Attachment 17 RFP Design Build Project to include Statement of Work Basis of Design Specification Sections 01 11 00 General Section 01 12 00 Asset Management Section 010600 Regulation Requirement and General Wage Decision Determination.
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) at Langley AFB/Ft Eustis AB, VA has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. FA4800-11-R-0002 Attachment 17
REQUEST FOR PROPOSAL (RFP)
Langley/Eustis Multiple Award Construction Contract (MACC)
ISSUED BY: 633d Contracting Squadron/LGCB 30 June 2011 74 Nealy Avenue Joint Base Langley Eustis, VA 23665
POINT OF CONTACT: Delores Powell (757)764-2544
PROJECT NUMBER: MUHJ 06-4088
PROJECT TITLE: : REPAIR WATER DISTRIBUTION SYSTEM AT LANGLEY AFB, VA
STATEMENT OF WORK: Furnish all design, plant, labor, equipment, materials, tools and other items required to complete this project in accordance with the Statement of Work (SOW), and Basis of Design. The SOW describes the design requirements and the type of construction work required. This is a Design/Build project.
SITE VISIT/PRE-PROPOSAL MEETING: The site visit is scheduled for 13 July 2011 at 10:00 AM, at the 633 CONS large conference room.
SUBMISSION OF PROPOSALS: Proposals are due to the Contracting Office on 02 August 2011 at 2:00pm.
PERFORMANCE PERIOD: The Government is proposing the following timetable for construction requirement:
Design: 30 calendar days to design 90% following issuance of the Notice to Proceed; 7 calendar days to complete 100%
Construction: 365 calendar days following issuance of the Notice to Proceed.
MAGNITUDE OF CONSTRUCTION PROJECT: Estimated to be between $250,000 and $500,000.
PROPOSAL ACCEPTANCE PERIOD: 240 days for Government acceptance after the date offers are due.
PROPOSAL PREPARATION INSTRUCTIONS: Reference Section H, paragraph 3.2.1.
BASIS OF AWARD: In accordance with Section H, paragraph 3.1 –Low Price technically acceptable .
FUNDING: Contracting authority funding has been provided for this project.
PROJECT NUMBER: MUHJ 06-4088
PROJECT TITLE: REPAIR WATER DISTRIBUTION SYSTEM, JOINT BASE LANGLEY EUSTIS, VA
OFFEROR PLEASE
COMPLETE THE FOLLOWING:
COMPANY NAME: ___________________________________ DATE: ________________
OFFEROR'S SIGNATURE: ________________________________________________
TITLE OF PERSON AUTHORIZED TO SIGN: ________________________________
TERMS AND CONDITIONS SPECIFIC TO THIS PROJECT:
NOTICE TO PROCEED: Other than submittal of payment and performance bonds, the Contractor shall not proceed with performance of this project until the Contractor receives a Notice to Proceed from the Contracting Officer.
PERFORMANCE AND PAYMENT BONDS: Payment and Performance Bonds will be required for this project. Bonds are due no later than 10 calendar days after award.
WAGE RATES – The attached Davis Bacon wage decision applicable to this procurement is General Decision Number VA100150, Mod 1, dated 12/03/2010—Heavy
LIQUIDATED DAMAGES: In accordance with FAR Clause 52.211-12 the liquidated rate for this project is established at $463.36.
INVOICES: Invoices may be submitted for progress payments based on a percentage of work completed. Invoices will be submitted electronically using Wide Area Flow (WAWF) procedures.
COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK:
The Contractor shall be required to commence work under this contract within 10 calendar days after the date the Contractor receives the Construction Notice to Proceed, prosecute the work diligently, and complete the entire work ready for use within the stated days after issuance of the Notice to Proceed.
ATTACHMENTS:
Statement of Work Basis of Design - Introduction Specification:
· Section 01 11 00 General
· Section 01 12 00 Asset Management
· Section 01 06 00 Regulotor Requirements Drawings – 11 pdf
– 8 AutoCAD General Decision Wage Determination, VA100210, Mod 3, dated 02/11/2011
BID SCHEDULE
MUHJ 06-4088, REPAIR WATER DISTRIBUTION SYSTEM
JOINT BASE LANGLEY EUSTIS, VIRGINIA
ITEM NO. DESCRIPTION LUMP SUM
0001 Repair By replacement the water service connections and tie-ins to twenty-five (25) facilities in the Shellbank area of Langley Air Force Base as indicated on the drawings. $___________
0002 Demo Shellbank Hydrants on the old water distribution system as indicated on the drawings.
Aggregate of Bid Line Items 0001 and 0002. $___________
STATEMENT OF WORK FOR
MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)
PROJECT MUHJ 06-4088
REPAIR WATER DISTRIBUTION SYSTEM
AT
JOINT BASE LANGLEY EUSTIS, VIRGINIA
| 1. | GENERAL REQUIREMENTS: The following statement of work for the MACC contract is keyed to the General Provisions contained in Attachment 3 to the basic contract and serves to clarify intent within the annotated paragraphs. The requirements identified within the General Provisions shall remain in full affect unless otherwise specifically noted. | ||
| 1.1 | DESCRIPTION OF WORK: The work under this project consists of repair by replacement of water service connections and tie-ins on Langley Air Force Base, Hampton, VA. | ||
| 1.1 | Install water service connections at the following locations: | ||
| FACILITY | DOMESTIC | FIRE | |
| 325 | One 2-inch | One 6-inch | |
| 326 | One 2-inch | ||
| 328 | Three ?-inch | One 6-inch | |
| 329 | One 2-inch | ||
| 330 | Two ?-inch | Two ?-inch | |
| 331 | One 2-inch | ||
| 333 | One 2-inch | One ?-inch | |
| 337 | One ?-inch | Military gas station. | |
| 338 | One 4-inch | Two ?-inch | |
| 339 | Two ?-inch | One ?-inch | |
| 340 | One 2-inch | ||
| 342 | One ?-inch | One ?-inch | |
| 351 | Two ?-inch | ||
| 355 | One 4-inch | One ?-inch | |
| 362 | One ?-inch | ||
| 366 | One ?-inch | ||
| 367 | One ?-inch | One ?-inch | |
| 368 | One ?-inch | ||
| 369 | One ?-inch | ||
| 371 | One ?-inch | One ?-inch | |
| 372 | One ?-inch | One ?-inch | |
| 373 | One ?-inch | One ?-inch | |
| 374 | One ?-inch | One ?-inch | |
| 378 | One ?-inch | One ?-inch | |
| 381 | One 2-inch | One ?-inch |
Demo Shellbank Hydrants on Old System Contractor shall field verify the locations of all required water service connections and tie-ins.
