Add'l Questions PIRRM Changes 1Jun11.doc

DOC document 148 KB Posted

Attached to
Base Telecommunications System Services Federal contract opportunity
Solicitation number
FA4801-11-R-0001
Issued by
Department of the Air Force Air Combat Command

About this file

Amend 0003 Additional Q A/Changes to PIRRM

View the file

Other files for this federal contract opportunity

Other files attached to Base Telecommunications System Services, newest first.
File Type Posted
FA4801-11-R-0001-0005.doc DOC document
Section B Amd 0004.doc DOC document
Q A Amd 0004.doc DOC document
Amendment 0004 Changes-Q A.doc DOC document
Rev Atch 4 2 PIRRM 1Jun11 Amd 0003 —
Atch 1 PWS Final-25Jan11-Updated25May11 Amd 0002.doc DOC document
FinalAnswersSiteVisit Questions25May11 Amd0002.doc DOC document
Attach 4 Itinerary SV BTS.doc DOC document
SF33 BTS RFP Amd 0002.doc DOC document
Attach 3 SV HandoutQ As 20May11.doc DOC document
Attach 1 SV Attendance Sheet.pdf PDF
Attach 2 SV BTS Slides 20May11.ppt PPT presentation
Attach 5 HAFB Data Sheet.doc DOC document
Rev Atch 4.2 PIRRM 25May11 Amd 0002.xls XLS spreadsheet
BTS SV Mtg 20May11.doc DOC document
Attach 3.1 GD NM37 Building BTS 11-R-0001.doc DOC document
Attach 5- PP Questionnaire BTS.doc DOC document
Attach 4.2 PIRRM 25 Jan 11.xls XLS spreadsheet
BTS Solicitation FA4801-11-R-0001.doc DOC document
Attach 6 HAFB Statements.doc DOC document
Attach 3.2 GD NM13 Heavy BTS 11-R-0001.doc DOC document
Attach 1 PWS Final-25Jan11.doc DOC document
Attach 2 WD 2005-2511 Rev13 BTS 11-R-0001.doc DOC document
Attach 4.1Vendor Bid Summary Schedule BTS25Jan11.xls XLS spreadsheet
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4801-11-R-0001-0003

ADDITIONAL WRITTEN QUESTIONS FROM 20 MAY 11 SITE VISIT

1. Q: How much of outside plant is direct buried and/or in conduit?

A. Seventy-five percent of outside plant is in conduit. The footage is unknown.

2. Q: Do manholes currently have locking lids installed?

A. Keys will be available for manholes that are locked. This is a security issue and should not be given out to the public.

3. Q: During exercises will contractor be required to wear MOPP gear and if so, will Government provide training and equipment?

A. No, contractor will not be required to wear MOPP gear during exercises.

ADDITIONAL EMAIL QUESTION OF IMPORTANCE

1. Q: CLIN/PID Number 7040 asks for a quantity of 50 each, of a "700A Singlemode Fiber Transceiver with Attenuators". This product will cost approximately $6,000 each, adding about $300,000 to our Pricing. Is this quantity correct?

A: Delete PID Number 7040 (700A Singlemode Fiber Transceiver with Attenuators) from the PIRRM.

