APRIL 2026 PMA COMPLETION FORM.pdf
PDF 98 KB Posted
- Attached to
- Airfield Lighting Computer System
- Solicitation number
- FA480027Q00001
About this file
This document is an AGL ALCMS/CCR-PMA (Advanced Preventive Maintenance) Basic Completion Form dated April 24, 2026, documenting maintenance and inspection services performed at Langley Airforce Base (LFI) in Hampton, Virginia. The maintenance was completed by ADB SAFEGATE and acknowledged by customer representative Joe Gandarillas under the supervision of Electrical Maintenance Foreman David Spangler. The facility contains one vault and one Air Traffic Control (ATC) system.
The completion form verifies that ADB SAFEGATE performed a comprehensive preventive maintenance program meeting contractual requirements, including inspection and cleaning of all computer enclosures and cooling systems; verification of network device connectivity and ethernet cable seeding; database evaluation and backup restoration testing; touchscreen calibration and operational testing; UPS five-minute power testing; L-829 operational testing for remote and local control functionality; CCR recording of output current, voltage, VA, and IRMS data; ACE/DCMU diagnostics and fiber connection verification; insulation resistance module calibration verification; and on-site repair assistance where spare parts were available. Printer operational testing was marked not applicable, and spare parts inventory recommendations were not submitted. Both the ADB SAFEGATE representative (Immer Adame) and customer representative (Joe Gandarillas) signed the completion form on April 24, 2026, acknowledging successful completion subject to weather, airport operations, escort, and access privileges. ADB SAFEGATE committed to submitting a detailed technical trip report within fifteen business days of the service date.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AGL ALCMS/CCR-PMA Basic Date 24/04/26 Page 1 / 2
1. Customer Information
Contact Name David Spangler
Contact Title Electrical Maintenance Foreman
Contact Phone # +1 757 846 6494
Contact E-Mail david.spangler@us.af.mil
2. Airport Information
IATA Code LFI (Langley Airforce Base)
Location (State) Hampton, VA 23665
# of Vaults 1
# of ATC 1
3. ALCMS/CCR - Advanced Preventive Maintenance
Inspection of All Computer Enclosures
Cleaning of all cooling fans, filters, and dust/debris removal Done
Notes
Network devices inspection
Verify proper seeding of all ethernet and communication cables Done
Notes
Database Evaluation and/or Repair
Check database for proper storage capacities and backup restores Done
Notes
Touchscreen Operational test and inspection
Touchscreen Calibration and Responsiviness test Done
Notes
UPS testing and inspeciton
Five minute power test, remove from utility power to verify proper alarms Done
Notes
Printer Operational test and inspection
Create a test print, verify functionality NA
Notes
Complete L-829 Operational testing
Testing of remote and local control and proper feedbacks Done
Notes
CCR Recording of Output Current, Voltage, VA, & IRMS
Data is captured and recorded by ADB SAFEGATE Done
ADB_Safegate - - - -
AGL ALCMS/CCR-PMA Basic Date 24/04/26 Page 2 / 2
Notes
ACE/DCMU Diagnostics & Testing
Verify ACE communication, functioning overlays and fiber connections Done
Notes
Insulation Resistance (IRMS) Diagnostics & Testing
Verify accuracy and calibration of the IRMS module or megger card Done
Notes
On-site Repair (if spare parts are available)
Assist the maintenance personnel in pending repairs when possible Done
Notes
Spare Parts/Inventory Reccomendations
Submit parts quote request or orders if needed NA
Notes
*Customer Representative acknowledges above PMA Completion Form carried out to, no less, than its contractual agreement by ADB SAFEGATE Representative. ADB SAFEGATE Represntative acknowledges that a detailed technical trip report will be submitted within fifteen business days of date listed below.
Both, ADB SAFEGATE and Customer Representative, agree that a succesful PMA Completion Form is subject, but not limited to, inclimate weather, airport operations, escort, and/or access privileges.
ADB Safegate Representative
ADB Representative Signature
Immer Adame
ADB Sign Date 2026-04-24
Customer Representative
Customer Representative Signature
Joe Gandarillas
Customer Sign Date 2026-04-24
ADB_Safegate - - - -
File details come from the government source that posted it. Updated .