Amendment 0004

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC) at Langley AFB/Ft Eustis AB, VA, newest first.
File Type Posted
Attch 22 - 27 10 10 BUILDING TELECOMMUNICATIONS WIRING.docx DOCX document
Attch 24 - 28 31 66 Conventional System.docx DOCX document
Amendment 0005.doc DOC document
Attch 25 UFC 1-300-02 Unified Facilities Guide Specs.pdf PDF
QUESTIONS AND ANSWERS 320 -339.docx DOCX document
QUESTIONS AND ANSWERS 1-339.docx DOCX document
Attch 23 - 28 31 65 Addressable System.docx DOCX document
Attch 20 QUESTIONS AND ANSWERS 305 - 319.docx DOCX document
LAFB-Plans-35 -Submittal.dwg DWG drawing
Test-Hole-Locations.dwg DWG drawing
LAFB-Plans-35 -Submittal-Cover.dwg DWG drawing
TITLE BLOCK.dwg DWG drawing
Attch 20 QUESTIONS AND ANSWERS 284-304.docx DOCX document
Test-Hole-Locations.dwg DWG drawing
Bldg 366c.pdf PDF
Bldg 337b.pdf PDF
Bldg 325.pdf PDF
Bldg 366f.pdf PDF
Bldg 325a.pdf PDF
Bldg 338a.pdf PDF
bldg 338b.pdf PDF
Bldg 333.pdf PDF
bldg 366b.pdf PDF
Bldg 366e.pdf PDF
Bldg 337a.pdf PDF
Bldg 366g.pdf PDF
Bldg 338.pdf PDF
Bldg 366d.pdf PDF
Bldg 366.pdf PDF
Attch 17 RFP Amend 02.docx DOCX document
Attch 20 Question Answers Cont.docx DOCX document
AutoCAD 2000.zip ZIP file
Amend 0002 attachemnts.zip ZIP file
Amendment 0002.doc DOC document
Attch 11 Section 01 12 00.docx DOCX document
Attch 01B PastPeformanceInformationSheet.doc DOC document
Attch 14 Ft Eustis Specific Instructions.docx DOCX document
Attch 10 LAFB 01 06 00 Regulatory Requirements.docx DOCX document
Attch 09 LAFB Section 01 11 00 - 09Aug2010.docx DOCX document
Attch 08 AF 3064 Progress Sched.xfd —
Attch 07 AF 3052 Construction Cost Estimate.xls XLS spreadsheet
Attch 15 General Provisions for MACC.docx DOCX document
Attch 05 ClientAuthorizationLetter.doc DOC document
FA4800-11-R-0002 MACC Solicitation.doc DOC document
Attch 04 ConsentLetter.doc DOC document
Plans-PDF files.zip ZIP file
Attch 01A Past_Performance_Questionnaire.docx DOCX document
Attch 12 LAFB ETL 01-18 Fire Protection Engineering.pdf PDF
Attch 16 NAFI GENERAL PROVISIONS —
Attch 13 LAFB PremisesDistributionSpecs - Revised June10.docx DOCX document
Show all 50

Multiple Award Construction Contract (MACC) at Langley AFB/Ft Eustis AB, VA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

NOTE: DUE TO COMPUTER ERROR THERE IS NO AMENDMENT 0003

The following have been added by full text:

CONTINUATION (AMENDMENT 0003)

The purpose of this Amendment is to extend the Proposal Due Date, incorporate and make various changes to the solicitation, and attachments.

a. The proposal due date is changed from 15 September 2011 to 06 October 2011, time and place remain unchanged.

b. Incorporate Questions and Answers.

c. Changes to the Solicitation:

· Section L Instruction, Conditions and Notices to Bidders - Paragraph E.3.

d. Changes to the RFP Attachment 17:

· Changing the 90% Design requirement to Drawing Sheet 3 and any other drawings that are related.