1.2.1. DESIGN / BUILD: A 35% design accompanies this statement of work; it has been prepared as the basis for the work to be accomplished under this design-build contract.
2. PROGRAM MANAGEMENT: The contractor shall sequence his work to ensure progress efficient for occupancy and use.
2.1 COMMENCEMENT, PROSECUTION AND COMPLETION OF DESIGN: The Contractor is required to complete the following design requirements:
2.2 PERFORMANCE SCHEDULE:
90% Design
1. Full technical specifications.
2. Full design analysis
3. 100% complete equipment and material schedule with manufacturer’s make and model number.
100% Final Design
1. Full technical specifications.
2. Full design analysis
3. 100% complete equipment and material schedule with manufacturer’s make and model number.
4. Submittal registry on AF Form 66 Prior to NTP for Construction The Contractor shall:
1. Incorporate 90% government comments and notes
2. Ensure drawings are signed and sealed (professional engineer/architect).
| % DESIGN | TIME, CALENDAR DAYS | |
| 90 | 30 | |
| 100 | 7 |
Total design performance time is 37 calendar days for design, not including Government review time. Government review time will be approximately 10 calendar days per submittal. (Please note the use of calendar days not workdays.) Construction of the project shall be 208 calendar days.
The quantity of documents required at the various submissions is as follows:
| 90% | 100% | ||
| Orig Dwgs (Mylar Set) | - | 1 | |
| Dwg Prints | 4 | 4 | |
| List of Guide Specs | N/A | N/A | |
| Marked-Up Guide Specs | N/A | - | |
| Typed Specs | 4 | Original and 4 copies | |
| Design Analysis | 4 | Original | |
| Cost Estimate | 4 | Original | |
| 2.2 | SUBCONTRACTORS: |
No variance.
2.3 QUALITY CONTROL PLAN:
No variance.
3. RESPONSE REQUIREMENT
No variance.
4. DESIGN DOCUMENTS, GENERAL:
See Special Conditions Section 01 11 00, section 1.5.
4.1 DRAWINGS, BID SCHEDULE AND COST ESTIMATE:
See Section 2.1 for variance.
4.2 DRAWING:
Mechanical, Electrical and Civil.
4.3 RENDERED PERSPECTIVE:
There is no requirement for architectural renderings within this scope of services.
4.4 SPECIFICATIONS:
No variance.
4.5 CONSTRUCTION COST ESTIMATE BREAKDOWN:
No variance.
4.6 PREPARATION OF AF FORM 66, Schedule of Material Submittals:
No variance.
4.7 BID SCHEDULE:
A sample bid schedule is furnished.
5. DESIGN ANALYSIS:
No variance.
6. CONTRACT DOCUMENTS SPECIAL REQUIREMENTS:
No variance.
7. APPLICABLE CODES AND REGULATIONS:
In addition to Special Conditions Section 01110, paragraph 1.6, refer to the below:
A. Unified Facilities Criteria UFC 3-535-01, Visual Air Navigation Facilities B. Air Force Instruction AFI 32-1044, Visual Air Navigation Systems C. Air Force Instruction AFI 31-101 ACC SUP 1, The Air Force Installation Security Program D. Air Force Joint Manual AFJMAN 32-1082, Facilities Engineering Electrical Exterior Facilities E. Air Force Handbook 32-1084 Facility Requirements F. National Fire Protection Association Codes (NFPA) – latest edition G. Unified Facilities Criteria UFC 3-600-01, Fire Protection Engineering for Facilities H. Langley AFB Electrical, Fire, and Communications Design Standards -- latest edition I. Air Force Engineering Technical Letter ETL 01-1, Reliability and Maintainability (R&M) Design Checklist
8. GOVERNMENT POINT OF CONTACTS
633 CES Project Manager – W. Daniel Porter (757) 764-1149.
633 CES Project Inspector – Joseph A. Sirois (757) 846-8479.
User – 633 CES Water Shop.
BASIS OF DESIGN
35% DESIGN SUBMITTAL
REPAIR WATER DISTRIBUTION SYSTEM - PHASE1
PROJECT MUHJ 06-4088
LANGLEY AFB, VA
April 23, 2010
1.0 INTRODUCTION
Several years ago, LAFB installed an 8” diameter PVC water main on a portion of the base among a number of existing buildings along the north side of Sweeney Blvd to improve water pressures and water system reliability. The new main was intended to replace an older existing 8” diameter cast iron water main, which will eventually be taken out of service. At the time that the new PVC water main was installed, the existing water service lines to the buildings in that area were not disconnected from the “old main” and connected to the “new main”. Over the past few years, as the need arose, some of these buildings have been reconnected to the PVC water main, but 23 buildings remain connected to the old main, and this project is intended to complete the water service tie ins to the new main, so that the cast iron main can be taken out of service. Some of the existing water service lines are galvanized and some are copper, of varying sizes.
