/Alter Aerial Delivery Mobility Bag Storage Building
Solicitation number
FA4830-12-B-0001
Issued by

About this file

Attachment 3 Specifications Dated 2/21/2012 05 05 23 WELDING STRUCTURAL

View the file

Other files

File Type Posted
Questions and Answers of FBO.pdf PDF
amendment 3.pdf PDF
amendment 2.pdf PDF
Sign in sheet.pdf PDF
C101.pdf PDF
QUESTION FORM.doc DOC document
Amendment 1.doc DOC document
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS.doc DOC document
32 92 23 SODDING.doc DOC document
08 81 00 GLAZING.doc DOC document
A-10.pdf PDF
23 23 00 REFRIGERANT PIPING.doc DOC document
01 35 29 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS.doc DOC document
C102.pdf PDF
26 05 73.00 40 OVERCURRENT PROTECTIVE DEVICES.doc DOC document
26 41 01.00 10 LIGHTNING PROTECTION SYSTEM.doc DOC document
Solicitation.doc DOC document
08 11 13 STEEL DOORS AND FRAMES .doc DOC document
07 11 13 BITUMINOUS DAMPPROOFING.doc DOC document
26 24 16.00 40 PANELBOARDS.doc DOC document
E5.pdf PDF
23 00 00 AIR SUPPLY DISTRIBUTION VENTILATION AND EXHAUST.doc DOC document
33 30 00 SANITARY SEWERS.doc DOC document
10 26 13 WALL AND CORNER GUARDS.doc DOC document
Demo Plan2-Layout2.pdf PDF
m2.pdf PDF
02 41 00 DEMOLITION AND RECONSTRUCTION.doc DOC document
A-1.pdf PDF
31 60 00 FOUNDATION PREPARATION.doc DOC document
08 51 23 STEEL WINDOWS.doc DOC document
28 05 26.00 40 GROUNDING AND BONDING FOR ELECTRONIC SAFETY A.doc DOC document
E4 —
03 15 13 00 10 EXPANSION JOINTS CONTRACTION JOINTS AND WAT.doc DOC document
08 71 00 DOOR HARDWARE.doc DOC document
03 20 01.00 10 CONCRETE REINFORCEMENT.doc DOC document
Attach 1 Building Wage Determination.docx DOCX document
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM.doc DOC document
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS.doc DOC document
FP02.pdf PDF
A-9.pdf PDF
A-4.pdf PDF
sow.pdf PDF
E9.pdf PDF
A-5.pdf PDF
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS.doc DOC document
27 21 10.00 10 FIBER OPTIC DATA TRANSMISSION SYSTEM.doc DOC document
E6 —
26 51 00 INTERIOR LIGHTING.doc DOC document
X-1.pdf PDF
A-3.pdf PDF
Show 40 more

Latest 50 of 146 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 05 05 23

WELDING, STRUCTURAL

PART 1 GENERAL

1.1 REFERENCES

1.1.1 The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. Unless otherwise noted, the latest published version and/or revision shall be used.

1.1.1.1 AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

a. AISC 360

Specification for Structural Steel Buildings, with Commentary

1.1.1.2 AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)

a. ASNT RP SNT-TC-1A Recommended Practice

1.1.1.3 AMERICAN WELDING SOCIETY (AWS)

a. AWS A2.4

Standard Symbols for Welding, Brazing and Nondestructive

Examination

b. AWS A3.0

Standard Welding Terms and Definitions Including Terms for Adhesive Bonding, Brazing, Soldering, Thermal Cutting and Thermal Spraying

c. AWS D1.1

Structural Welding Code - Steel

d. AWS D1.3

Structural Welding Code - Sheet Steel

e. AWS D1.4

Structural Welding Code - Reinforcing Steel

AWS D14.1

Specification for Welding Industrial and Mill Cranes and Other Material Handling Equipment

f. AWS D14.4

Specification for Welded Joints in Machinery and Equipment

g. AWS Z49.1

Safety in Welding and Cutting and Allied Processes

1.1.1.4 ASTM INTERNATIONAL (ASTM)

a. ASTM E 165

Standard Test Method for Liquid Penetrant Examination

b. ASTM E 709

Standard Guide for Magnetic Particle Examination

1.2 DEFINITIONS

1.2.1 Definitions of welding terms are in accordance with AWS A3.0. The following classifications indicate the project's classes of weld joints.

1.2.1.1 Class 1 Weld Joints

a. This covers complete penetration weld joints only. These weld joints apply where failure would cause a loss of the system and/or be hazardous to personnel. Class 1 weld joints are highly stressed (dynamic and cyclic loading) and characterized as a single point of failure with no redundancy for the redistribution of stress into another member.

