APRIL 2026 PMA COMPLETION FORM.pdf

PDF 98 KB Posted

Attached to
Airfield Lighting Computer System
Solicitation number
FA480027Q00001
Issued by

About this file

This document is an AGL ALCMS/CCR-PMA (Advanced Preventive Maintenance) Basic Completion Form dated April 24, 2026, documenting maintenance and inspection services performed at Langley Airforce Base (LFI) in Hampton, Virginia. The maintenance was completed by ADB SAFEGATE and acknowledged by customer representative Joe Gandarillas under the supervision of Electrical Maintenance Foreman David Spangler. The facility contains one vault and one Air Traffic Control (ATC) system.

The completion form verifies that ADB SAFEGATE performed a comprehensive preventive maintenance program meeting contractual requirements, including inspection and cleaning of all computer enclosures and cooling systems; verification of network device connectivity and ethernet cable seeding; database evaluation and backup restoration testing; touchscreen calibration and operational testing; UPS five-minute power testing; L-829 operational testing for remote and local control functionality; CCR recording of output current, voltage, VA, and IRMS data; ACE/DCMU diagnostics and fiber connection verification; insulation resistance module calibration verification; and on-site repair assistance where spare parts were available. Printer operational testing was marked not applicable, and spare parts inventory recommendations were not submitted. Both the ADB SAFEGATE representative (Immer Adame) and customer representative (Joe Gandarillas) signed the completion form on April 24, 2026, acknowledging successful completion subject to weather, airport operations, escort, and access privileges. ADB SAFEGATE committed to submitting a detailed technical trip report within fifteen business days of the service date.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AGL ALCMS/CCR-PMA Basic Date 24/04/26 Page 1 / 2

1. Customer Information

Contact Name David Spangler

Contact Title Electrical Maintenance Foreman

Contact Phone # +1 757 846 6494

Contact E-Mail david.spangler@us.af.mil

2. Airport Information

IATA Code LFI (Langley Airforce Base)

Location (State) Hampton, VA 23665

# of Vaults 1

# of ATC 1

3. ALCMS/CCR - Advanced Preventive Maintenance

Inspection of All Computer Enclosures

Cleaning of all cooling fans, filters, and dust/debris removal Done

Notes

Network devices inspection

Verify proper seeding of all ethernet and communication cables Done

Notes

Database Evaluation and/or Repair

Check database for proper storage capacities and backup restores Done

Notes

Touchscreen Operational test and inspection

Touchscreen Calibration and Responsiviness test Done

Notes

UPS testing and inspeciton

Five minute power test, remove from utility power to verify proper alarms Done

Notes

Printer Operational test and inspection

Create a test print, verify functionality NA

Notes

Complete L-829 Operational testing

Testing of remote and local control and proper feedbacks Done

Notes

CCR Recording of Output Current, Voltage, VA, & IRMS

Data is captured and recorded by ADB SAFEGATE Done

ADB_Safegate - - - -

AGL ALCMS/CCR-PMA Basic Date 24/04/26 Page 2 / 2

Notes

ACE/DCMU Diagnostics & Testing

Verify ACE communication, functioning overlays and fiber connections Done

Notes

Insulation Resistance (IRMS) Diagnostics & Testing

Verify accuracy and calibration of the IRMS module or megger card Done

Notes

On-site Repair (if spare parts are available)

Assist the maintenance personnel in pending repairs when possible Done

Notes

Spare Parts/Inventory Reccomendations

Submit parts quote request or orders if needed NA

Notes

*Customer Representative acknowledges above PMA Completion Form carried out to, no less, than its contractual agreement by ADB SAFEGATE Representative. ADB SAFEGATE Represntative acknowledges that a detailed technical trip report will be submitted within fifteen business days of date listed below.

Both, ADB SAFEGATE and Customer Representative, agree that a succesful PMA Completion Form is subject, but not limited to, inclimate weather, airport operations, escort, and/or access privileges.

ADB Safegate Representative

ADB Representative Signature

Immer Adame

ADB Sign Date 2026-04-24

Customer Representative

Customer Representative Signature

Joe Gandarillas

Customer Sign Date 2026-04-24

ADB_Safegate - - - -