The intent of this project is to replace all existing galvanized water service lines, and extend copper water service lines (for services 2” and less- and PVC Sch 80 piping for services lines greater than 2” up to 4”), from 23 buildings along the north side of Sweeney Blvd, between Elm Street and Nealy Avenue, including the disconnection of the existing water service lines from the existing cast iron water main and connection of the new or extended water service lines to the PVC water main. Also, the work includes the installation/tie in of up to 400 linear feet of new 8” diameter PVC water main , and the removal/replacement of six (6) fire hydrants, and the removal/capping of sixteen (16) fire hydrants, located throughout the project area, all as shown on the design drawings.
2.0 WATER SYSTEM DESIGN BASIS
Service Lines
Most of the existing water services to these buildings are copper lines, and in this case, the contractor shall disconnect the service from the cast iron main, cap the service at the old main, and connect by sleeving to the end of the existing copper line and extend the same diameter copper line up to the new main, and connect by wet tap to that main, along with installing a water cut off valve where the line connects to the PVC water main.
In some cases, the new PVC main is closer to the building than the older CI main, in which case the contactor shall cut the copper line adjacent to the new main, install a water valve and wet tap the new main. The contractor shall also cut/cap/abandon the segment of existing water service line between the new and old water mains.
BASIS OF DESIGN
35% DESIGN SUBMITTAL
REPAIR WATER DISTRIBUTION SYSTEM - PHASE1
PROJECT MUHJ 06-4088
LANGLEY AFB, VA
April 23, 2010
For those buildings having galvanized water service lines, the contractor shall cut the galvanized line approximately two feet outside the building and extend a new copper line to the PVC water main and connect by wet tap to that main. The contractor shall also disconnect/cap the galvanized service at the old main.
Most of the new services will be installed in grassy areas, which shall be restored with select material, a 4 “depth of topsoil, and hydroseeding. Some of the new service installations will require boring under roadways, driveways or parking lots. Where open cutting of the pavement is necessary, the trench shall be sawcut, and the pavement/curbing shall be restored to an equivalent thickness, using select material and similar pavement to match existing conditions.
In some cases as noted on the plans, the new water service line is to be extended into the mechanical room of the building by excavation through/under the foundation and up through the floor slab into the mechanical space, and to then be connected to the existing building service at a suitable location in the mechanical room. The repairs to the building slabs shall include vapor protection, welded wire fabric and an equivalent thickness of concrete, with appropriate finish work to match the existing floor slab.
Fire Lines
In some cases, as noted on the plans, there is a need to disconnect fire lines from the cast iron main and to extend and connect these lines to the PVC water main. This work shall include restoration of the grassy and paved areas, and curbs as required, in accordance with the service line installation restoration described above.
Main Lines
Up to 400’ of 8” PVC water main ( of which 115’ is shown as a bid option) shall be installed, most of which is near Building 333 , and connected to the ends of two existing PVC water mains, in order to improve system pressure and to eliminate two dead end lines. Restoration of all disturbed areas shall be in accordance with the service line restoration described above
BASIS OF DESIGN
35% DESIGN SUBMITTAL
REPAIR WATER DISTRIBUTION SYSTEM - PHASE1
PROJECT MUHJ 06-4088
LANGLEY AFB, VA
April 23, 2010
Fire Hydrants
In locations at noted on the plans, 6 fire hydrants are to be replaced with a Mueller “Super Centurion” Hydrant, or Kennedy “ Guardian” K81D or approved equal, including all appurtenances and thrust blocking.
Also, 16 fire hydrants shall be removed and the remaining line shall be capped at the existing gate valve, and the area backfilled and restored, per the plan detail. Some of the hydrants are located in grassy areas, and some are located in concrete or asphalt pavement areas. In the latter cases, the pavement thickness is unknown, but the contractor shall saw cut the existing pavement and shall match the existing pavement thickness, unless otherwise directed by LAFB inspection personnel.
All water service tie ins/ interruptions shall be closely coordinate with LAFB personnel so as to minimize disruption to the building occupants.
3.0 EXISTING UTILITIES
Existing utilities are depicted on the plans to the extent identified by Miss Utility and by LAFB staff. However, no representations are made as to the accuracy of this information. In addition, test hole information has been obtained at various locations within the project area to more accurately locate utilities and to determine water service line material/sizing, and this information is noted on the plans.
4.0 CONSTRUCTION OPTIONS
It is the owner’s intent to obtain the highest quality installation as possible at the lowest possible cost, within the amount of available funds for the project. As such, this solicitation includes construction options at several of the buildings as noted on the plans..
SECTION 01 11 00
SPECIAL CONDITIONS
REVISED 04 JANUARY 2011
Highlighted text indicates variables in standard notes and standard text. Do not use this text or highlight in guide specifications.
DESIGN ENGINEER IS TO INCORPORATE COMM ATTACHMENTS 1, 2, 4, 5, 6 AND 7 AS REQUIRED.
Brackets are used in the text to indicate designer choices or locations where text must be supplied by the designer.
