Amendment 0005.doc

DOC document 62 KB Posted

Attached to
Multiple Award Construction Contract (MACC) at Langley AFB/Ft Eustis AB, VA Federal contract opportunity
Solicitation number
FA4800-11-R-0002
Issued by
Department of the Air Force Air Combat Command

About this file

Amendment 0005

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC) at Langley AFB/Ft Eustis AB, VA, newest first.
File Type Posted
Attch 22 - 27 10 10 BUILDING TELECOMMUNICATIONS WIRING.docx DOCX document
QUESTIONS AND ANSWERS 1-339.docx DOCX document
Attch 23 - 28 31 65 Addressable System.docx DOCX document
Test Hole Locations pdf.zip ZIP file
Attch 17 RFP Amend 03.docx DOCX document
Attch 24 - 28 31 66 Conventional System.docx DOCX document
Attch 20 QUESTIONS AND ANSWERS 305 - 319.docx DOCX document
TITLE BLOCK.dwg DWG drawing
BASE-H09125H-01SNew.dwg DWG drawing
LAFB-Plans-35 -Submittal.dwg DWG drawing
Test-Hole-Locations.dwg DWG drawing
Attch 20 QUESTIONS AND ANSWERS 284-304.docx DOCX document
Test-Hole-Locations.dwg DWG drawing
Bldg 366c.pdf PDF
Bldg 337b.pdf PDF
Bldg 325.pdf PDF
Bldg 366f.pdf PDF
Bldg 366e.pdf PDF
Bldg 337a.pdf PDF
Bldg 366g.pdf PDF
Bldg 338.pdf PDF
Bldg 366d.pdf PDF
Bldg 366.pdf PDF
Bldg 333a.pdf PDF
Bldg 366a.pdf PDF
Bldg 337.pdf PDF
Bldg 325a.pdf PDF
Bldg 338a.pdf PDF
SF 30 Amendment 0004.doc DOC document
Attch 20 Question Answers Cont.docx DOCX document
Attch 17 RFP Amend 02.docx DOCX document
Amend 0002 attachemnts.zip ZIP file
Amendment 0002.doc DOC document
Amendment 0001.pdf PDF
Attch 11 Section 01 12 00.docx DOCX document
Attch 01B PastPeformanceInformationSheet.doc DOC document
Attch 14 Ft Eustis Specific Instructions.docx DOCX document
Attch 10 LAFB 01 06 00 Regulatory Requirements.docx DOCX document
Attch 09 LAFB Section 01 11 00 - 09Aug2010.docx DOCX document
Attch 04 ConsentLetter.doc DOC document
Plans-PDF files.zip ZIP file
Attch 01A Past_Performance_Questionnaire.docx DOCX document
Attch 12 LAFB ETL 01-18 Fire Protection Engineering.pdf PDF
Attch 16 NAFI GENERAL PROVISIONS —
Attch 13 LAFB PremisesDistributionSpecs - Revised June10.docx DOCX document
Attch 06 Teaming List.doc DOC document
RFP Design Build SoW 06-4088.docx DOCX document
Attch 02 Financial_Information_Request.docx DOCX document
Attch 03 Bonding_Information_Request.docx DOCX document
Attch 08 AF 3064 Progress Sched.xfd —
Show all 50

Multiple Award Construction Contract (MACC) at Langley AFB/Ft Eustis AB, VA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

BLOCK 14 - CONTINUATION

The purpose of this Amendment is to extend the proposal due date, incorporate and make various changes to the solicitation and attachments.

a. The proposal due date is changed from 6 October 2011 to 18 October 2011 at 1400.

b. Incorporate Questions and Answers 305 through 339

c. Changes to Solicitation:

Section J – Incorporate Attachments: Attch 20 – Questions and Answers 1 through 339;

Attch 22 – 27 10 10 Building Telecommunication Building Cabling System Standards; Attch 23 – 28 31 65 Fire Detection and Alarm System Addressable; Attch 24 – 28 31 66 Fire Detection and Alarm System; and Attch 25 – UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard

d. Changes to RFP Attachment 17: Correct the General Decision Wage Determination in the Attachments to VA 100150, Mod 1, dated 12/03/2010.,

· Incorporate 5 pdf Drawing for Test Hole Locations.

e. All other terms and conditions remain unchanged.

The following have been deleted:

CONTINUATION (AMENDMENT 0003)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

Exhibit/Attachments Table of Contents

DOCUMENT TYPE

DESCRIPTION

PAGES

Attachment 01
Performance Questionnaire Lette
1
Attachment 01A
Past Performance Questionnaire
8
Attachment 01B
Past Performance Information Sheet
3
Attachment 02
Financial Information Request & Release
1
Attachment 03
Bonding Information Request
2
Attachment 04
Consent Letter
1
Attachment 05
Client Authorization Letter
1
Attachment 06
Teaming List
1
Attachment 07
AF Form 3052 Construction Cost Breakout
3
Attachment 08
AF 3064 Progress Schedule
1
Attachment 09
Langley Section 01110 General Specification
31
Attachment 10
LAFB 01 06 00 Regulatory Requirements
2
Attachment 11
LAFB 01 12 00 Asset Management Specification Conditions
35
Attachment 12
LAFB ETL1-18 Fire Protection
26
Attachment 13
LAFB Premises Distribution System Specification
14
Attachment 14
Ft Eustis – Specific Special Instruction
16
Attachment 15
Langley – General Provisions
10
Attachment 16
NAFI General Provisions/Clauses
7
Attachment 17
Langley Seed Project
31
Attachment 18
NDA
2
Attachment 19
Civil Engineer Work Clearance Request Instruction
12
Attachment 20
Question and Answers
45
Attachment 21
Pre-Proposal/Site Visit Attendee List
7
Attachment 22
Specification Section 27 10 10 Langley Air Force Base Telecommunications Building Cabling System
42
Attachment 23
Specification Section 28 31 65 Fire Detection and Alarm System, Addressable
20
Attachment 24
Specification Section 28 31 66 Fire Decection and Alarm System
14
Attachment 25
UFC 1-300-02 Unified Facilities Guide Specification (UFGS) Format Standard
20

(End of Summary of Changes)

File details come from the government source that posted it. Updated .