Questions and Answers.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Demolition of Facilities Phase 6 Federal contract opportunity
Solicitation number
FA4819-20-R-1000
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains questions and answers regarding a solicitation for demolition services at Tyndall Air Force Base in Florida. The solicitation seeks fixed price demolition of facilities, abandonment of utility lines, and site restoration. Contractors must remove foundations entirely, secure sites after abatement, and use Pensacola Bahia grass for restoration without hydroseeding near airfields. The response due date is June 15, 2020. The contracting office provides contacts and notes that a schedule will be required after award. Environmental and safety plans are required, and an archaeologist must be onsite during excavations.

View the file

Other files for this federal contract opportunity

Other files attached to Demolition of Facilities Phase 6, newest first.
File Type Posted
Late Questions and Answers.xlsx XLSX spreadsheet
Questions and Answers.xlsx XLSX spreadsheet
Appendix I Monitoring Wells.pdf PDF
RFQ 20R1000 Demo Facilities Phase VI.pdf PDF
Appendix C Phase 6 Notes Per Bldg.xlsx XLSX spreadsheet
PWS Demolition Phase 6 - 12 May 2020.pdf PDF
422.pdf PDF
Appendix B Abandoned Utilties.pdf PDF
Appendix A Phase 6 Map.pdf PDF
Appendix D(e) Photos.pdf PDF
Appendix H(i) - Building 509 Hazardous Materials Report.pdf PDF
Appendix H(a) - Asbestos Reports.pdf PDF
Appendix H(d) - Building 162 Hazardous Materials Report.pdf PDF
Appendix A Phase 6 Map.pdf PDF
Appendix B Abandoned Utilties.pdf PDF
Appendix C Phase 6 Notes Per Bldg.xlsx XLSX spreadsheet
Appendix H(m) - Building 1582 Hazardous Materials Report.pdf PDF
Appendix H(f) - Building 179 Hazardous Materials Report.pdf PDF
Appendix D(d) Photos.pdf PDF
Appendix D(a) Photos.pdf PDF
Appendix H(k) - Building 960 Hazardous Materials Report.pdf PDF
Appendix H(e) - Building 164 Hazardous Materials Report.pdf PDF
Appendix D(b) Photos.pdf PDF
Appendix H(c) - Building 108 Hazardous Materials Report.pdf PDF
Appendix H(b) - Building 107 Hazardous Materials Report.pdf PDF
Appendix H(j) - Building 526 Hazardous Materials Report.pdf PDF
Appendix H(l) - Building 1506 Hazardous Materials Report.pdf PDF
Appendix H(h) - Building 504 Hazardous Materials Report.pdf PDF
PWS Demolition Phase 6.pdf PDF
Appendix G MOA Between 325CES_GCEC.pdf PDF
Appendix D(c) Photos.pdf PDF
Wage Determination FL 20200105.pdf PDF
Appendix E Drawings.pdf PDF
Appendix D(f) Photos.pdf PDF
Appendix H(g) - Building 188 Hazardous Materials Report.pdf PDF
RFQ 20R1000 Demo Facilities Phase VI.pdf PDF
Appendix F Draft Surveys.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PPIF

Pre Proposal Inquiry FormSolicitation No: FA481920R1000
Contracting Officer Name: Melissa SandersDemolition of Facilities Phase 6, Tyndall AFB Florida
Contract Administrator Name: SrA James SearsQuote Due Date 15 June 2020

Email: 325CONS.Construction@us.af.mil

Question No.Reference (Sect/Para/Page)QuestionGovernment Response
1General InquiryItem 9, dewatering – we understand there is potential for shallow groundwater at the site. During excavations of the foundations, if contaminated water is encountered, how are we to price this in the demolition bid?The Government does not have the means to provide an exact determination of where shallow groundwater will be encountered, as such we request contractors bid as if no groundwater will be encountered. If it is, then we will adjust accordingly.
2General InquiryPFOA /PFOS waste is mentioned in item 11 ERP area, do any of the structures have history of usage of these contaminants?

The information related to areas where PFOS/PFAS may be a concern on Tyndall is available through at Site Inspection Report of Fire Fighting Foam Usage at Tyndall AFB; available at the AFCEC Administrative Record website (just google AFCEC AR)