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
SECTION 01 12 00 Environmental Special Conditions [Langley Air Force Base (AFB), Joint Base Langley-Eustis (JBLE)]
U.S. ARMY CORPS OF ENGINEERS (USACE) EM 385-1-1
(2003 or most current version) Safety and Health Requirements
LANGLEY AFB, JBLE TELECOMMUNICATIONS BUILDING CABLING SYSTEMS STANDARDS
(Langley AFB, JBLE Specification 27 10 10 dated 02 June 2008 or most current version)
1.2 SUBMITTALS
The following items specified herein shall be submitted in accordance with SUBMITTAL PROCEDURES:
SD-03 Product Data Material Safety Data Sheet (MSDS) for each item State and EPA Region 3 Notifications Recycling Report Trip Tickets Affirmative Procurement Report Exemption Form, Annex B to LAFB Affirmative Procurement Plan 32-7080 All Employee Names and Social Security Numbers Work Clearance Requests (Air Force Form 103) Quality Control (QC) Report SD-11 Closeout Submittals Survey Report Metadata Deliverables and Final As-builts Three copies of Computer-Aided Drafting and Design (CADD) digital final as-built drawings on CD’s One As-Built (Redline) Drawings Warranty of Construction Equipment Warranty Certificate Equipment Warranty/Guarantee Record Construction Data Worksheet and DD Form 1354 Acceptance and Transfer of Real Property Facilities NOTE TO SPECIFIER (Delete this note from the final specs): Provide text explaining submittal requirements for the item, if necessary. Indent first line of the explanatory text two spaces to provide clarity when document is printed without color and with tags off.
1.2.1 SUBMITTAL PROCEDURES
1.2.1.1 Schedule of Material Submittals (Air Force Form 66)
Information, shop drawings, certificates, test data, etc., listed on the attached AF Form 66, Schedule of Material Submittals, shall be submitted for approval by the Contracting Officer, or his/her designated representative in accordance with the General Provisions. Whenever in this contract materials or drawings are required to be submitted by the Contractor to the Contracting Officer for approval and the material or drawings submitted are at variance with the specifications or Government drawings, but are, nevertheless, approved by the Contracting Officer, inadvertently and without consciousness of the variance, and regardless that a closer review could have revealed the variance, then such approval shall not be final unless the Contractor expressly noted in a memorandum to the Contracting Officer, on the material submittal or drawing that “this material or drawing varies from specifications in the following aspects –” or uses other works of similar clear meaning. In the event of such an inadvertent, erroneous approval, the Contracting Officer, upon discovering the variance at any stage, have the right to require the Contractor to do such rework and/or material replacement as is necessary to obtain compliance with the specifications, and the expense of such rework and material replacement shall be borne solely by the Contractor.
a. Submittals for technical compliance of finishes may be made individually for each material. SUBMITTALS FOR PATTERN, COLOR, TEXTURE, ETC., SHALL BE MADE SIMULTANEOUSLY FOR EACH ROOM OR AREA. Finishes shall be scheduled for each room/area to include surface, type material, manufacturer, brand name or product number, and space for the Government selection of pattern/color.
EXAMPLE:
Room 100
| Floor: | vinyl | Tarkett | Reliant | (62107 Adobe) |
| Floor: | carpet | Milliken | Magistrate | (21 Clan Henna) |
| Wall: | paint | Pittsburgh | Spread-Flow | (white #21) |
| Wall: | vinyl | Flex-Wall | Pls. In a Roll | (Rajah Blue) |
| Wainscot: | paneling | Masonic | Fireguard | (walnut) |
| Ceiling: | acoustic | Gold Bond | Acoustinet | (fissure #21) |
| Trim: | paint | Glidden | Easy-Enamel | (0021 blue) |
NOTE: Submittals must be limited to those necessary for adequate quality control. The importance of an item in the project should be one of the primary factors in determining if a submittal for the item should be required.
1.3 SCOPE OF WORK
The work under this project consists of [a general list of items, no quantities; location with building number(s), Langley AFB, JBLE, Bethel Manor, etc.] as shown on [BCE Drawing XXFYXX] OR [the attached sketches].
1.3.1 Work Hours
Normal duty hours for Langley AFB, JBLE are 0730 through 1630, Monday through Friday. Work on weekends, recognized Federal holidays, or other than normal duty hours must be coordinated with the Contracting Officer (CO) or his/her designated representative.
1.3.2 General Working Conditions
a. Work shall be performed in such a manner as to cause minimum disruption to the users in the area.
b. The Contractor shall notify the Contracting Officer or his/her designated representative when he intends to work so Government inspection can be provided while work is in progress.
1.4 ORDER OF WORK
The Contractor shall coordinate all work with the Contracting Officer, or his/her designated representative, and the Base Civil Engineer. Before starting work at the job site, provide five days notice to the Contracting Officer or his/her designated representative and the Chief of Contract Management at 764-3268.
1.5 PHASING OF WORK
[SAMPLE ONLY – TAILOR TO MEET NEEDS OF PROJECT. USE ONLY WHEN WORK IS BROKEN INTO PHASES. YOU MAY WANT TO HAVE SEPARATE CONTRACT LINE ITEMS FOR EACH PHASE TO EASE ACCEPTANCE, PAYMENT AND WARRANTY ISSUES. DISCUSS OPTIONS WITH CONTRACTING.] The Contractor will be allowed to work in a maximum of [number] building at any one time. All work in assigned buildings must be completed within [number] days after start of work. Additional buildings will be assigned upon acceptance of assigned buildings.
[OR]
[SAMPLE ONLY – TAILOR TO MEET NEEDS OF PROJECT. USE ONLY WHEN WORK NEEDS TO BE SEQUENCED BUT FORMAL PHASES ARE NOT REQUIRED. WOULD NOT NEED SEPARATE CONTRACT LINE ITEMS.] The Contractor shall use the following Sequence of Work in preparing his Contract Progress Schedule. It lists only highlights of the construction program and is not intended in any way as a complete scope of work. Each item shall be completed before the next item may be started. Work items not listed may be scheduled at any time.
