Attachment 3 Specifications Dated 2/21/2012 31 32 11 SOIL SURFACE EROSION CONTROL

View the file

Other files

File Type Posted
Questions and Answers of FBO.pdf PDF
amendment 3.pdf PDF
amendment 2.pdf PDF
Sign in sheet.pdf PDF
C101.pdf PDF
QUESTION FORM.doc DOC document
Amendment 1.doc DOC document
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS.doc DOC document
05 05 23 WELDING STRUCTURAL.doc DOC document
32 92 23 SODDING.doc DOC document
08 81 00 GLAZING.doc DOC document
A-10.pdf PDF
23 23 00 REFRIGERANT PIPING.doc DOC document
01 35 29 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS.doc DOC document
C102.pdf PDF
26 05 73.00 40 OVERCURRENT PROTECTIVE DEVICES.doc DOC document
26 41 01.00 10 LIGHTNING PROTECTION SYSTEM.doc DOC document
Solicitation.doc DOC document
08 11 13 STEEL DOORS AND FRAMES .doc DOC document
07 11 13 BITUMINOUS DAMPPROOFING.doc DOC document
26 24 16.00 40 PANELBOARDS.doc DOC document
E5.pdf PDF
23 00 00 AIR SUPPLY DISTRIBUTION VENTILATION AND EXHAUST.doc DOC document
33 30 00 SANITARY SEWERS.doc DOC document
10 26 13 WALL AND CORNER GUARDS.doc DOC document
Demo Plan2-Layout2.pdf PDF
m2.pdf PDF
02 41 00 DEMOLITION AND RECONSTRUCTION.doc DOC document
A-1.pdf PDF
31 60 00 FOUNDATION PREPARATION.doc DOC document
08 51 23 STEEL WINDOWS.doc DOC document
28 05 26.00 40 GROUNDING AND BONDING FOR ELECTRONIC SAFETY A.doc DOC document
E4 —
03 15 13 00 10 EXPANSION JOINTS CONTRACTION JOINTS AND WAT.doc DOC document
08 71 00 DOOR HARDWARE.doc DOC document
03 20 01.00 10 CONCRETE REINFORCEMENT.doc DOC document
Attach 1 Building Wage Determination.docx DOCX document
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM.doc DOC document
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS.doc DOC document
FP02.pdf PDF
A-9.pdf PDF
A-4.pdf PDF
sow.pdf PDF
E9.pdf PDF
A-5.pdf PDF
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS.doc DOC document
27 21 10.00 10 FIBER OPTIC DATA TRANSMISSION SYSTEM.doc DOC document
E6 —
26 51 00 INTERIOR LIGHTING.doc DOC document
X-1.pdf PDF
Show 40 more

Latest 50 of 146 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 31 32 11

SOIL SURFACE EROSION CONTROL

PART 1 GENERAL

1.1 REFERENCES

1.1.1 The latest issue of the publications listed below and referenced to thereafter by basic designation only, forms a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

1.1.1.1 ASTM INTERNATIONAL (ASTM)

a. ASTM C 140 Standard Test Methods for Sampling and Testing Concrete Masonry Units and Related Units

b. ASTM C 39/C 39M Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens

c. ASTM C 42/C 42M Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete

d. ASTM D 1248 Standard Specification for Polyethylene Plastics Extrusion Materials for Wire and Cable

e. ASTM D 1560 Resistance to Deformation and Cohesion of Bituminous Mixtures by Means of Hveem Apparatus

f. ASTM D 1682 Test for Breaking Load and Elongation of Textile Fabrics

g. ASTM D 1777 Thickness of Textile Materials

h. ASTM D 2028 Cutback Asphalt (Rapid-Curing Type)

i. ASTM D 2844 Resistance R-Value and Expansion Pressure of Compacted Soils

j. ASTM D 3776 Mass Per Unit Area (Weight) of Fabric

k. ASTM D 3787 Bursting Strength of Textiles - Constant-Rate-of-Traverse (CRT), Ball Burst Test

l. ASTM D 3884 Abrasion Resistance of Textile Fabrics (Rotary Platform, Double-Head Method)

m. ASTM D 4355 Deterioration of Geotextiles from Exposure to Light, Moisture and Heat in a Xenon-Arc Type Apparatus