2. Q: The following PIDs (highlighted) on the PIRRM appear to be duplicates, can you verify?

6252
Trenching through and restoration of Soft Surfaces, 18" wide, 40" deep [ 2x2 conduit layout]
1,000
FT
1,000
1,000
6253
Trenching through and restoration of Hard Surfaces, 18" wide, 30" deep [ 1x2 conduit layout]
1,000
FT
1,000
1,000
6254
Trenching through and restoration of Hard Surfaces, 18" wide, 40" deep [ 2x2 conduit layout]
1,000
FT
1,000
1,000
6256
Cutting through Concrete, 24" wide
1,000
FT
1,000
FT
6257
Cutting through and Resurfacing of Rock Bases
1,000
FT
1,000
FT
6263
Trenching through and restoration of Soft Surfaces, 18" wide, 30" deep [ 1x2 conduit layout,trench onlys]
1,000
FT
1,000
FT
6264
Trenching through and restoration of Soft Surfaces, 18" wide, 40" deep [ 2x2 conduit layout,trench only]
1,000
FT
1,000
FT
6265
Trenching through and restoration of Soft Surfaces, 18" wide, 40" deep [ 2x2 conduit layout, trench only]
1,000
FT
1,000
FT
6267
Trenching through and restoration of Hard Surfaces, 6" wide, 30" deep trench only]
1,000
FT
1,000
FT
6268
Trenching through and restoration of Hard Surfaces, 6" wide, 30" deep [trench only]
1,000
FT
1,000
FT
6274
Cutting through Concrete, 24" wide
1,000
FT
1,000
FT
6279
Cutting through and Resurfacing of Rock Bases
1,000
FT
1,000
FT
6402
Directional bore through or under Hard Su, Purchase Schedule 80 conduit under separate SLIN
50
FT
50
FT
6403
Directional bore through or under Hard Surface and Install 4 inch 1-way duct into the bore, Purchase Schedule 80 conduit under separate SLIN
50
FT
50
FT
7135
10ft ground rod, Ground rod clamp, Ground lug #6 wire w/ set screw,6-10 Screw type terminal ground bus bar, 6-10 Screw type terminal ground bus bar
50
EA
50
EA
7085
10ft ground rod, Ground rod clamp, Ground lug #6 wire w/ set screw,6-10 Screw type terminal ground bus bar, 6-10 Screw type terminal ground bus bar
50
EA
50
EA

A. Yes, there are duplicates. The PIRRM (1 Jun 11) has been updated to delete the duplicated PIDs.

Additional Questions for FA4801-11-R-0001 Holloman AFB BTS O&M

1. Q. Reference the PWS and associated Appendices and regarding the equipment maintained by the Contractor, does the contractor have responsibility for the maintenance and repair of any Air Conditioning equipment in telecommunication rooms or switch rooms?

A. No, the contractor is not responsible for maintenance and repair of air conditioning equipment in the telecommunications rooms or switch rooms.

2. Q. Regarding PWS Section 1.3.3.3, based on the contract requirements, is it fair to say that ALL manholes have undergone a PMI during the course of the current contract?

A. No, not all the manholes, hand holes or pullboxes have had PMIs during the course of the current contract.

3. Q. If so, would it be possible to review the maintenance records to assess scheduling priorities for continued PMI? – A. No, not at this time, upon award the contractor will have access to 4 years of data on PMIs. PMIs are based on paragraph of 1.3.3 of the PWS and the contractor can base his PMI schedule on that information.

4. Are there any BRAC Considerations, either losses or gains, projected for Holloman AFB?

A. There are no future plans for Base Realignment and Closure (BRAC) scheduled for Holloman AFB or any other base at this time. The last BRAC was in 2005. Losses and gains are impacted by the missions at Holloman AFB and this is always changing due to AF needs. With our vast airspace, no future closure is anticipated. There is a projected bed down of a new mission for F-16s at Holloman AFB in 2012 but the number of personnel affecting the base is unknown.

5. Q. In light of the recent and current flooding and other natural disasters, are there any unique requirements for continuity of operations? Is there a current disaster plan in place, and if so, would it be possible to review same? – A. Every base has some sort of disaster plan. Holloman AFB, has a local plan – HAFB 10-2, Comprehensive Emergency Management Plan which gives base response information on major accidents including aircraft accidents, environmental spills, fires and other natural disasters. This information is For Official Use Only and not readily available to the public. If the awardee has a “need to know”, the firm may possibly have access to this information.

6. Q. Is Dial-In Capability, in compliance with AFI 33-111 Section G, allowed for the DCO Switch or Remotes at Holloman AFB?