[List work elements in order they must be completed]
1.6 APPLICABLE CODES AND REGULATIONS
The latest edition of the following Building Codes shall be used for all construction under this contract:
A. International Building Code B. International Mechanical Code C. International Fire Code D. International Code Council (ICC) International Plumbing Code E. National Electrical Code (NEC) F. ANSI C-2, National Electrical Safety Code (QIESC) G. Life Safety Code, NFPA 101 H. National Fire Protection Association (NFPA) I. MIL Handbook 1190 J. Unified Facilities Criteria (UFC) 3-600-01 K. Applicable Unified Facilities Guide Specifications L. Supervisory Control and Data Acquisition (SCADA) M. American National Standards Institute (ANSI) N. American Standards for Testing Materials (ASTM) O. Institute of Electrical and Electronics Engineers (IEEE) P. International Society of Automation (ISA) Q. National Electrical Manufacturers Association (NEMA) R. Underwriters Laboratories, Inc. (UL) S. Leadership in Energy and Environmental Design (LEED®) for New Construction and Major Renovation v2.2 Reference Guide T. National Fire Protection Association Codes (NFPA) – latest edition U. Langley AFB, JBLE Electrical, Fire, and Communications Design Standards -- latest edition V. Air Force Engineering Technical Letter ETL 01-1, Reliability and Maintainability (R&M) Design Checklist NOTE: If there is a conflict between these codes or regulations and these contract specifications, the most stringent requirements shall apply at all times.
1.7 SALVAGE
Title to all materials and equipment to be demolished, excepting items indicated as Government salvage, shall be vested to the Contractor upon removal from the base except as noted below. The Government will not be responsible for the condition, loss or damage to such property after notice to proceed. All unsalvageable material will be disposed of legally off base.
1.7.1 Items Salvaged for the Government
The Contractor shall salvage the following existing materials to the Government as indicated below. Salvaged materials shall be cleaned, sorted, identified, bundled, boxed, etc. and delivered to the collection location identified below.
ITEM DELIVERY LOCATION
[List items to be salvaged and delivery location OR indicate “NONE”]
1.8 CONSTRUCTION STANDARDS
1.8.1 General
The Contractor is reminded that the construction site must be operated and maintained according to these specifications and is subject to inspection and enforcement according to all federal, state and local codes/regulations.
1.8.2 Office Trailers and Storage Units
1.8.2.1 Office Trailers
If a trailer is required for work and at the discretion of the Government, an office trailer may be located at the project site. The Contractor shall request Contracting Officer approval for the trailer location. The Contractor shall make the request in writing at least fourteen calendar days prior to placement of trailer at site. All office trailers shall be located in areas as directed by the Contracting Officer or his/her designated representative. Any office trailer shall be not more than 10’ x 32’ in size, provided with a skirt on all sides, in like new condition, and painted either Langley Brown (Federal Standard 595a, 20100), Langley Beige, or white. Office trailers in need of painting and / or repairs or that are in an unsightly condition will not be al-lowed at the project site. Displayed on the exterior of all trailers shall be a nameplate which has the name of the Contractor’s company, name for Contractor’s point(s) of contact (POC) and telephone number where he or she can be reached, contract number, project number, title and date trailer was placed on site where located.
1.8.2.2 Storage Units
The Contractor shall request Contracting Officer approval for the siting, size and color of Storage Units, CONEX boxes and dumpsters. The Contractor shall not bring any such items to the job site without the Contracting Officer’s approval. All storage units shall be painted Langley Brown (Federal Standard 595a, 20100), Langley Beige or white. Displayed on the exterior of all storage units shall be a nameplate which has the name of the Contractor’s company, name for Contractor’s point(s) of contact (POC) and telephone number where he or she can be reached, contract number, project number, title and date unit was placed on site where located.
1.8.3 On-Site Storage Units
Availability and size of material lay down area shall be restricted as noted on the contract documents or as discussed during the preconstruction conference. The Contractor shall consolidate all bulk or large quantities of materials at the construction site in area(s) approved by the CO. All such items shall be stored neatly grouped together. Bulky or unsightly construction materials, heavy or light equipment or tanks shall not be delivered to or stored on the construction site for any period longer than seven calendar days prior to use, installation in the project or start of construction. The Contractor shall store all supplies and equipment on project site to preclude theft or damage. Protection and security for materials and equipment on site is the sole responsibility of the Contractor. The Contractor shall not use any area(s) for material or equipment storage that has not been approved by the CO or his/her designated representative.
1.8.4 Fencing and Screening
Contractor shall enclose the lay down area with a chain link fence that has been erected to a minimum height of six feet. Contractor’s lay down area shall also be screened from view. Screening shall be fabricated of 100% Polypropylene, woven, 92% blockage fabric that has been mechanically attached to the fence for the full height of the fence. The edges of each section of screening fabric shall be finished with a reinforced hem. Attachment points shall be reinforced fabric built into the hem or metal grommets built into the hem. All fabric used for screening of the construction lay down area shall be UV rated and dark brown or dark bronze in color. Fence screening fabric shall be inspected weekly to insure all sections remain properly in-stalled and taut at all times.
1.8.5 Locksets
If locksets are installed as a result of this project, the Contractor shall provide cylinders and cores for new locks. Cylinders and cores that the Contractor provides shall have seven-pin tumblers using the A2 system and WB keyway – except for dormitories, which use the A4 system and WC keyway. All cylinders will be from a single manufacturer. All cores will be stamped with a key control symbol in a concealed place on the core. (For information only – the Best Premium WB Keyway, 7-pin core is part number 1CP7WB2.) The cylinders will be fully compatible with products of the Best Lock Corporation, which have interchangeable cores that are removable by special control keys.