n. ASTM D 4491 Water Permeability of Geotextiles by Permittivity

o. ASTM D 4533 Trapezoid Tearing Strength of Geotextiles

p. ASTM D 4595 Tensile Properties of Geotextiles by the Wide-Width Strip Method

q. ASTM D 4632 Grab Breaking Load and Elongation of Geotextiles

r. ASTM D 4751 Determining Apparent Opening Size of a Geotextile

s. ASTM D 4833 Index Puncture Resistance of Geotextiles, Geomembranes, and Related Products

t. ASTM D 4972 pH of Soils

u. ASTM D 5035 Breaking Force and Elongation of Textile Fabrics (Strip Method)

v. ASTM D 5268 Topsoil Used for Landscaping Purposes

w. ASTM D 5852 Standard Test Method for Erodibility Determination of Soil in the Field or in the Laboratory by the Jet Index Method

x. ASTM D 648 Deflection Temperature of Plastics Under Flexural Load in the Edgewise Position

y. ASTM D 6629 Selection of Methods for Estimating Soil Loss by Erosion

z. ASTM D 698 Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.))

aa. ASTM D 977 Emulsified Asphalt

1.1.1.2 U.S. DEPARTMENT OF AGRICULTURE (USDA)

a. AMS Seed Act Federal Seed Act

1.1.1.3 U.S. GREEN BUILDING COUNCIL (USGBC)

a. LEED Leadership in Energy and Environmental Design(tm) Green Building Rating System for New Construction (LEED-NC)

1.2 SUBMITTALS

1.2.1 Government approval may be required on any of the following items. Items requiring submittals shall be listed on the AF Form 66. Copies of all submittals shall be provided per the requirements in Section 01 33 00, Submittal Procedures, or as listed on the AF Form 66.

1.2.1.1 SD-01 Preconstruction Submittals

a. Work sequence schedule

b. Erosion control plan

1.2.1.2 SD-02 Shop Drawings

a. Layout

b. Obstructions Below Ground

c. Erosion Control

(1) Scale drawings defining areas to receive recommended materials as required by federal, state or local regulations.

d. Seed Establishment Period

(1) Calendar time period for the seed establishment period. When there may be more than one seed establishment period, the boundaries of the seeded area covered for each period shall be described.

e. Maintenance Record

(1) Record of maintenance work performed, of measurements and findings for product failure, recommendations for repair, and products replaced.

1.2.1.3 SD-03 Product Data

a. Local/Regional Materials;

(1) Documentation indicating distance between manufacturing facility and the project site. Indicate distance of raw material origin from the project site. Indicate relative dollar value of local/regional materials to total dollar value of products included in project.

b. Biobased Materials

(1) Documentation indicating type of biobased material in product and biobased content. Indicate relative dollar value of biobased content products to total dollar value of products included in project.

(a) Geosynthetic Binders

(b) Recycled Plastic;

(c) Wood Cellulose Fiber;

(d) Paper Fiber;

(e) Mulch Control Netting and Filter Fabric;

(f) Hydraulic Mulch;

(g) Erosion Control Blankets Type XI;

(h) Geotextile Fabrics;

(i) Aggregate;

(j) Synthetic Grid Systems

(k) Articulating Cellular Concrete Block Systems

(2) Manufacturer's literature including physical characteristics, application and installation instructions. Documentation indicating percentage of post-industrial and post-consumer recycled content per unit of product. Indicate relative dollar value of recycled content products to total dollar value of products included in project.

c. Equipment

(1) A listing of equipment to be used for the application of erosion control materials.

(a) Finished Grade

(b) Erosion Control Blankets

(2) Condition of finish grade status prior to installation; location of underground utilities and facilities.

1.2.1.4 SD-04 Samples

a. Materials

(1) Geosynthetic and synthetic binding material; 1 quart.

(2) Standard mulch; 2 pounds.

(3) Hydraulic mulch; 2 pounds.

(4) Geotextile fabrics; 6 inch square.

(5) Erosion control blankets; 6 inch square.

(6) Synthetic grid systems; One sample grid.

(7) Articulating cellular concrete block systems; 100 square feet area.

(8) Two color charts displaying the colors and finishes for the articulating cellular block system.

1.2.1.5 SD-06 Test Reports

a. Geosynthetic Binders

b. Hydraulic Mulch

c. Geotextile Fabrics

d. Erosion Control Blankets

e. Synthetic Grid Systems

f. Articulating Cellular Concrete Block Systems

(1) Certified reports of inspections and laboratory tests, prepared by an independent testing agency, including analysis and interpretation of test results. Each report shall be properly identified. Test methods used and compliance with recognized test standards shall be described.

g. Sand

h. Gravel

(1) Sieve test results. Sand shall be uniformly graded.