· Incorporate – 18 Foundation Drawing (pdf) for Buildings 325, 333, 337, 338, and 366.

e. All other terms and conditions remain unchanged.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS TO OFFERORS

Section L - Instructions, Conditions and Notices to Bidders

A. PROGRAM STRUCTURE AND OBJECTIVE

The Government intends to award up to six (6) contracts for the Langley/Eustis Multiple Award Construction Contract (MACC) program. The Government reserves the right to award without discussions. Award will be made on the basis of “best value” utilizing PERFORMANCE PRICE TRADEOFF (PPT) source selection procedures with technical factors to be evaluated on a pass/fail basis. Each awarded contract will have a one (1)-year base period, and four (4) 1-year options. The Government reserves the right not to exercise an option period if determined not to be in the best interest of the Government.

B. GENERAL INSTRUCTIONS

1. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. This section of the Instructions to Offerors (ITO) provides general guidance for preparing proposals as well as specific instructions on the format and content of the proposal. The Offeror’s proposal must include all data and information requested by the ITO and must be submitted in accordance with these instructions. Any Offeror who submits an incomplete package may be considered non-responsive and thus ineligible for award. Non-conformance with the instructions provided in the ITO may result in an unfavorable proposal evaluation.

2. The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposal should not simply rephrase or restate the Government's requirements, but rather shall provide convincing rationale to address how the Offeror intends to meet these requirements. Offerors shall assume that the Government has no prior knowledge of their facilities and experience, and will base its evaluation on the information presented in the Offeror’s proposal.

3. Elaborate brochures or documentation, binding, detailed artwork, or other embellishments are unnecessary and are not desired.

4. Pre-Proposal Conference: A pre-proposal conference will be held on 14 July 2011 at 10:00 AM. All prospective offerors are highly encouraged to attend this conference. In order to make the conference as productive as possible, offerors should submit, no later than 12 July 2011, any questions they may have in writing to Delores Powell at delores.powell@langley.af.mil . The submission of written questions will not preclude anyone from posing questions during the conference. Responses to questions asked during the conference shall be posted to the Federal Business Opportunities (FedBizOpps) web site at http://www.fbo.gov. Prospective offerors are advised that the pre-proposal conference will be held solely for the purpose of explaining the concepts involved in the seed project and the specifications, terms, and conditions of this solicitation. NOTE: Offerors are encouraged to submit all additional questions and requests for clarifications no later than close of business fifteen (15) days prior to the RFP closing date. The decision whether to respond to questions and requests for clarification made less than fifteen (15) days prior to the RFP closing shall be at the sole discretion of the contracting officer. Failure of a prospective offeror to submit any questions or attend the conference will be construed to mean that the prospective offeror fully understands all requirements of the solicitation.

5. In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. Unless the Offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals.

C. PROPOSAL PREPARATION INSTRUCTIONS

1. Proposals must be completed and submitted prior to the time listed in Block 13 of the SF 1442. The “original” proposal shall be clearly identified, shall be addressed to the Contracting Officer, and be submitted to the following address:

633 CONS/LGCB

ATTN: DELORES POWELL

74 NEALY AVENUE

LANGLEY AFB, VA 23665-2088

2. Compliance: To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Failure to meet a requirement may result in an offer being considered non-responsive and thus ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The proposal shall consist of three (3) separate volumes;

Volume 1 – TECHNICAL PROPOSAL

Volume 2 – PAST PERFORMANCE INFORMATION

Volume 3 – PRICE PROPOSAL

3. Point of Contact: The Contracting Officer (CO) and Contract Administrator (CA) are the points of contact for this acquisition. Address any questions or concerns you may have to the CO and CA. Written requests for clarification may be sent to the CO and CA at the address located in Block 7 of the SF 1442.

4. Debriefings: The CO will promptly notify an Offeror of any decision to exclude them from the competitive range, whereupon they may request and receive a debriefing in accordance with FAR 15.505. The CO will notify all unsuccessful Offerors in accordance with FAR 15.503 once an award decision(s) has been made. Upon such notification, unsuccessful Offerors may request and receive a debriefing. Offerors desiring a debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.

5. Discrepancies: If an Offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the Offeror shall immediately notify the CO and CA in writing with supporting rationale. The Offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussions.

