Attach 2 SV BTS Slides 20May11.ppt

PPT presentation 187 KB Posted

Attached to
Base Telecommunications System Services Federal contract opportunity
Solicitation number
FA4801-11-R-0001
Issued by
Department of the Air Force Air Combat Command

About this file

SF33 Attachment 2 to BTS SV Minutes dtd 20 May 11

View the file

Other files for this federal contract opportunity

Other files attached to Base Telecommunications System Services, newest first.
File Type Posted
FA4801-11-R-0001-0005.doc DOC document
Section B Amd 0004.doc DOC document
Q A Amd 0004.doc DOC document
Amendment 0004 Changes-Q A.doc DOC document
Add'l Questions PIRRM Changes 1Jun11.doc DOC document
Rev Atch 4 2 PIRRM 1Jun11 Amd 0003 —
SF33 BTS RFP Amd 0002.doc DOC document
Attach 3 SV HandoutQ As 20May11.doc DOC document
Atch 1 PWS Final-25Jan11-Updated25May11 Amd 0002.doc DOC document
FinalAnswersSiteVisit Questions25May11 Amd0002.doc DOC document
Attach 4 Itinerary SV BTS.doc DOC document
Attach 1 SV Attendance Sheet.pdf PDF
Attach 5 HAFB Data Sheet.doc DOC document
Rev Atch 4.2 PIRRM 25May11 Amd 0002.xls XLS spreadsheet
BTS SV Mtg 20May11.doc DOC document
Attach 5- PP Questionnaire BTS.doc DOC document
Attach 4.2 PIRRM 25 Jan 11.xls XLS spreadsheet
BTS Solicitation FA4801-11-R-0001.doc DOC document
Attach 6 HAFB Statements.doc DOC document
Attach 3.1 GD NM37 Building BTS 11-R-0001.doc DOC document
Attach 3.2 GD NM13 Heavy BTS 11-R-0001.doc DOC document
Attach 1 PWS Final-25Jan11.doc DOC document
Attach 2 WD 2005-2511 Rev13 BTS 11-R-0001.doc DOC document
Attach 4.1Vendor Bid Summary Schedule BTS25Jan11.xls XLS spreadsheet
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE VISIT

for

BASE TELECOMMUNICATIONS SYSTEM (BTS) SERVICES

20 May 11

Presented by Elizabeth A. Barnes Contract Administrator, 49th Contracting Squadron

49 CONS/LGCA Ms Sally Roberts 49 CONS/LGCA Ms Ann Barnes

49 CS/SCXPP Mr Antonio Juarez 49 CS/SCXPP Mr Mark Rectenbaugh

Government Team

Opening Remarks
Acquisition Information
Acquisition Responses
Questions & Answers/ Closing Remarks

Agenda

This is our agenda for the afternoon.

Acquisition Information

Statement of Need

BTS is a service for O&M of the base telephone switching systems & ancillary equipment, premise equipment and the inside & outside plant

Includes: Update of BTS databases, data administration; activation/deactivation; fault detection/location/notification/repair/verification;

cross-connects; inventory & tracking of supplies & spares; PMIs; record keeping; maintenance of phone sets, switches, station wiring , batteries & comm power equipment & contract support svcs

Statement of Need Con’t

BTS is a hybrid contract

- Monthly O&M Services
- IDIQ portion (prepriced/nonprepriced work orders including some construction)

Mission essential contract

Price

Total “estimated” contract value – $35M for

Base Year and four options

Includes unit pricing on the PIRRM w/prepriced items consisting of :
Purchase
Installation
Relocation
Removal
Miscellaneous

Contract Minimum/Maximum

IDIQ Kt based on $35M Contract Ceiling

- Contract Ceiling is total estimate for the life of the contract

IDIQ Kt - establish min/max for the contract

- Low is the minimum guaranteed amount
- Minimum amount at award of basic kt (phase in)
- High is the maximum amount (no guarantee)

Task Orders

IDIQ Kt based on Ordering Clause (FAR 52.216-18) &

Order Limitations (FAR 52.216-19)

a. Minimum Work Order Amt $25.00
b. Maximum Work Order Amt $750,000.00
- Any work order for 1 item in excess $750K amt
- Any order for a combination of items in excess $2M
-- Any series of orders in 30 days exceeding limitation these two paragraphs (a & b)

Pricing Schedule Section B, CLINs

- Monthly BTS Maint (Base/Hosp) (FFP)
- Prepriced WOs (Base/Hosp)
- Nonprepriced WOs (Base/Hosp)
- Phase in Plan (2 weeks)
- 2-Wk Transition 1st Month (Base/Hosp)
Attachment 2, PIRRM

Capability or Performance

Provide on-site service & technical support staff & key management personnel; 5 dys/wk, 0730-1630 On call emergency response 7-days, 24 hrs Avaya qualified/certified technicians for switch Perform cable location/marking; attend design review mtgs; provide budget estimates; global positioning system service; manhole/handhole /bldg termination inspection

Capability or Performance Con’t

Recordkeeping; traffic measurement & analysis

Provide reports; inventory of GFP

Performs disk/cartridge/tape backups; directory assistance; voice protection system

Ability to develop and maintain a quality control program that ensures a quality BTS service

Contracting History

Current Kt FA4801-08-D-0001, was awarded 20 Feb 08 to Newcom

Competitive 8a, Firm Fixed Price (FFP) contract with a Base Year and 4 one-year options; Contract Ceiling of $10M

Exercised 3d Option 1 Oct 10-30 Sep 11; $2M Mod increased for FY11

4th Option will not be exercised

Funding

IDIQ Kt has no funding on the basic Kt

Funding on Individual Task Orders by FY

Incremental Funding appears to be the present/future in acquisition (DFARS 252.232-7007)

O&M portion is fixed amount ea mo (12 mo programmed)

Work order (IDIQ) portion estimated amount

(funds are increased or deobligated as needed)

Performance Period

Phase in – 1-15 Oct 11
Base Plus 4 - 1 Oct 11 through 30 Sep 16
Each task order/work order has a separate POP

Performance-Based Svcs

Acquisition is a PBSA (AFFARS 5337.503)
Appointment of QAPs, surveillance schedules and inspection results required

- 49 CS QAP survey contractor performance, provide monthly schedule & assessment report, and provide input for annual CPARS

Acquisition Responses

Instructions to Offerors Section L of the Solicitation

- Technical Section
- Price Section
- Present/Past Performance Section

Evaluation Factors Section M of the Solicitation

- Technical
- Price
- Present/Past Performance

Government Furnished Property

Government Furnished Property:

- Office space is on base

- Lay down area
- Equipment, as listed in Appendix 5.2, is furnished by the Government
Contractor provides replacement parts/repair to defective items

Contractor provides all other equipment, tools, etc

Security

Pass & ID requirements for contractor personnel

Contractor escort required in all secure areas (controlled/restricted areas)

FPCON & Security measures are briefed at the pre-performance conference

LAN Service provided/CAC required

Closing Remarks Questions?

File details come from the government source that posted it. Updated .