1.2.1.6 SD-07 Certificates

a. Fill Material

b. Mulch

c. Hydraulic Mulch

d. Geotextile Fabrics

(1) Prior to delivery of materials, certificates of compliance attesting that materials meet the specified requirements. Certified copies of the material certificates shall include the following.

(2) For items listed in this section:

(a) Certification of recycled content or,

(b) Statement of recycled content.

(c) Certification of origin including the name, address and telephone number of manufacturer.

(3) Geosynthetic Binders

(4) Synthetic Soil Binders

(a) Certification for binders showing EPA registered uses, toxicity levels, and application hazards.

e. Installer's Qualification

(1) The installer's company name and address; training and experience and or certification.

f. Recycled Plastic

(1) Individual component and assembled unit structural integrity test; creep tolerance; deflection tolerance; and vertical load test results. Life-cycle durability.

g. Seed

(1) Classification, botanical name, common name, percent pure live seed, minimum percent germination and hard seed, maximum percent weed seed content, and date tested.

(a) Asphalt Adhesive

(b) Tackifier

h. Composition.

(1) Wood By-Products

(a) Composition, source, and particle size. Products shall be free from toxic chemicals or hazardous material.

(2) Wood Cellulose Fiber

(a) Certification stating that wood components were obtained from managed forests.

1.2.1.7 SD-10 Operation and Maintenance Data

a. Maintenance Instructions

(1) Instruction for year-round care of installed material. The Contractor shall include manufacturer supplied spare parts.

1.2.1.8 SD-11 Closeout Submittals

a. Local/Regional Materials;

(1) Recycled Plastic;

(2) Wood Cellulose Fiber;

(3) Paper Fiber;

(4) Mulch Control Netting and Filter Fabric;

(5) Hydraulic Mulch

(6) Erosion Control Blankets Type XI;

(7) Geotextile Fabrics

(8) Aggregate;

1.3 MEASUREMENT AND PAYMENT

1.3.1 Standard and Geosynthetic Binder

1.3.1.1 The standard and geosynthetic binder shall be measured by the square yard of surface area covered. No measurement for payment shall be made for fine grading, trenching or other miscellaneous materials necessary for placement of the binder.

1.3.2 Mulch and Compost

1.3.2.1 Mulch and compost shall be measured by the square yard of surface area covered. No measurement for payment shall be made for binder, dye or other miscellaneous materials or equipment necessary for placement of the mulch or compost.

1.3.3 Hydraulic Mulch

1.3.3.1 Hydraulic mulch shall be measured by the square yard of surface area covered. Measurement for payment shall include binder, dye or both. No measurement for payment shall be made for other miscellaneous materials or equipment necessary for placement of the hydraulic mulch.

1.3.4 Geotextile Fabric

1.3.4.1 Geotextile fabrics shall be measured by the square yard of surface area covered. No measurement for payment shall be made for fine grading, trenching or other miscellaneous materials necessary for placement of the fabric.

1.3.5 Erosion Control Blankets

1.3.5.1 Erosion control blankets shall be measured by the square yard of surface area covered. No measurement for payment shall be made for fine grading, trenching or other miscellaneous materials necessary for placement of the erosion control blankets.

1.3.6 Synthetic Grid/Sheet Systems

1.3.6.1 Synthetic grid/sheet system shall be measured by the square yard of surface area covered. No measurement for payment shall be made for fine grading, trenching, geotextile, seams, grout, rock, topsoil or other miscellaneous materials necessary for placement of the articulating cellular concrete block system.

1.3.7 Cellular Concrete Block Systems

1.3.7.1 Articulating cellular concrete block system shall be measured by the square yard of surface area covered. No measurement for payment shall be made for fine grading, trenching, geotextile, seams, grout, rock, topsoil or other miscellaneous materials necessary for placement of the articulating cellular concrete block system.