1.2.1.2 Class 2 Weld Joints

a. This covers both complete and partial penetration groove weld joints and fillet weld joints. These weld joints apply where failure would reduce the overall efficiency of a system but loss of the system or a hazard to personnel would not be experienced.

1.2.1.3 Class 3 Weld Joints

a. This covers both complete and partial penetration groove weld joints and fillet weld joints. These weld joints apply where failure would not affect the efficiency of a system nor create a hazard to personnel. Class 3 weld joints are connections of secondary members not subject to dynamic action and/or low stressed miscellaneous applications.

1.2.1.4 Class 4 Weld Joints

a. This covers weld joints applicable to welding reinforcing steel to primary structural members.

1.2.1.5 Class 5 Weld Joints

a. This covers weld joints applicable to welding concrete reinforcing steel splices (prestressing steel excepted), steel connection devices, and inserts and anchors required in concrete construction.

1.2.1.6 Class 6 Weld Joints

a. This covers plug and slot weld joints as applicable to the requirements of the project's code(s).

1.3 GENERAL REQUIREMENTS

1.3.1 Conform the design of welded connections to AISC 360, unless otherwise indicated or specified. Material with welds will not be accepted unless the welding is specified or indicated on the drawings or otherwise approved. Perform welding as specified in this section, except where additional requirements are shown on the drawings or are specified in other sections. Do not commence welding until welding procedures, inspectors, nondestructive testing personnel, welders, welding operators, and tackers have been qualified and the submittals approved by the Contracting Officer. Perform all testing at or near the work site. Each Contractor performing welding shall maintain records of the test results obtained in welding procedure, welder, welding operator, and tacker performance qualifications.

1.3.2 The Contractor shall receive and have present a current burn permit from the Base Fire Department for all welding.

1.4 SUBMITTALS

1.4.1 Government approval may be required on any of the following items. Items requiring submittals will be listed on the AF Form 66. Provide copies of all submittals per the requirements in Section 01 33 00, Submittal Procedures, or as listed on the AF Form 66.

1.4.1.1 SD-03 Product Data

a. Welding Procedure Qualifications

b. Welder, Welding Operator, and Tacker Qualification

c. Inspector Qualification

d. Previous Qualifications

e. Pre-qualified Procedures

(1) Copies of the welding procedure specifications; the procedure qualification test records; and the welder, welding operator, or tacker qualification test records.

1.4.1.2 SD-06 Test Reports

a. Quality Control

b. Nondestructive Examination

(1) A quality assurance plan and records of tests and inspections. Submit all records of nondestructive examination in accordance with paragraph STANDARDS OF ACCEPTANCE.

1.4.1.3 SD-07 Certificates

a. Certified Welding Procedure Specifications (WPS)

b. Certified Brazing Procedure Specifications (BPS)

c. Certified Procedure Qualification Records (PQR)

d. Certified Welder Performance Qualifications (WPQ)

e. Certified Brazer Performance Qualifications (BPQ)

(1) Certificates in accordance with paragraph "Other Applications".

1.5 WELDING PROCEDURE QUALIFICATIONS

1.5.1 Except for pre-qualified (per AWS D1.1) and previously qualified procedures, each Contractor performing welding shall record in detail and qualify the welding procedure specification for any welding procedure followed in the fabrication of weldments. Conform qualification of welding procedures to AWS D1.1 and to the specifications in this section. Submit for approval copies of the welding procedure specification and the results of the procedure qualification test for each type of welding which requires procedure qualification. Approval of any procedure, however, does not relieve the Contractor of the sole responsibility for producing a finished structure meeting all the specified requirements. Submit this information on the forms in Appendix E of AWS D1.1. Individually identify and clearly reference on the detail drawings and erection drawings all welding procedure specifications, or suitably key them to the contract drawings. In case of conflict between this specification and AWS D1.1, this specification governs.

1.5.1.1 General Requirements:

1.5.1.2 The organization performing this work must be certified in the following: American Institute of Steel Construction (AISC) Quality Certification Program Category I Conventional Steel Structures.

1.5.1.3 For Structural Projects, provide documentation of the following:

a. Component Thickness 1/8 inch and greater: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D1.1.

b. Component Thickness Less than 1/8 inch: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D1.3.

c. Reinforcing Steel: Qualification documents (WPS, PWR, and WPQ) in accordance with AWS D1.4.

