Attach 3.1 GD NM37 Building BTS 11-R-0001.doc

DOC document 33 KB Posted

Attached to
Base Telecommunications System Services Federal contract opportunity
Solicitation number
FA4801-11-R-0001
Issued by
Department of the Air Force Air Combat Command

About this file

Attach 3.1 - General Decision (GD) NM37 Mod 01 Bldg

View the file

Other files for this federal contract opportunity

Other files attached to Base Telecommunications System Services, newest first.
File Type Posted
FA4801-11-R-0001-0005.doc DOC document
Section B Amd 0004.doc DOC document
Q A Amd 0004.doc DOC document
Amendment 0004 Changes-Q A.doc DOC document
Add'l Questions PIRRM Changes 1Jun11.doc DOC document
Rev Atch 4 2 PIRRM 1Jun11 Amd 0003 —
SF33 BTS RFP Amd 0002.doc DOC document
Attach 3 SV HandoutQ As 20May11.doc DOC document
Attach 1 SV Attendance Sheet.pdf PDF
Atch 1 PWS Final-25Jan11-Updated25May11 Amd 0002.doc DOC document
FinalAnswersSiteVisit Questions25May11 Amd0002.doc DOC document
Attach 4 Itinerary SV BTS.doc DOC document
Attach 2 SV BTS Slides 20May11.ppt PPT presentation
Attach 5 HAFB Data Sheet.doc DOC document
Rev Atch 4.2 PIRRM 25May11 Amd 0002.xls XLS spreadsheet
BTS SV Mtg 20May11.doc DOC document
Attach 5- PP Questionnaire BTS.doc DOC document
Attach 4.2 PIRRM 25 Jan 11.xls XLS spreadsheet
BTS Solicitation FA4801-11-R-0001.doc DOC document
Attach 6 HAFB Statements.doc DOC document
Attach 3.2 GD NM13 Heavy BTS 11-R-0001.doc DOC document
Attach 1 PWS Final-25Jan11.doc DOC document
Attach 2 WD 2005-2511 Rev13 BTS 11-R-0001.doc DOC document
Attach 4.1Vendor Bid Summary Schedule BTS25Jan11.xls XLS spreadsheet
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4801-11-R-0001

General Decision Number: NM100037 12/24/2010 NM37

State: New Mexico

Construction Type: Building

County: Otero County in New Mexico.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date

0 12/10/2010

1 12/24/2010

CARP1245-004 04/01/2009

Rates Fringes

Carpenter

Metal Stud Installation

Only........................$ 22.94 7.52

* ELEC0583-009 12/01/2010

Rates Fringes

ELECTRICIAN

Excluding Low Voltage

Wiring for Alarms...........$ 27.80 4.25%+6.53

ENGI0953-012 11/01/2008

Rates Fringes

Power Equipment Operator

(2) Roller(Dirt and Grade

Compaction).................$ 21.06 5.70

(4) Bobcat/Skid Loader......$ 21.83 5.70

(8) Crane...................$ 24.85 5.70

IRON0495-009 12/01/2009

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 25.50 10.98

IRONWORKER, STRUCTURAL (METAL

BUILDING ERECTION ONLY)..........$ 25.50 10.98

PLUM0412-007 10/01/2010

Rates Fringes

PIPEFITTER (Including HVAC

Pipe Installation)...............$ 28.30 11.05

PLUMBER (Excluding HVAC Pipe

Installation)....................$ 28.30 11.05

SHEE0049-012 04/01/2010

Rates Fringes

Sheet Metal Worker (HVAC Duct and System Installation Only)....$ 27.78 14.56

SUNM2010-013 11/09/2010

Rates Fringes

BOILERMAKER......................$ 21.77 3.98

BRICKLAYER.......................$ 20.36 5.74

CARPENTER (Acoustical Ceiling

Installation Only)...............$ 20.79 0.00

CARPENTER (Drywall Finishing

Only)............................$ 20.18 4.54

CARPENTER (Drywall Hanging

Only)............................$ 21.39 2.85

CARPENTER (Form Work Only).......$ 20.46 5.61

CARPENTER, Excludes

Acoustical Ceiling

Installation, Batt

Insulation, Drywall

Finishing/Taping, Drywall

Hanging, Form Work and Metal

Stud Installation................$ 20.86 6.25

CEMENT MASON/CONCRETE FINISHER...$ 17.72 5.43

ELECTRICIAN (Low Voltage

Wiring for Alarms Only)..........$ 28.25 6.62

FLOOR LAYER: Carpet.............$ 22.31 0.30

GLAZIER..........................$ 20.15 3.95

INSULATOR - BATT.................$ 24.44 8.43

IRONWORKER, REINFORCING..........$ 19.75 8.45

IRONWORKER, STRUCTURAL

(Excluding Metal Building

Erection)........................$ 22.00 9.03

LABORER: Common or General......$ 13.61 3.89

LABORER: Landscape and

Irrigation.......................$ 10.60 0.24

LABORER: Mason Tender - Brick...$ 13.77 4.35

LABORER: Mason Tender -

Cement/Concrete..................$ 11.51 0.85

LABORER: Pipelayer..............$ 13.78 2.20

OPERATOR: Backhoe...............$ 20.95 4.73

OPERATOR: Forklift..............$ 21.13 4.83

OPERATOR: Grader/Blade..........$ 21.40 4.95

OPERATOR: Loader (Front End)....$ 21.55 4.97

PAINTER: Brush, Roller and

Spray (Excluding Drywall

Finishing/Taping)................$ 16.10 1.79

PLASTERER........................$ 12.00 0.00

ROOFER...........................$ 13.24 0.50

SHEETMETAL WORKER, Excluding

HVAC Duct and System

Installation.....................$ 22.01 9.65

TILE FINISHER....................$ 14.02 0.00

TILE SETTER......................$ 19.00 0.00

TRUCK DRIVER: Dump Truck........$ 15.25 3.89

TRUCK DRIVER: Pickup Truck......$ 15.91 3.13

TRUCK DRIVER: Water Truck.......$ 16.26 4.93

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and

3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of

Construction

Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party

(those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR

Part 7).

Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board

(formerly the

Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Attachment 3.1, GD NM37 Building

File details come from the government source that posted it. Updated .