Provide and submit a grand master keying system and a sub-master keying system for the building that is an extension of the existing Langley AFB, JBLE keying system. Best Lock Corporation can key cores and provide keys in accordance with the Langley AFB, JBLE grand master keying system; the base grand master keying system will not be made available to outside contractors. Key the equipment spaces and mechanical rooms separately from the building systems. Key them alike to the existing Langley AFB, JBLE systems for equipment and mechanical space doors. Prior to installing any lock cylinder or cores, the contractor shall coordinate with the Langley AFB, JBLE locksmith to ensure compliance with the grand master keying system and master keying sequence, and that the proposed lock hardware will meet requirements of this specification.
1.8.6 Communications
The Contractor shall design and install new communications in accordance with the most current version of 633d COMM PREMISE WIRE DISTRIBUTION SYSTEM SPECIFICATIONS (Langley AFB, JBLE)
IF COMM IS SPECIFIED, INCLUDE THIS SECTION IN THE SPECIFICATIONS PACKAGE.
1.8.7 Electrical Panels
Any electrical panel altered by the Contractor shall have every circuit and circuit modification legibly identified as to its clear, evident and specific purpose and use. The identification shall include sufficient detail to allow each circuit to be distinguished from all others. Spare positions that contain unused overcurrent devices or switches shall be described accordingly. The identification shall be included in a circuit directory that shall be located on the face or inside of the panel door in the case of a panelboard and located at each switch in a switchboard. No circuit shall be described in a manner that depends on transient conditions of occupancy. This is in accordance with §408.4 of the 2008 version of the National Electric Code (NEC).
1.9 CONTRACTOR OPERATIONS
1.9.1 Grassy Areas
Grass and weed growth in excavated materials that are stockpiled on site shall be controlled or cut weekly. Weeds and grass within the construction site shall also be controlled or cut weekly and any bushes or shrubs shall be trimmed monthly. Areas disturbed by construction or those areas required by the plans to be “re-seeded” shall be re-established by hydroseeding only. Straw shall not be used as a cover for freshly seeded areas.
1.9.2 Privately Owned Vehicles (POVs)
POVs used by Contractor personnel to commute to work are required to park in existing parking lots. Contractor or Contractor’s employees, including subcontractors, shall not park any personally owned vehicle (POV) or company or delivery vehicle on grassy areas near or in the construction site without prior approval from the Contracting Officer, or his/her designated representative. When allowed, parking on grassy areas will only be for short-term delivery purposes (to include heavy tools, equipment, construction materials, etc.). Use designated hard surfaces or existing parking lots near or within the project site for parking of POVs or company or delivery vehicles. Tire and track impressions (ruts) created on wet or soft soil by vehicles or equipment used in the Contractor’s operations shall not be left for more than one day after removal of such vehicle or equipment that cased the rutting. The Contractor shall restore the affected area(s) of the site to its original condition within that one-day period.
1.9.3 Site Cleanup
During construction, the Contractor shall maintain all areas in a neat and orderly manner. Contractor shall keep the construction site cleaned daily of all construction trash, trash generated by employees, debris or demolished building materials. If the work areas are not kept neat and orderly, the Contractor must return to the area to correct the unacceptable condition. During the laying of asphalt roads, streets or parking surfaces, areas soiled by residual asphalt shall be cleaned daily. The Contractor shall treat with lime entrances and exits to asphalt work site at his/her own expense.
1.9.4 Access Routes
Access routes to this project shall be limited through the Base as shown on the plans. The Contractor shall not use the gates at King Street Bridge or West Gate (Sweeney Boulevard) for haul route entry. When exiting the base, the haul route shall be through the West Gate only.
1.9.5 Removal of Formwork
The Contractor shall remove all concrete formwork and boards within fourteen calendar days after concrete pour.
1.9.6 Noise Control
The Contractor shall comply with all applicable state, local and installation laws, ordinances and regulations relative to noise control, to include applicable quiet hours exclusive to Langley AFB, JBLE. Work site is in a residential area of Langley AFB, JBLE. There shall be absolutely no construction activities in or around the construction site prior to or after the hours designated in “Work Hours” paragraph above without an approval from the Contracting Officer, or his/her designated representative. This restriction also applies to holidays also.
1.9.7 Excavations
All trenches/excavations shall be back filled and compacted to 95% of maximum Proctor density. Trenches will be top dressed with no less than three inches of shifted topsoil and then compacted. The finished area will be free of all debris, rocks and then graded to conform to the surrounding area. The area will be hydroseeded in accordance with SECTION 32 92 19 HYDROSEEDING of the specifications.
IF HYDROSEEDING IS SPECIFIED, INCLUDE 32 92 19 IN THE SPECIFICATIONS PACKAGE.
1.9.8 In-Ground Obstructions
Any type of raised obstructions shall have the surrounding soil backfilled, compacted to 95% of maximum Proctor density, and graded. The area will be top dressed as above to within three inches of the top of obstruction. Ground level obstructions will have the area dressed to the level of the obstruction. The area will be hydroseeded in accordance with SECTION 32 92 19 HYDROSEEDING of the specifications.
IF HYDROSEEDING IS SPECIFIED, INCLUDE 32 92 19 IN THE SPECIFICATIONS PACKAGE.
1.9.9 Architectural Compatibility
Due to Langley AFB, JBLE’s distinct historic architecture and the high visitor traffic it receives, several special actions are required during construction:
a. The Contractor is solely responsible for spillage from his/her vehicles and such spillage shall be cleaned up immediately. For the duration of this contract and on a daily basis, the Contractor shall remove from all base roads and streets asphalt, mud, soil, rocks, trash and debris that result from his/her construction operation on base. All roads or streets affected shall be cleaned before close of business on the particular day affected. In the case of asphalt, roads will be cleaned and/or treated with lime immediately upon detection.
b. Newly placed concrete curbing and sidewalks shall match existing, adjacent concrete in color and texture.
c. Unprimed or factory-finished equipment installed on the exterior of facilities shall be painted with two coats of brown paint to match existing equipment.