1.5.1.4 For other applications, provide documentation of the following:

a. Submit for approval to the Contracting Officer two copies of Certified Welding Procedure Specifications (WPS), Certified Brazing Procedure Specifications (BPS) and Certified Procedure Qualification Records (PQR) within fifteen calendar days after receipt of Notice to Proceed.

b. Cranes: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D14.1.

c. Submit for approval to the Contracting Officer two copies of Certified Welder Performance Qualifications (WPQ) and Certified Brazer Performance Qualifications (BPQ) within fifteen calendar days prior to any employee welding on the project material.

d. Machinery: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D14.4.

1.5.1.5 Previous Qualifications:

1.5.1.6 Welding procedures previously qualified by test may be accepted for this contract without re-qualification if the following conditions are met:

a. Testing was performed by an approved testing laboratory, technical consultant, or the Contractor's approved quality control organization.

b. The qualified welding procedure conforms to the requirements of this specification and is applicable to welding conditions encountered under this contract.

c. The welder, welding operator, and tacker qualification tests conform to the requirements of this specification and are applicable to welding conditions encountered under this contract.

1.5.1.7 Pre-qualified Procedures:

1.5.1.8 Welding procedures which are considered pre-qualified as specified in AWS D1.1 will be accepted without further qualification. The Contractor shall submit for approval a listing or an annotated drawing to indicate the joints not pre-qualified. Procedure qualification is mandatory for these joints

1.5.1.9 Retests:

1.5.1.10 If welding procedure fails to meet the requirements of AWS D1.1, the procedure specification must be revised and re-qualified, or at the Contractor's option, welding procedure may be retested in accordance with AWS D1.1. If the welding procedure is qualified through retesting, all test results, including those of test welds that failed to meet the requirements, must be submitted with the welding procedure.

1.6 WELDER, WELDING OPERATOR, AND TACKER QUALIFICATION

1.6.1 Each welder, welding operator, and tacker assigned to work on this contract must be qualified in accordance with the applicable requirements of AWS D1.1 and as specified in this section. Welders, welding operators, and tackers who make acceptable procedure qualification test welds will be considered qualified for the welding procedure used.

1.6.1.1 Previous Personnel Qualifications

a. At the discretion of the Contracting Officer, welders, welding operators, and tackers qualified by test within the previous 6 months may be accepted for this contract without re-qualification if all the following conditions are met:

(1) Copies of the welding procedure specifications, the procedure qualification test records, and the welder, welding operator, and tacker qualification test records are submitted and approved in accordance with the specified requirements for detail drawings.

(2) Testing was performed by an approved testing laboratory, technical consultant, or the Contractor's approved quality control organization.

(3) The previously qualified welding procedure conforms to the requirements of this specification and is applicable to welding conditions encountered under this contract.

(4) The welder, welding operator, and tacker qualification tests conform to the requirements of this specification and are applicable to welding conditions encountered under this contract.

1.6.1.2 Certificates

a. Before assigning any welder, welding operator, or tacker to work under this contract, submit the names of the welders, welding operators, and tackers to be employed, and certification that each individual is qualified as specified. The certification must state the type of welding and positions for which the welder, welding operator, or tacker is qualified, the code and procedure under which the individual is qualified, the date qualified, and the name of the firm and person certifying the qualification tests. Keep the certification current, on file, and furnish 3 copies.

1.6.1.3 Renewal of Qualification

a. Re-qualification of a welder or welding operator is required under any of the following conditions:

(1) It has been more than 6 months since the welder or welding operator has used the specific welding process for which he is qualified.

(2) There is specific reason to question the welder or welding operator's ability to make welds that meet the requirements of these specifications.

(3) The welder or welding operator was qualified by an employer other than those firms performing work under this contract, and a qualification test has not been taken within the past 12 months. Submit as evidence of conformance all records showing periods of employment, name of employer where welder, or welding operator, was last employed, and the process for which qualified.

(4) A tacker who passes the qualification test is considered eligible to perform tack welding indefinitely in the positions and with the processes for which he is qualified, unless there is some specific reason to question the tacker's ability. In such a case, the tacker is required to pass the prescribed tack welding test.

1.7 INSPECTOR QUALIFICATION

1.7.1 Inspector qualifications must be in accordance with AWS D1.1. Qualify all nondestructive testing personnel in accordance with the requirements of ASNT RP SNT-TC-1A for Levels I or II in the applicable nondestructive testing method. The inspector may be supported by assistant welding inspectors who are not qualified to ASNT RP SNT-TC-1A, and assistant inspectors may perform specific inspection functions under the supervision of the qualified inspector.