6. Electronic Reference Documents: All referenced documents for this solicitation are available on the Federal Business Opportunities (FedBizOpps) web site at http://www.fbo.gov. Potential Offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.

7. Amendments to Solicitation: Amendments and notices will be posted to FedBizOpps.gov. It is the offeror’s responsibility to check the website periodically for any amendments to the solicitation. Please note that notices do not change the solicitation. Changes to the solicitation can only be made by the issuance of an amendment. If this RFP is amended, all terms and conditions that are not revised will remain unchanged and in full force and effect. Offerors shall acknowledge receipt of any amendment and provide confirmation upon submission of the offeror’s proposal. Any unacknowledged amendments in the offeror’s proposal may be considered as non-acceptance and may negatively affect their evaluation.

8. Submission, Modification, Revision, and Withdrawal of Proposals: Proposals and modifications to proposals shall be submitted in sealed envelopes or packages in paper media and electronic media addressed to the CO and CA at the address shown in Block 7 of the SF 1442, and showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.

9. Page Limitations: Page limitations shall be treated as maximums. If exceeded, the excess pages will not be read or considered in the evaluation of the proposal and (for paper copies) will be returned to the offeror as soon as practicable. Page limitations may also be placed on responses to Evaluation Notices (ENs). The specified page limits for EN responses will be identified in the letters forwarding the ENs to the offerors. Each page shall be counted except the following: executive summary, blank pages, title pages, tables of contents, tabs, and glossaries and those parts of the Proposal noted as unlimited.

10. Page Size and Format:

a. A page is defined as each face of a sheet of paper containing information. When both sides of a sheet display printed material, it shall be counted as two pages. Page size shall be 8.5 x 11 inches, not including foldouts. Pages shall be single-spaced with 1.5 line spacing between paragraphs. Except for the reproduced sections of the solicitation document, the text size shall be no less than 12 points. Tracking, kerning, and leading values shall not be changed from the default values of the word processing or page layout software. Use at least 1 inch margins on the top and bottom and 3/4 inch side margins. Pages shall be numbered sequentially by volume. These page format restrictions shall also apply to responses to Evaluation Notices (ENs). These limitations shall apply to both electronic and hard copy proposals.

b. Legible tables, charts, graphs and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated and shall not exceed 11 x 17 inches in size. Foldout pages shall fold entirely within the volume, and count as a single page. Foldout pages may only be used for large tables, charts, graphs, diagrams and schematics; not for pages of text. For tables, charts, graphs and figures, the text shall be no smaller than 10 point. These limitations shall apply to both electronic and hard copy proposals.

11. Electronic Copies: The content and page size of electronic copies must be identical to the hard copies. When discrepancies exist between the written offers and those provided in electronic format, the written offer will take precedence in all cases. For electronic copies, indicate on each CD-ROM the volume number and title. Use separate files to permit rapid location of all portions, including required plans, exhibits, appendices and attachments, if any. The electronic copies of the proposal shall be submitted in a format readable by Microsoft (MS) Word 2007®, MS Excel 2007®, MS-Project 2007®, and MS-Power Point 2007® as applicable.

12. Pricing Information: All pricing information shall be addressed ONLY in the Price Proposal and Contract Documentation volumes. Work-hour estimates and material kinds and quantities may be used in other volumes only as appropriate for presenting rationale.

13. Cross Referencing: To the greatest extent possible, each volume shall be written on a stand-alone basis so that its contents may be evaluated with a minimum of cross-referencing to other volumes of the proposal. Information required for proposal evaluation that is not found in its designated volume will be assumed to have been omitted from the proposal. Cross-referencing within a proposal volume is permitted.

14. Indexing: Each volume shall contain a more detailed table of contents to delineate the subparagraphs within that volume. Tab indexing shall be used to identify sections.

15. Glossary of Abbreviations and Acronyms: Each volume shall contain a glossary of all abbreviations and acronyms used, with an explanation for each. Glossaries do not count against the page limitations for their respective volumes.