1.4 DESCRIPTION OF WORK

1.4.1 The work consists of furnishing and installing temporary and permanent soil surface erosion control materials to prevent the pollution of air, water, and land, including fine grading, blanketing, stapling, mulching, vegetative measures, structural measures, and miscellaneous related work, within project limits and in areas outside the project limits where the soil surface may be disturbed from work under this contract at the designated locations. This work includes all necessary materials, labor, supervision and equipment for installation of a complete system. Coordinate this section with the requirements of Section 31 00 00 EARTHWORK and Section 32 92 19 SEEDING, and Section 32 92 23 SODDING.

1.5 DELIVERY, INSPECTION, STORAGE, AND HANDLING

1.5.1 Materials shall be stored in designated areas and as recommended by the manufacturer protected from the elements, direct exposure, and damage. Do not drop containers from trucks. Material shall be free of defects that would void required performance or warranty. Deliver geosynthetic binders and synthetic soil binders in the manufacturer's original sealed containers and stored in a secure area.

1.5.1.1 Furnish erosion control blankets and geotextile fabric in rolls with suitable wrapping to protect against moisture and extended ultraviolet exposure prior to placement. Label erosion control blanket and geotextile fabric rolls to provide identification sufficient for inventory and quality control purposes.

1.5.1.2 All synthetic grids, synthetic sheets, and articulating cellular concrete block grids shall be sound and free of defects that would interfere with the proper placing of the block or impair the strength or permanence of the construction. Minor cracks in synthetic grids and concrete cellular block, incidental to the usual methods of manufacture, or resulting from standard methods of handling in shipment and delivery, shall not be deemed grounds for rejection.

1.5.1.3 Seed shall be inspected upon arrival at the jobsite for conformity to species and quality. Seed that may be wet, moldy, or bears a test date five months or older, shall be rejected.

1.6 SUBSTITUTIONS

1.6.1 Substitutions shall not be allowed without written request and approval from the Contracting Officer.

1.7 QUALITY ASSURANCE

1.7.1 Installer's Qualification

1.7.1.1 The installer shall be certified by the manufacturer for training and experience installing the material.

1.7.2 Erosion Potential

1.7.2.1 Assess potential effects of soil management practices on soil loss in accordance with ASTM D 6629. Assess erodibility of soil with dominant soil structure less than 2.8 to 3.1 inches in accordance with ASTM D 5852.

1.8 SCHEDULING

1.8.1 A construction work sequence schedule shall be submitted, with the state or local government approved erosion control plan a minimum of 30 days prior to start of construction. The work schedule shall coordinate the timing of land disturbing activities with the provision of erosion control measures to reduce on-site erosion and off-site sedimentation. Coordinate installation of temporary erosion control features with the construction of permanent erosion control features to assure effective and continuous control of erosion, pollution, and sediment deposition. Include a vegetative plan with planting and seeding dates and fertilizer, lime, and mulching rates. Distribute copies of the work schedule and erosion control plan to site subcontractors. Address the following in the erosion control plan:

a. Statement of erosion control and stormwater control objectives.

b. Description of temporary and permanent erosion control, stormwater control, and air pollution control measures to be implemented on site.

c. Description of the type and frequency of maintenance activities required for the chosen erosion control methods.

d. Comparison of proposed post-development stormwater runoff conditions with predevelopment conditions.

1.9 TIME LIMITATIONS

1.9.1 Backfilling the openings in synthetic grid systems and articulating cellular concrete block systems shall be completed a maximum 7 days after placement to protect the material from ultraviolet radiation.

1.10 SUSTAINABLE DESIGN REQUIREMENTS

1.10.1 Local/Regional Materials

1.10.1.1 Use materials or products extracted, harvested, or recovered, as well as manufactured, within a 500 mile radius from the project site, if available from a minimum of three sources. See Section 01 33 29 LEED(tm) DOCUMENTATION for cumulative total local material requirements. Erosion control materials may be locally available.

1.10.2 Biobased Materials

1.10.2.1 Use biobased materials when feasible and as specified.

1.11 WARRANTY

1.11.1 Erosion control material shall have a warranty for use and durable condition for project specific installations. Temporary erosion control materials shall carry a minimum eighteen month warranty. Permanent erosion control materials shall carry a minimum three year warranty.

PART 2 PRODUCTS

2.1 RECYCLED PLASTIC

2.1.1 Recycled plastic shall contain a minimum 85 percent of recycled post-consumer product. Recycled material shall be constructed or manufactured with a maximum 1/4 inch deflection or creep in any member, according to ASTM D 648 and ASTM D 1248. The components shall be molded of ultraviolet (UV) and color stabilized polyethylene. The material shall consist of a minimum 75 percent plastic profile of high-density polyethylene, low-density polyethylene, and polypropylene raw material. The material shall be non-toxic and have no discernible contaminates such as paper, foil, or wood. The material shall contain a maximum 3 percent air voids and shall be free of splinters, chips, peels, buckling, and cracks. Material shall be resistant to deformation from solar heat gain.