A. Yes, dial-in capability is allowed.

7. A. Regarding PWS Section 5.2.2, are there any spares available, that can be used by the contractor, for the CFE listed in 5.2.2?

A. Yes, however, the Government has limited spares

8. Q. Regarding PWS Section 5.2.2, are any of the 5.2.2 items under warranty or a maintenance agreement from another source?

A. Equipment in 5.2.2 are under warranty using the Voice Switching System (VSS) sustainment plan

9. Q. Regarding PWS Section 5.2.2, are any of the items listed in 5.2.2 out-of-production? – A. Some Key Systems, are in the process of being replaced.

10. Q. Regarding PWS Section 5.2.2, if a System or Component listed in 5.2.2 is no longer in production, and repair/replacement parts are no longer available, what is the Contractor's responsibility? – A. Contractor will identify the equipment and the Government will budget to get equipment replaced

11. Q. Regarding PWS Section 5.2.3, does the Base have a full set of Technical Manuals for the Avaya Equipment?

A. No, the Government does not maintain a full set of technical manuals. Technical manuals are on-line. It is suggested, contractor find all applicable documentation online.

12. Q. PWS Section 5.2.5.2 indicates that there are approximately 375 manholes, what is the quantity of hand holes?

A. There are approximately 128 hand holes.

13. Q. Regarding PWS Section 5.2.3, does the Government provide any test equipment or Cable Testers?

A. No, the Government does not provide equipment. It is the responsibility of the Contractor.

14. Q. Regarding PWS Section 5.2.3, does the Government provide a cable locator?

A. No, the Government does not provide equipment. It is the responsibility of the Contractor.

15. Q. Regarding PWS Section 5.2.3, does the Government provide Backhoes/Trenchers for OSP excavation?

A. No, the Government does not provide equipment. It is the responsibility of the Contractor.

16. Q. Regarding PWS Section 5.2.3, does the Government provide a Manhole Retrieval System?

A. No, the Government does not provide equipment. It is the responsibility of the Contractor.

17. Q. Regarding PWS Section 5.2.3, does the Government provide any computers/work stations? – A. Yes, as stated at the site visit, the Government provides a plotter and four computers for the Contractor’s Government furnished onsite location (Bldg 221). One computer is strictly for the required on-line training.

18. Q. Regarding PWS Section 5.2.3, does the Government provide a Splicing Trailer for cable splices and repairs?

A. No, the Government does not provide equipment. It is the responsibility of the Contractor.

19. Q. In light of questions yet to be answered, would the Government consider granting a two week extension of the Proposal Due Date?

A. Yes, the Government will extend the proposal receipt due date to 13 Jun 11.

20. Q. There will surely be questions that arise from the Site Visit on May 20th, would the Government consider extending the deadline for submitting questions until after the Pre-Proposal Conference? Yes, the Government has extended the receipt of proposal due date to 13 Jun 11.

21. Q. If we include a Compliance Traceability Matrix with our Proposal, will it be counted towards the total page count?

A. Yes, any information submitted by the Contractor including the matrix is included in the total page count.

CHANGES TO PIRRM PID ITEMS ON REVISED 1 JUN 11 PIRRM REVISION

1. The following PIRRM information on the PID Colum A (Est Purchase Qty) and Column B (Unit) highlighted have been deleted as there is no purchase item on these line items. The new revised PIRRM dated 1 Jun 11 will replace delete the purchase qty and unit.