1.9.10 Patching
All holes in walls or other parts of the structure where material or equipment is removed or replaced shall be sealed, painted, caulked or plugged neatly with original type of materials to match the existing part of the structure so involved. All above work and materials shall be approved by the Contracting Officer or his/her designated representative.
1.9.11 Repairs
Replace or restore all pavement, curb and gutter, and sidewalk disturbed by operations under this contract to the original condition, except where shown or specified otherwise. Compact backfill in pavement repairs with mechanical tampers to affect a density equal to adjacent subgrade. Replace pavement with equal materials and equal thicknesses to that removed, unless indicated otherwise. Each pavement area shall be replaced immediately after the work operation for that area is completed. At the Contractor’s option, a temporary repair with a surface of bituminous concrete may be made immediately and removed and the permanent repair made before completion of the contract.
1.9.12 Marking
Contractor shall not mark any curb or pavement with paint.
1.9.13 Protection Requirements
The Contractor shall at all times protect and preserve the property of the Government which is within the work area and could be affected by the accomplishment of the work specified and indicated, and all parties and individuals within or near the work areas who could be endangered by the installation of the work.
1.9.14 Accidental Spills
In the event of fuel spillage during the performance of this contract, the Contractor shall be responsible for its containment, clean-up and related disposal costs. The operator shall have sufficient spill supplies readily available on the pumping vehicle or at the site to contain any spillage. In the Event of a Contractor related release, the Contractor shall immediately notify the Environmental Management Office and take appropriate actions to correct its cause and prevent future occurrences. If the federal, state, or local authorities assess any monetary fine, penalty or assessment related to the release of any substance by the Contractor, his/her employees, or agents during the performance of this contract, the Contractor shall be solely liable for its payment, authorizes the United States Air Force to withhold such form of payment and otherwise indemnify and hold the United States Air Force harmless.
1.10 ENVIRONMENTAL PROTECTION. Please refer to Langley AFB, JBLE SECTION 01 12 00, Environmental Special Conditions.
1.10.1 Environmental Restoration Program (ERP) Requirements
[Include only if work is in ERP area. Ensure drawings define IRP boundaries and well locations]
1.10.1.1 Contaminated Soil and Free Products
Any material (soil) that is suspected of containing petroleum products shall be reported to the Contracting Officer or his/her designated representative. If discovered, the Contractor shall mitigate any potential threat to the workers, public and environment. The area that will be disturbed under this contract has the potential to have free product migrate into and under the construction site. Comply with VR-680 and record the quantity of any fuel removed from [the line]. Contaminated soil or free product shall not be used for backfill or removed from the base without written approval from the Contracting Officer. Once removal is approved, Contractor shall dispose of material under guidance of the Pollution Prevention Officer (633 CES/CEAN). All hazardous waste manifests shall be prepared by the Contractor and shall be coordinated, approved and signed by 633 CES/CEAN Hazardous Waste Manager (37 Sweeney Boulevard) prior to removal of such waste from the base.
1.10.1.2 Site Safety
Site summaries from our Management Action Plan are furnished with this contract to familiarize personnel with the potential hazards associated with construction and demolition work at these sites. Ensure workers are informed of potential hazardous exposures from working at these sites, and that the appropriate precautions are followed to minimize hazards to human health and the environment. Personnel working at these sites shall have 40-hour HAZWOPER Training. At least one individual on site should have completed the OSHA 8-hour supervisor training course. The plans identify the boundary of these IPR sites. To perform work at these sites, the Contractor must have a Health and Safety Plan and Hazardous Waste Disposal Plan for proper disposal of all regulated materials generated during execution of this project.
1.10.1.3 Monitoring Wells
There are several monitoring wells installed in and around the proposed construction area. Site maps and construction drawings provide the location of these wells. The Contractor shall take all precautions to prevent any damage to wells. If the wells and associated structures are damaged during the project, the Contractor shall repair/replace all damages at no additional expense to the Government. Contractor shall dispose of all regulated materials during repair of the damaged structures and remove any free product as required by Virginia Department of Environmental Quality (VDEQ) regulations.
1.10.1.4 Additional Excavation
Prior to any excavation beyond the immediate area or boundary of the construction site, the Contractor shall coordinate with 633 CES/CEAN and obtain the Contracting Officer’s approval.
1.10.2 NOTIFICATION OF ASBESTOS CONTAINING MATERIALS (ACM)
[Specifier Select One of the Following Paragraph]
1.10.2.1 Asbestos Notification
Tests have indicated that Asbestos Containing Materials (ACM) are not present in the areas affected by this work. However, if ACM are exposed that were not previously known to exist, the Contractor shall cease work in the affected area and notify the Contracting Officer. If the Contractor is tasked to remove the discovered the ACM, all asbestos removal work is subject to OSHA, EPA and Commonwealth of Virginia compliance and inspection for asbestos abatement. Contractor must perform asbestos removal work in accordance with these specifications and EPA National Emissions Standards for Hazardous Air Pollutants (NESHAPs) for asbestos and any subsequent updates thereto. This includes State and EPA Region 3 Notifications that shall be accomplished at least 20 days prior to starting any asbestos abatement or removal. A copy of the notifications shall be submitted to the Contracting Officer. All hazardous waste manifests shall be signed by 633 CES/CEAN (37 Sweeney Boulevard) prior to removal of such waste from the base. Only CEV is authorized to sign these manifests. The Asbestos Program Manager is Mr. Robert Jones who can be contacted at (757) 764-1126. Please contact him if you have any questions.