2.2 BINDERS

2.2.1 Synthetic Soil Binders

2.2.1.1 Calcium chloride or other standard manufacturer's spray on adhesives designed for dust suppression.

2.2.2 Geosynthetic Binders

2.2.2.1 Geosynthetic binders shall be manufactured in accordance with ASTM D 1560, ASTM D 2844; and shall be referred to as products manufactured for use as modified emulsions for the purpose of erosion control and soil stabilization. Emulsions shall be manufactured from all natural materials and provide a hard durable finish.

2.3 MULCH

2.3.1 Mulch shall be free from weeds, mold, and other deleterious materials. Mulch materials shall be native to the region.

2.3.2 Straw

2.3.2.1 Straw shall be stalks from oats, wheat, rye, barley, or rice, furnished in air-dry condition and with a consistency for placing with commercial mulch-blowing equipment.

2.3.3 Hay

2.3.3.1 Hay shall be native hay, sudan-grass hay, broomsedge hay, or other herbaceous mowings, furnished in an air-dry condition suitable for placing with commercial mulch-blowing equipment.

2.3.4 Wood Cellulose Fiber

2.3.4.1 Wood cellulose fiber shall be 100 percent recycled material and shall not contain any growth or germination-inhibiting factors and shall be dyed with non-toxic, biodegradable dye an appropriate color to facilitate placement during application. Composition on air-dry weight basis: a minimum 9 to a maximum 15 percent moisture, and between a minimum 4.5 to a maximum 6.0 pH. See Section 01 33 29 LEED(tm) DOCUMENTATION for cumulative total recycled content requirements. This item may contain post-consumer or post-industrial recycled content. Wood cellulose fiber shall not contain environmentally hazardous levels of heavy metals. Materials may be bulk tested or tested by toxicity characteristic leaching procedure (TCLP).

2.3.5 Paper Fiber

2.3.5.1 Paper fiber mulch shall be 100 percent post-consumer recycled news print that is shredded for the purpose of mulching seed. See Section 01 33 29 LEED(tm) DOCUMENTATION for cumulative total recycled content requirements.

2.3.6 Shredded Bark

2.3.6.1 Locally shredded material shall be treated to retard the growth of mold and fungi.

2.3.7 Wood By-Products

2.3.7.1 Wood locally chipped or ground bark shall be treated to retard the growth of mold and fungi. Gradation: A maximum 2 inch wide by 4 inch long.

2.3.8 Coir

2.3.8.1 Coir shall be manufactured from 100 percent coconut fiber cured in fresh water for a minimum of 6 months.

2.3.9 Asphalt Adhesive

2.3.9.1 Asphalt adhesive shall conform to the following: Emulsified asphalt, conforming to ASTM D 977, Grade SS-1; and cutback asphalt, conforming to ASTM D 2028, Designation RC-70.

2.3.10 Mulch Control Netting and Filter Fabric

2.3.10.1 Mulch control netting and filter fabric shall be constructed of lightweight recycled plastic, cotton, or paper or organic fiber. The recycled plastic shall be a woven or nonwoven polypropylene, nylon, or polyester containing stabilizers and/or inhibitors to make the fabric resistant to deterioration from UV, and with the following properties:

a. Minimum grab tensile strength (TF 25 #1/ASTM D 4632), 180 pounds.

b. Minimum Puncture (TF 25 #4/ASTM D 3787), 75 psi in the weakest direction.

c. Apparent opening sieve size of a minimum 40 and maximum 80 (U.S. Sieve Size).

d. Minimum Trapezoidal tear strength (TF 25 #2/ASTM D 4533), 50 pounds.