5001
2-Wire Circuit
5
EA
5002
4-Wire Circuit
5
EA
5003
4-Wire Data Service Unit
5
EA
5004
4-Wire DX Signalling Unit
5
EA
5005
2-Wire Channel Unit Card
5
EA
5006
4-Wire Channel Unit Card
5
EA
5050
DEMARCATION POINT CROSS-CONNECTIONS : (these are always to be included)
5051
LAN
20
EA
5052
2-Wire Circuit
20
EA
5053
VOIP Programing to Send Stations to the Cisco Call Manager (qty 1 - 49)
10
EA
5054
VOIP Programing to Send Stations to the Cisco Call Manager (qty 50 - 99)
50
EA
5055
VOIP Programing to Send Stations to the Cisco Call Manager (qty 100 & above)
100
EA
5057
POINT TO POINT CROSS CONNECTIONS
10
EA
5059
4 Wire Circuit
10
EA
6051
Placement of Metallic Cable (up to 50 pair) into Existing Trench
1,000
FT
6052
Placement of Metallic Cable (100 pair) into Existing Trench
1,000
FT
6053
Placement of Metallic Cable (150 pair) into Existing Trench
1,000
FT
6054
Placement of Metallic Cable (200 pair) into Existing Trench
1,000
FT
6055
Placement of Metallic Cable (300 pair) into Existing Trench
4,000
FT
6056
Placement of Metallic Cable (600 pair) into Existing Trench
4,000
FT
6057
Placement of Metallic Cable (1200 pair) into Existing Trench
4,000
FT
6100
Metallic Cable in Existing Conduit:
6101
Pulling Metallic Cable (up to 50 pair) through Existing Conduit
1,000
FT
6102
Pulling Metallic Cable (100 pair) through Existing Conduit
1,000
FT
6103
Pulling Metallic Cable (200 pair) through Existing Conduit
1,000
FT
6104
Pulling Metallic Cable (300 pair) through Existing Conduit
4,000
FT
6105
Pulling Metallic Cable (600 pair) through Existing Conduit
4,000
FT
6106
Pulling Metallic Cable (1200 pair) through Existing Conduit
4,000
FT
6150
FIBER OPTIC CABLE INSTALLATION - Fiber Optic Cable in Existing Trench (Direct Buried)
6151
Placement of Fiber Optic Cable (6-72 Fiber) into Existing Trench
4,000
FT
6200
Fiber Optic Cable in Existing Duct/Innerduct:
6201
Pulling Fiber Optic Cable (6-72 Fiber) through Existing Duct/Innerduct
4,000
FT
6252
Trenching through and restoration of Soft Surfaces, 18" wide, 40" deep [ 2x2 conduit layout]
1,000
FT
6253
Trenching through and restoration of Hard Surfaces, 18" wide, 30" deep [ 1x2 conduit layout]
1,000
FT
6254
Trenching through and restoration of Hard Surfaces, 18" wide, 40" deep [ 2x2 conduit layout]
1,000
FT
6262
Trenching through and restoration of Soft Surfaces, 6" wide, 30" deep [trench only
1,000
FT
6266
Trenching through and restoration of Soft Surfaces, 30" wide, 40" deep [ 2x4 conduit layout, trench only]
1,000
FT
6267
Trenching through and restoration of Hard Surfaces, 6" wide, 30" deep trench only]
1,000
FT
6269
Trenching through and restoration of Hard Surfaces, 18" wide, 30" deep [ 1x2 conduit layout trench only]
1,000
FT
6270
Trenching through and restoration of Hard Surfaces, 18" wide, 30" deep [ trench only]
1,000
FT
6271
Trenching through and restoration of Hard Surfaces, 18" wide, 40" deep [ 2x2 conduit layout, trench only]
1,000
FT
6262
Trenching through and restoration of Soft Surfaces, 6" wide, 30" deep [trench only
1,000
FT
6266
Trenching through and restoration of Soft Surfaces, 30" wide, 40" deep [ 2x4 conduit layout, trench only]
1,000
FT
6267
Trenching through and restoration of Hard Surfaces, 6" wide, 30" deep trench only]
1,000
FT
6269
Trenching through and restoration of Hard Surfaces, 18" wide, 30" deep [ 1x2 conduit layout trench only]
1,000
FT
6270
Trenching through and restoration of Hard Surfaces, 18" wide, 30" deep [ trench only]
1,000
FT
6271
Trenching through and restoration of Hard Surfaces, 18" wide, 40" deep [ 2x2 conduit layout, trench only]
1,000
FT
6272
Trenching through and restoration of Hard Surfaces, 18" wide, 40" deep [Trech only]
1,000
FT
6273
Trenching through and restoration of Hard Surfaces, 18" wide, 40" deep [ 2x2 conduit layout, trench only]
1,000
FT
6274
Cutting through Concrete, 24" wide
1,000
FT
6275
Cutting through Asphalt, 6" wide
1,000
FT
6276
Cutting through Asphalt, 30" wide
1,000
FT
6277
Cutting through Concrete, 6" wide
1,000
FT
6278
Cutting through Concrete, 30" wide
1,000
FT
6401
Bore through or under Hard Surface and Install 4 inch 2-Way Ducts into the Bore, Purchase Schedule 80 conduit under separate PID
1,000
FT
6403
Directional bore through or under Hard Surface and Install 4 inch 1-way duct into the bore, Purchase Schedule 80 conduit under separate PID
50
FT
6404
Directional bore through or under Hard Surface and Install 2 inch 2-way ducts into the bore, ,Purchase Schedule 80 conduit under separate PID
50
FT
6414
Directional bore through or under Hard Surface and Install 4 inch 4-Way Ducts into the Bore, Purchase Schedule 80 conduit under separate PID
50
FT
6406
Core Drill 2" Hole Through 6" - 8" Wall (Concrete)
50
EA