D. OFFERS

1. The offer/proposal and other information shall be submitted in hard copy and electronic copy

(standard CD) format. The proposal shall consist of the following volumes:

Volume 1 – TECHNICAL

Volume 2 – PAST PERFORMANCE

Volume 3 – PRICE (including SF 1442) Separate CDs are not required for each volume. Offerors shall submit the SF 1442 on paper with an original signature. Offerors are advised to submit sufficient information to enable evaluators to fully ascertain the offeror’s capability to perform the requirements contemplated by the solicitation. The data submitted with each proposal shall be complete and concise but not elaborate.

2. A list of the offeror’s primary Points of Contact shall be submitted as part of the Technical proposal using the format shown in Attachment #01B of the Past Performance Packet.

E. VOLUME 1 – TECHNICAL

1. Format and Limitations:

a. Three (3) Hard Copies,

b. One (1) Electronic Copy

c. Page Limitation: Unlimited for 90% design as described below, 20 pages for all else.

2. Your response will be evaluated against the Technical factors defined in Section M, Evaluation Factors for Award. Using the instructions provided below, provide as specific as possible the actual methodology you would use for accomplishing/satisfying these subfactors. All the requirements specified in the solicitation are mandatory. By your proposal submission, you are representing that your firm will perform all the requirements specified in the solicitation. It is neither necessary nor desirable for you to state this in your proposal. Do not merely reiterate the objectives or reformulate the requirements specified in the solicitation. Furthermore, it is neither necessary nor desirable to provide resumes for individual personnel as part of your proposal.

3. Execution and Completeness of the Seed Project: The offeror shall provide a technical approach to accomplish the design-build seed project: Project No. MUHJ 06-4088, Repair Water Distribution System at Langley AFB, VA, in accordance with Attachment #17, Statement of Work. As a minimum, the proposed approach shall describe all of the following essential components:

a. The contractor shall provide a complete 90% construction design that addresses the work described on drawing sheet 3. Any other drawing sheets that relate to the work described on sheet 3 are applicable to the extent that they relate to this work.

· The work detailed on drawing sheet 3 consists of water distribution work at facilities 325, 326, 327, 328 and 329 and removal of one fire hydrant.

· Item 4 in the RFP Amendment 01 (12 August 2011), requiring the water service to be connected at the first valve in the mechanical room at 325, applies. Evaluate and include design for bid option 1, applicable to facility 325.

· Provide marked-up specification sections listed in RFP Amendment 01 (12 August 2011), that apply to the work described on drawing sheet 3 (and other applicable drawing sheets). [Providing marked-up sections (versus fully-edited sections) will allow the reviewers of the technical proposal to better identify choices and decisions the designer makes in editing the sections.]

· For the purpose of the preparation of the technical volume, the appropriate requirements contained in sections 01 06 00, 01 11 00 and 01 12 00 apply. A working knowledge of Langley AFB is needed in order to effectively edit these sections; it is not our intent to penalize a designer who may be less familiar with Langley AFB. It is not necessary to edit these three sections for your technical volume.

Clarification: The Langley AFB Special Conditions Sections 01 11 00 and 01 12 00, provided in the solicitation package, are unedited boiler-plate specifications sections that addresses issues unique to Langley AFB. The surveys and drawing format described in paragraph 1.24 of section 01 11 00 describe how these are to be performed and provided when they are required in execution of a project. These and other items are not required in each and every project. Surveys, topographic mapping and many other items contained in the special conditions will not apply to this project. If guidance about a requirement the special conditions sections is needed, please direct your question to the contracting officer for clarification.

· Drawing sheets will be provided to detail the mechanical room layout and wall cross-section of facility 325.