2.3.11 Hydraulic Mulch

2.3.11.1 Hydraulic mulch shall be made of 100 percent recycled material virgin aspen wood fibers. Wood shall be naturally air-dried to a moisture content of 10.0 percent, plus or minus 3.0 percent. A minimum of 50 percent of the fibers shall be equal to or greater than 0.15 inch in length and a minimum of 75 percent of the fibers shall be retained on a 28 mesh screen. No reprocessed paper fibers shall be included in the hydraulic mulch. Hydraulic mulch shall have the following mixture characteristics:

CHARACTERISTIC (typical)

VALUE

pH

5.4 + 0.1

Organic Matter (oven dried basis), percent 99.3 within + 0.2 Inorganic Ash (oven dried basis), percent 0.7 within + 0.2 Water Holding Capacity, percent 1,401

2.3.12 Tackifier

2.3.12.1 Tackifier shall be a blended polyacrylimide material with non-ionic galactomannan of Gramineae endosperm in powder and crystalline form with molecular weights over 250,000. Tackifier shall be pre-packaged in the hydraulic mulch as recommended by the local agriculture county extension service office.

2.3.13 Dye

2.3.13.1 Dye shall be a water-activated, green color. Pre-package dye in water dissolvable packets in the hydraulic mulch.

2.4 COMPOST FILTER BERMS

2.4.1 Compost berms shall consist of 100 percent biobased windrow-trapezoidal-shaped compost piles arranged across slopes. Berms shall have the following properties:

Parameter

Range

Particle size

( 3/8-1/2 inch) sieve and ( 2-3 inch) sieve (ratio = 1:1)

Moisture content 20% - 50%

Soluble salt

4.0 - 6.0 mmhos/cm

Organic matter

40% - 70% pH

6.0 - 8.0

Nitrogen content 0.5% - 2.0%

Human made inerts 0.0% - 1.0%

Size

( 1 - 2 feet) H x ( 2.5 - 4 feet) W ( 2 feet) H x ( 2 - 3 feet) W at top, at least ( 4 feet) W at base

2.5 AGGREGATE

2.5.1 Aggregate shall be onsite or offsite material generated from grading and demolition operations, as available. Recycled crushed concrete shall be free of steel, free-draining and graded between a minimum 3/4 inch and a maximum 1.5 inches. Submit sieve test results for both gravel and sand.

2.6 WATER

2.6.1 Unless otherwise directed, water shall be the responsibility of the Contractor. Water shall be collected rainwater, greywater, potable or supplied by an existing irrigation system.

PART 3 EXECUTION

3.1 CONDITIONS

3.1.1 Erosion control operations shall be performed under favorable weather conditions; when excessive moisture, frozen ground or other unsatisfactory conditions prevail, the work shall be stopped as directed. When special conditions warrant a variance to earthwork operations, submit a revised construction schedule for approval. Do not apply erosion control materials in adverse weather conditions which could affect their performance.

3.1.2 Finished Grade

3.1.2.1 Verify that finished grades are as indicated on the drawings; complete finish grading and compaction in accordance with Section 31 00 00 EARTHWORK, prior to the commencement of the work. Verify and mark the location of underground utilities and facilities in the area of the work. Repair damage to underground utilities and facilities at the Contractor's expense.

3.2 SITE PREPARATION

3.2.1 Soil Test

3.2.1.1 Test soil in accordance with ASTM D 5268 and ASTM D 4972 for determining the particle size and mechanical analysis. Sample collection onsite shall be random over the entire site. The test shall determine the soil particle size as compatible for the specified material.

3.2.2 Layout

3.2.2.1 Erosion control material locations may be adjusted to meet field conditions. When soil tests result in unacceptable particle sizes, a shop drawing shall be submitted indicating the corrective measures.

3.2.3 Protecting Existing Vegetation

3.2.3.1 When there are established lawns in the work area, the turf shall be covered and/or protected or replaced after construction operations. Identify existing trees, shrubs, plant beds, and landscape features that are to be preserved on site by appropriate tags and barricade with reusable, high-visibility fencing along the dripline. Mitigate damage to existing trees at no additional cost to the Government. Damage shall be assessed by a state certified arborist or other approved professional using the National Arborist Association's tree valuation guideline.

3.2.4 Obstructions Below Ground

3.2.4.1 When obstructions below ground affect the work, submit shop drawings showing proposed adjustments to placement of erosion control material for approval.

3.3 INSTALLATION

3.3.1 Exposed soil shall be immediately stabilized using fabric, mulch, compost, and seed. Stabilize areas for construction access immediately as specified in the paragraph Construction Entrance. Install principal sediment basins and traps before any major site grading takes place. Additional sediment traps and sediment fences shall be provided as grading progresses. Inlet and outlet protection shall be provided at the ends of new drainage systems. Temporary erosion control measures shall be removed at the end of construction and provide permanent seeding.