2. The following blue highlighted changes in the Column F (Unit) have been made to the PIRRM (1 Jun 11).

6407
Core Drill 2" Hole Through 6" - 8" Wall (Dry Wall)
50
EA
6408
Core Drill 5" Hole Through 6" - 8" Wall (Concrete)
50
EA
6409
Core Drill 5" Hole Through 6" - 8" Wall (Dry Wall)
50
EA
6410
Core Drill 2" Hole Through 6" - 8" Floor (Hard Surface)
50
EA
6411
Core Drill 5" Hole Through 6" - 8" Floor (Hard Surface)
50
EA
6412
Firestop 1" Diameter
50
EA
6413
Firestop 2" Diameter
50
EA
6414
Firestop 3" Diameter
50
EA
8002
SITE SURVEYS for installation of CPE or inside cabling (PWS 1.4.1.4.1)
650
EA
8003
Global Positioning Updates (Appendix 5.7)
12
HR
8004
Manhole PMIs (PWS 1.4.4a)
12
EA
8005
Terminal PMIs (PWS 1.4.4b)
12
EA
8100
GPS Data Collection Service
8101
Direct Buried Cable
15000
LF
8102
Underground Cable
15000
LF
8103
Manhole, Handhole, Pedestal, or Splice (EA = price per data point collected)
36
EA
8150
CYBERSPACE VISUALIZATION COMPONENT(CVC)
8151
Convert Legacy CSIR Cable Diagram Drawing or 3rd Party As-Built Drawing data to CVC (EA = price per drawing converted)
5
EA
8152
Convert Legacy CSIR Manhole Racking Diagram Drawing or 3rd Party Manhole Racking Diagram As-Built Drawing MH data of Simple Complexity to CVC. (EA = price per each MH converted)
5
EA
8153
Convert Legacy CSIR Manhole Racking Diagram Drawing MH or 3rd Party Manhole Racking Diagram As-Built Drawing data of Medium Complexity to CVC. (EA = price per each MH converted)
5
EA
8154
Convert Legacy CSIR Manhole Racking Diagram Drawing MH or 3rd Party Manhole Racking Diagram As-Built Drawing data of Major Complexity to CVC. (EA = price per each MH converted)
5
EA
8155
Convert Legacy CSIR Cable Vault Drawing data to CVC (EA = price per each Cable Vault converted)
5
EA
8156
Convert CITS CFLD EXCEL Spreadsheet data for a comm path segment to CVC (FT = price per each linear foot converted.)
100
EA

Page | 8

File details come from the government source that posted it. Updated .