3General InquiryGeneral requirements – qualified personnel. Only mentions qualified personnel - what is the expectation of the customer – Site Superintendent, SSHO and QCM? 3 separate on site personnel?At minimum two qualified personnel will be required. One superintendent, as well as a SSHO and QCM, which both roles can be filled by one individual.
4General InquiryIs there a requirement for FOD management and FOD prevention program and Flight Line Waiver? If so what is the lead time for review/approval of this document.A Government completed document will be provided to the contractor with guidelines they will need to abide by.
5General InquiryIs there an anticipation of Fence around the buildings to be demolished, if so what type of fence?Stormwater/silt will be required for all sites, and orange construction fence for sites adjacent to the flightline where there is risk of FOD.
6General InquiryDemolition of facilities includes foundations and infrastructure – please confirm that the entire foundation is to be removed and not limited to a certain depth. What is the expectation of removal of the Deep foundations on any of these structures?For each facility, intent is to remove the entire foundation. Reference attached appendices for dimensions, if on-site conditions differ from these appendices then differing site condtions will be evaluated accordingly
7General InquiryWhat type of grass is required for site restoration; and is sod required?Pensacola Bahia, sod not required but cannot hydroseed near airfield only drillseed (2.2.1.n in PWS)
8General InquiryWhat is the lead-time for dig permits?Usually 7-10 days, conservatively 14
9General InquiryWhat is the expectation of the customer to secure the building after abatement waiting for demolition?After abatement, but before demolition, contractors are expected to secure sites from pedestrians. However, note that per the Performance Work Statement (PWS) some facilities will require coordination with CES to allow certain members access around times of active work.
10General InquiryPlease confirm there are no historical artifacts or ecological subsurface requirements associated with the demolition work.All sites under this requirement were reviewed by SHPO for historical and cultural sensitivity, however due to the still uncertain nature, requirements for archaelogical monitoring are incorporated into the Performance Work Statement (PWS). Contractor's will follow all guidelines for monitoring as outlined in the PWS.
11General InquiryPlease provide direction for disposal of e-wasteIf e-waste is encountered, contractor should notify the Government and determination will be made on whether the contractor is to dispose of it or transport it to DRMO
12General InquiryUtility considerations item 8, since the water, electric, and natural gas infrastructure is privatized, is the demolition contractor requirement to hire the utility owner(s), if yes what are the lead times?Yes, contractors are required to pay a lump sum charge to the privatized utility companies to complete the work. The privatized utiliy companies are aware of these buildings needing to come down and the actual process of them cut, cap, and reitiring should not take longer than a few days per building once you've reached an agreement is reached.
13General InquiryAre there specific installation access requirements to be complied with for Tyndall AFB, which include security training, OPSEC requirements?Contractor badging takes up to two weeks after submission, and specific required information will be covered in the pre-construction meeting held after contract award.
14General InquiryWhat other project plans are requirement of this demolition contract? Asbestos abatement plan, environmental protection plan, site access /egress security plan, hazardous materials removal and disposal plan, Accident Prevention Plan, Contractor quality control plan, Storm water Pollution Prevention Plan.All specific submittals are called out in the PWS, OSHA safety plans, environmental permits, SWPPP for certain. If it's not listed ask specifically if it is needed
15General InquiryAre we to submit a project schedule with the bid?A project schedule is not necessary with bid, but be advised that a schedule will be required based off Appendix C, after award
16General InquiryPlease confirm that environmental area air monitoring to be conducted during abatement. Please note that this is in addition to OSHA personal monitoring.Per standard abatement processes, air sampling must be performed per FDEP guidelines to ensure all dust generated by the abatement process is cleaned up.
17General InquiryVarious buildings are identified in the contaminated sites designated by environmental program. Upon demolition of the structure, prior to removal of the slab, soils or groundwater are potentially contaminated, can some guidance be provided how the government would like these addressed?As stated in the PWS section 2.2.1k, work on the buildings in contaminated areas must abide by section 2.2.7
18General InquiryThe PWS requires Restoration backfill to firmness equal to that soil next to the trench, please confirm? What compaction density is expected for the backfill materials, and what lift size?Backfill should be equal in compaction to adjacent ground (PWS 2.2.1.n)
19General InquiryIs a finished grade survey required by a Florida licensed Surveyor?Yes, in accordance with UFGS (PWS 2.2.1.n)
20General InquiryIs the e waste in the buildings required to be delivered to Tyndall AFB DRMO?If e-waste is encountered, contractor should notify the Government and determination will be made on whether the contractor is to dispose of it or transport it to DRMO
21General InquirySection 2.2 states that “Facilities will be prioritized and scheduled based on dates provided by the Government, which are based on occupancy of facilities, equipment remaining in buildings, and future construction timelines.” For bidding purposes, how many mobilizations should contractors include in their pricing?Contractors will mobilize one time on-site, it is the Government's intent that facilities will be made available so re-mobilization will not be necessary.
22General InquirySection 2.2 and 2.2.2 state that “It is a contractor responsibility to verify accuracy of all maps and drawings;” and that “The Contractor shall be solely responsible for verification and validation of existing conditions.” Since there is no site walk scheduled, how are contractors to verify accuracy?Contractors should base bids off of attachments, after award but before work starts it is the contractor's responsibility to then verify and validate existing conditions.
23General InquirySection 2.2 – Third effort: How deep should contractors expect utility lines to be?Utility lines are not expected to be deeper than 3-4 ft
24General Inquiry• The PWS (page 2 of 16) states that pavement demolition and abandoned utility lines will be paid at a unit rate (LF and SF respectively). The bid items for CLIN 28 and 29 are per job with a quantity of 1 in lieu of unit price based. Can these items be changed to the unit price basis as stated in the PWS with a budgetary quantity? There is not enough detailed information in the documents for the contractors to bid these 2 items as lump sum.Yes, these items will be bid as SF for pavement, LF for utilities. See adjusted bid sheet, please list price for the requested SF/LF amount in lines 0029 and 0030, then list price per SF/LF in 0029a and 0030a.
25General InquiryThere are 2 pages with sewer markups. Page 3 (Surveyors page) shows fewer lines to be removed than the page from the Air Force. Page 3 also shows lines and manholes to be either replaced or rehabilitated. Which plan do we use to estimate the demo and remove work and do we need to bid the rehab/replace work?The two maps provided are intended to show the lines to the best of the Government's knowledge at this time. No rehab/replace work will be included under this requirement.
26General InquiryThe amendment added work on Bldg 422. Will there be a revised Bid Schedule to include that building?See revised schedule
27General InquiryWe have made efforts to contact the utility owners, but have so far had no luck in receiving a response. Can an allowance be provided for the utility owner’s portion, or can contacts be provided for each utility?The below POC's were given by the utility owners for the purposes of this requirement.