[OR]
1.10.2.1 Asbestos Notification
Tests have indicated the presence of Asbestos Containing Materials (ACM) in the areas affected by this work. Contractor is reminded that all asbestos removal work is subject to OSHA, EPA and Commonwealth of Virginia compliance and inspection for asbestos abatement. Contractor must perform asbestos removal work in accordance with these specifications and EPA National Emissions Standards for Hazardous Air Pollutants (NESHAPs) for asbestos and any subsequent updates thereto. This includes State and EPA Region 3 Notifications that shall be accomplished at least twenty days prior to starting any asbestos abatement or removal. A copy of the notifications shall be submitted to the Contracting Officer. All hazardous waste manifests shall be signed by 633 CES/CEAN (37 Sweeney Boulevard) prior to removal of such waste from the base. Only CEV is authorized to sign these manifests. The Asbestos Program Manager is Mr. Robert Jones who can be contacted at (757) 764-1126. Please contact him if you have any questions.
1.11 PROTECTION OF GOVERNMENT PROPERTY
1.11.1 General
The Contractor shall at all times protect and preserve the property of the Government which is within the work area and could be affected by the accomplishment of the work specified and indicated, and all parities and individuals within or near the work areas who could be endangered by the installation of the work. Protection requirements include protecting the interior of the facility from inclement weather. Any actions necessary for adequate protection are solely the Contractor’s responsibility. Any temporary boarding of windows or doors must be painted Langley Brown or Langley Beige to match the exterior.
1.11.2 Protection of Equipment
Contractor is required to cover equipment that is to remain in place within the area of contract operations and protect it against damage or loss and store equipment that is removed in performance of work where directed or use in work as required by drawings and specifications. Equipment temporarily removed shall be protected and returned equal to its condition prior to starting work at no additional expense to the Government. Security for equipment or material that is to be reused and is removed for temporary storage shall be the sole responsibility of the Contractor.
1.11.3 Protection of Grounds
Contractor shall provide protective barriers for all grass, trees, shrubs, sidewalks, curbs and gutters within the construction boundary. Furthermore, such items, including grass, outside the construction boundary shall also be protected during delivery of materials or moving of equipment. Damages caused by the Contractor to existing grounds, plants, pavements, utilities, work by others, fixtures, or furnishings shall be repaired by the Contractor. Such repairs shall be of as good condition as exited before the damaging, unless such existing work is scheduled for removal or replacement by the work requirements of the contract. This requirement also pertains to grading of site to remove all clods and grade irregularities prior to final inspection and acceptance. The Contractor may be required to install temporary fencing to protect the site, at no cost to the Government.
1.12 SAFETY
1.12.1 Safety Barriers and Signs
Contractor shall provide barricades, traffic control signs and construction safety signs that meet industry standards. Actual location, size and final arrangement of these items shall be discussed and approved by the Contracting Officer prior to installation. Such approved items shall be of uniform size, design and color. All cones, barricades, warning lights, temporary signs and protective devices shall conform to the current requirements of the Federal Highway Administration’s Manual of Uniform Traffic Control Devices for Streets and Highways (MUTCD) and the US Army Corps of Engineers Safety and Health Requirements Manual EM 385-1-1.
http://mutcd.fhwa.dot.gov/pdfs/2003r1r2/pdf_index.htm
1.12.2 Employee Health and Safety
1.12.2.1 Compliance
In order to provide safety controls for protection to the life and health of employees and other persons; for prevention of damage to property, materials, supplies, and equipment; and for avoidance of work interruptions in the performance of this contract, the Contractor shall comply with all pertinent provisions of the Corps of Engineers Manual, EM 385-1-1 (2003), entitled “Safety and Health Requirements Manual”, as amended. The Contractor will also take or cause to be taken such additional measures as the Contracting Officer or his/her designated representative may determine to be reasonably necessary for the purpose. A copy of the manual is available for review in the Civil Engineering Contract Management Section office (Building 328) or copies can be obtained from the Government Printing Office, Washington DC 20402.
1.12.2.2 Subcontractor’s Compliance
Compliance with the provisions of this clause by subcontractors will be the responsibility of the Contractor.
1.12.2.3 Safety Records
The Contractor will maintain an accurate record of, and will report to the Contracting Officer or his/her designated representative in the manner and on the forms prescribed by the Contracting Officer or his/her designated representative, exposure data and all accidents resulting in death, traumatic injury, occupational disease, and damage to property, materials, supplies and equipment incident to work performed under this contract.
1.12.2.4 Notification of Non-Compliance and Corrective Action The Contracting Officer or his/her designated representative will notify the Contractor of any noncompliance with the foregoing provisions and the action to be taken. After receipt of such notice, the Contractor shall take immediate corrective action. Such notice, when delivered to the Contractor or his/her representative at the site of the work, shall be deemed sufficient for the purpose. If the Contractor fails or refuses to comply promptly, the Contracting Officer or his/her designated representative may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop orders shall be made the subject of claim for extension of time or for excess costs or damages by the Contractor.
1.12.3 Applicable Publications
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
a. Code of Federal Regulations (CFR):
(1) OSHA General Industry Safety and Health Standards (29 CFR 1910); Publication V2206; OSHA Construction Industry Standards (29 CFR 1926). One source of these regulations is OSHA Publication 2207, which includes a combination of both Parts 1910 and 1926 as they relate to construction safety and health. They are for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402.
b. National Emission Standards for Hazardous Air Pollutants (40 CFR, Part 61).
c. Federal Standard (Fed. Std.):
(1) 313A Material Safety Data Sheets, Preparation and the Submission to the BioEnvironmental Office on Langley AFB, JBLE. Safety and Health Requirements Manual, EM 385-1-1
(2) Use of Asbestos Containing Material or any Class 1 ozone depleting chemical compounds is prohibited at Langley AFB, JBLE, DA Circular 40-83-4
(3) Work covered by this section: This section is applicable to all work covered by this…