3.3.2 Construction Entrance

3.3.2.1 As indicated on drawings, a minimum of 6 inches thick shall be provided, at points of vehicular ingress and egress on the construction site. Construction entrances shall be cleared and grubbed, and then excavated a minimum of 3 inches prior to placement of the filter fabric and aggregate. The aggregate shall be placed in a manner that shall prevent damage and movement of the fabric. Place fabric in one piece, where possible. Overlap fabric joints a minimum of 12 inches.

3.3.3 Compost Filter Berms

3.3.3.1 Place compost filter berm uncompacted on bare soil as indicated on drawings, parallel to base of slope, and according to manufacturer recommendations. Place second berm in the same manner at top of slope parallel to first berm. When no longer required, berm material may be left to decompose naturally, or distributed over an adjacent area for use as a soil amendment or ground cover.

3.3.4 Seeding

3.3.4.1 When seeding shall be required prior to installing mulch on synthetic grid systems verify that seeding shall be completed in accordance with Sections 31 00 00 EARTHWORK and 32 92 19 SEEDING.

3.3.5 Mulch Installation

3.3.5.1 Mulch shall be installed in the areas indicated. Mulch shall be applied evenly at the rate as indicated.

3.3.6 Wood Cellulose Fiber, Paper Fiber, and Recycled Paper

3.3.6.1 Wood cellulose fiber, paper fiber, or recycled paper shall be applied as part of the hydraulic mulch operation.

3.3.7 Hydraulic Mulch Application

3.3.7.1 Unseeded Area

a. Hydraulic mulch shall be installed as indicated and in accordance with manufacturer's recommendations. Mix hydraulic mulch with water at the rate recommended by the manufacturer for the area to be covered. Mixing shall be done in equipment manufactured specifically for hydraulic mulching work, including an agitator in the mixing tank to keep the mulch evenly disbursed.

3.3.7.2 Seeded Area

a. For drill or broadcast seeded areas, hydraulic mulch shall be applied evenly at the rates recommended by the local agriculture county extension service office. For hydraulic seeded areas, apply mulch at the rates recommended by the local agriculture county extension service office with the seed and fertilizer, and at the rates recommended by the local agriculture county extension service office in a second application of mulch only.

3.4 CLEAN-UP

3.4.1 Excess material, debris, and waste materials shall be disposed of offsite at an approved landfill or recycling center. Clear adjacent paved areas. Immediately upon completion of the installation in an area, protect the area against traffic or other use by erecting barricades and providing signage as required, or as directed. Signage shall be in accordance with Section 10 14 01 EXTERIOR SIGNAGE.

3.5 WATERING SEED

3.5.1 Start watering immediately after installing erosion control blanket type XI (revegetation mat). Apply water to supplement rainfall at a sufficient rate to ensure moist soil conditions to a minimum 1 inch depth. Prevent run-off and puddling. Do no drive watering trucks over turf areas, unless otherwise directed. Prevent watering of other adjacent areas or plant material.

3.6 MAINTENANCE RECORD

3.6.1 A record shall be furnished describing the maintenance work performed, record of measurements and findings for product failure, recommendations for repair, and products replaced.

3.6.2 Maintenance

3.6.2.1 Maintenance shall include eradicating weeds; protecting embankments and ditches from surface erosion; maintaining the performance of the erosion control materials and mulch; protecting installed areas from traffic.

3.6.3 Maintenance Instructions

3.6.3.1 Written instructions shall be furnished containing drawings and other necessary information, describing the care of the installed material; including, when and where maintenance should occur, and the procedures for material replacement.

3.6.4 Patching and Replacement

3.6.4.1 Unless otherwise directed, material shall be placed, seamed or patched as recommended by the manufacturer. Remove material not meeting the required performance as a result of placement, seaming or patching from the site. Replace the unacceptable material at no additional cost to the Government.

3.7 SATISFACTORY STAND OF GRASS PLANTS

3.7.1 When erosion control blanket type XI (revegetation mat) is installed, evaluate the grass plants for species and health when the grass plants are a minimum 1 inch high. A satisfactory stand of grass plants from the revegetation mat area shall be a minimum 10 grass plants per square foot. The total bare spots shall not exceed 2 percent of the total revegetation mat area.

END OF SECTION 31 32 11