1.8 SYMBOLS

1.8.1 Symbols must be in accordance with AWS A2.4, unless otherwise indicated.

1.9 SAFETY

1.9.1 Safe welding practices and safety precautions during welding must conform to AWS Z49.1.

PART 2 PRODUCTS

2.1 WELDING EQUIPMENT AND MATERIALS

2.1.1 All welding equipment, electrodes, welding wire, and fluxes must be capable of producing satisfactory welds when used by a qualified welder or welding operator performing qualified welding procedures. All welding equipment and materials shall comply with the applicable requirements of AWS D1.1. Welding electrodes shall be E70XX unless noted otherwise.

PART 3 EXECUTION

3.1 WELDING OPERATIONS

3.1.1 Requirements

3.1.1.1 Conform workmanship and techniques for welded construction to the requirements of AWS D1.1 and AISC 360. When AWS D1.1 and the AISC 360 specification conflict, the requirements of AWS D1.1 govern.

3.1.2 Identification

3.1.2.1 Identify all welds in one of the following ways:

a. Submit written records to indicate the location of welds made by each welder, welding operator, or tacker.

b. Identify all work performed by each welder, welding operator, or tacker with an assigned number, letter, or symbol to identify welds made by that individual. The Contracting Officer may require welders, welding operators, and tackers to apply their symbol next to the weld by means of rubber stamp, felt-tipped marker with waterproof ink, or other methods that do not cause an indentation in the metal. Place the identification mark for seam welds adjacent to the weld at 3 foot intervals. Identification with die stamps or electric etchers is not allowed.

3.2 QUALITY CONTROL

3.2.1 Perform testing using an approved inspection or testing laboratory or technical consultant; or if approved, the Contractor's inspection and testing personnel may be used instead of the commercial inspection or testing laboratory or technical consultant. Perform visual and radiographic, ultrasonic, magnetic particle, or dye penetrant inspections as appropriate to determine conformance with paragraph STANDARDS OF ACCEPTANCE. Conform procedures and techniques for inspection with applicable requirements of AWS D1.1, ASTM E 165, ASTM E 709, except that in radiographic inspection only film types designated as "fine grain," or "extra fine," are acceptable.

3.3 STANDARDS OF ACCEPTANCE

3.3.1 Conform dimensional tolerances for welded construction, details of welds, and quality of welds with the applicable requirements of AWS D1.1 and the contract drawings. Perform visual inspection and nondestructive testing by radiographic, ultrasonic, magnetic particle, or dye penetrant methods as appropriate. Provide visual inspection on 100 percent of all welds. The minimum extent of nondestructive testing must be 100 percent for complete and partial penetration welds and must be random 10 percent for all other welds.

3.3.1.1 Nondestructive Examination

a. The welding is subject to inspection and tests in the mill, shop, and field. Inspection and tests in the mill or shop do not relieve the Contractor of the responsibility to furnish weldments of satisfactory quality. When materials or workmanship do not conform to the specification requirements, the Government reserves the right to reject material or workmanship or both at any time before final acceptance of the structure containing the weldment.

3.3.1.2 Destructive Tests

a. Make all repairs when metallographic specimens are removed from any part of a structure. Employ only qualified welders or welding operators, and use the proper joints and welding procedures, including peening or heat treatment if required, to develop the full strength of the members and joints cut and to relieve residual stress.

3.4 GOVERNMENT INSPECTION AND TESTING

3.4.1 In addition to the inspection and tests performed by the Contractor for quality control, the Government will perform inspection and testing for acceptance to the extent determined by the Contracting Officer. The costs of such inspection and testing will be borne by the Contractor if unsatisfactory welds are discovered, or by the Government if the welds are satisfactory. The work may be performed by the Government's own forces or under a separate contract for inspection and testing. The Government reserves the right to perform supplemental nondestructive and destructive tests to determine compliance with paragraph STANDARDS OF ACCEPTANCE.

3.5 CORRECTIONS AND REPAIRS

3.5.1 If inspection or testing indicates defects in the weld joints, repair defective welds using a qualified welder or welding operator as applicable. Conduct corrections in accordance with the requirements of AWS D1.1 and the specifications. Repair all defects in accordance with the approved procedures. Repair defects discovered between passes before additional weld material is deposited. Wherever a defect is removed and repair by welding is not required, blend the affected area into the surrounding surface to eliminate sharp notches, crevices, or corners. After a defect is thought to have been removed, and before re-welding, examine the area by suitable methods to ensure that the defect has been eliminated. Repaired welds shall meet the inspection requirements for the original welds. Any indication of a defect is regarded as a defect, unless re-evaluation by nondestructive methods or by surface conditioning shows that no unacceptable defect is present.

END OF SECTION 05 05 23