Colby Wiggings - cwiggins@gcec.com - (850) 265-3631 ext. 3017 C. Peyton Gleaton Jr. - pgleaton@gcec.com - (850) 913-3734

If any more issue is encountered reaching out to these individuals, please feel free to contact the Government via the POC's given under this solicitation.

28General InquiryThe Performance Work Statement requires an Archaeologist to be onsite during excavations. Please confirm this requirement.The Performance Work Statement is correct, a FL registered archaeologist must be present for ground disturbing activities.
29General InquiryIs a bid bond not required on this Combined Synopsis/Solicitation?No, a bid bond is not required
30General InquiryWe have gone through and done demolition and have quantities based on our interpretation of demolition "purple lines"

Please confirm all purple lines will be removed by demolition contractor.

Are the area designated as "replace lines" - "pink areas" also part of the work?Please confirm that remove and replacement of "pink lines" is not part of the scope of work. Is there a list of the lines to be demolished as the colors are not clear in case of laterals and manholes.Please confirm all laterals coming off of purple lines are also purple.

Specific colors in the drawings are not relevant, these were the drawings provided that best showed the infastructure to the best of CES knowledge. We have adjusted the bid schedule to provide for a maximum SF/LF to be demo'd, as well as asking for a unit price for both items. Based on timeframes to demo/construct around these areas, contractors will be instructed which lines to demo as the project progresses. If timeframes do not allow for the demolition of the total maximum square footages given in the line items, the Government shall base the amount to be removed from the contract based on the unit price given. The SF given for pavement removal will most likely still include the blue hatch shown in Appendix A Map, however more concrete information will be provided upon award for both the exact areas of pavement and utilities to be remove, and changes made accordingly.
31General InquiryAre the sewer line re-habilitation areas also a part of scope?

Please confirm the green lines and rehabilitation work are not part of scope. If they are part of scope please provide rehab specification.

No rehab/replacement work is required under this project. This is just a markup of abandoned infrastructure.
32General InquiryRecycling concrete is not specfically mentioned - would concrete structures be eligible for recycling?

Please confirm concrete may be recycled.

Concrete recycling is addressed in 2.2.1.e
33General Inquiry
34General Inquiry
35General Inquiry
36General Inquiry
37General Inquiry
38General Inquiry
39General Inquiry
40General Inquiry
41General Inquiry
42General Inquiry
43General Inquiry
44General Inquiry
45General Inquiry
46General Inquiry
47General Inquiry
48General Inquiry
49General Inquiry
50General Inquiry
51General Inquiry
52General Inquiry
53General Inquiry
54General Inquiry
55General Inquiry
56General Inquiry
57General Inquiry
58General Inquiry
59General Inquiry
60General Inquiry
61General Inquiry
62General Inquiry
63General Inquiry
64General Inquiry
65General Inquiry
66General Inquiry
67General Inquiry
68General Inquiry
69General Inquiry
70General Inquiry
71General Inquiry
72General Inquiry
73General Inquiry
74General Inquiry
75General Inquiry
76General Inquiry
77General Inquiry
78General Inquiry
79General Inquiry
80General Inquiry
81General Inquiry
82General Inquiry
83General Inquiry
84General Inquiry
85General Inquiry
86General Inquiry
87General Inquiry
88General Inquiry
89General Inquiry
90General Inquiry
91General Inquiry
92General Inquiry
93General Inquiry
94General Inquiry
95General Inquiry
96General Inquiry
97General Inquiry
98General Inquiry
99General Inquiry
100General Inquiry
101General Inquiry
102General Inquiry
103General Inquiry
104General Inquiry
105General Inquiry
106General Inquiry
107General Inquiry
108General Inquiry
109General Inquiry
110General Inquiry
111General Inquiry
112General Inquiry
113General Inquiry
114General Inquiry
115General Inquiry
116General Inquiry
117General Inquiry
118General Inquiry
119General Inquiry
120General Inquiry
121General Inquiry
122General Inquiry
123General Inquiry
124General Inquiry
125General Inquiry
126General Inquiry
127General Inquiry
128General Inquiry
129General Inquiry
130General Inquiry
131General Inquiry
132General Inquiry
133General Inquiry
134General Inquiry
135General Inquiry
136General Inquiry
137General Inquiry

File details come from the government source that posted it. Updated .