· We prefer that the water service lines enter buildings below grade; however, in the event this cannot be achieved, we will consider – on a case-by-case basis – allowing the new water service lines to penetrate the building exterior wall above grade. Any exposed water lines must be properly insulated and protected. For the purpose of preparing your technical volume, if the water service lines cannot enter facility 325 underground, assume that above-ground entry will be allowed.

b. Provide description of procedures, processes and methods for tracing the progress of the project and interface with the Government which addresses overall performance for both design phase and construction phase. Description shall include, but not limited to a discussion of the overall performance time for the design and construction phases, composition of the design-build team (including any major subcontractors) and their involvement throughout the process with particular attention to quality, timeliness, and cost control. Include a filled out Attachment 08, AF Form 3064, Contract Progress Schedule, and a Schedule of Values for the project.

c. Provide a listing of any and all assumptions made pertaining to the seed project.

F. VOLUME 2 – PAST PERFORMANCE

1. Early Proposal Information: Each offeror is requested to submit the past performance volume with past performance information for each relevant/recent contract at least seven (7) calendar days prior to the solicitation closing date. Failure to submit proposal information early will not result in offeror disqualification.

2. Format and Limitations (exclusive of questionnaires):

a. Three (3) Hard Copies

b. One (1) Electronic Copy

c. Page Limitation: Eight (8) pages per Past Performance Information Sheet (PPIS), unlimited for all else.

3. PPIS: Each offeror shall submit a past performance volume with its proposal, containing past performance information in accordance with the format contained in the PPIS (Attachment #01B of the Past Performance Packet). This information is required on the offeror proposed to perform the work outlined in the solicitation. Offerors are cautioned that the Government will use data provided by each offeror in this volume and data obtained from other sources in the evaluation of past performance. All past performance information shall be evaluated in accordance with the Past Performance factor as defined in Section M, Evaluation Criteria.

4. Consent and Client Authorization Letter: The offeror shall submit, along with the information required in this paragraph, a Consent Letter (Attachment #04 of the Past Performance Packet), executed by each joint venture partner (if applicable), authorizing release of adverse past performance information to the offeror so the offeror can respond to such information. For each identified effort for a commercial customer, the offeror shall also submit a Client Authorization Letter (Attachment #05 of the Past Performance Packet), authorizing release to the Government of requested information on the offeror’s performance.

5. Past Performance Questionnaire:

a. As soon as practicable, offerors shall complete Section 1 of the Past Performance Questionnaire (Attachment #01A of the Past Performance Packet) and e-mail it and the Performance Questionnaire Letter (Attachment #01 of the Past Performance Packet) to all points of contact (POCs) the offeror has listed in the Past Performance Information Sheet(s) (Attachment #01B). Past Performance Questionnaires must be received by 633 CONS/LGCB not later than 27 JULY 2011. The POCs will complete the questionnaires and forward them by FAX to 757-764-4071 or e-mail to delores.powell@langley.af.mil . RESPONDENTS TO THE QUESTIONNAIRES SHALL NOT SEND THE COMPLETED INFORMATION SHEETS BACK TO THE OFFEROR. Offerors shall follow-up with respondents to ensure they have completed the questionnaires.

b. Offerors shall submit information in accordance with Attachment #01B of the Past Performance Packet on at least three (3) but no more than six (6) RECENT contracts as the prime contractor considered most RELEVANT in demonstrating performance abilities on the proposed effort. Also, offerors shall include information, if applicable, on up to three (3) recent contracts performed by each joint venture or Teaming partner considered most relevant in demonstrating their ability to perform the proposed effort. Please refer to the Past Performance factor in Section M, Evaluation Criteria for definitions of what is considered recent work and what is considered relevant work. Each PPIS shall not exceed 8 pages. Offerors shall include rationale supporting the assertion of relevance. For a description of the characteristics or aspects the Government will consider in determining recency and relevancy, see Section M, Evaluation Criteria. NOTE: The requested number of PPIS forms for the prime and subcontractors are preferences, and not requirements. Offerors who submit less than the preferred number of PPIS forms are not automatically assigned an “Unknown Confidence” rating. Fewer numbers may be acceptable if the Government determines there is sufficient information to determine a confidence rating. There is no limit on the number of PPIS forms allowed per team; however, offerors are requested to limit responses to those efforts necessary for evaluation and that are relevant to this requirement.

6. Specific Content: Offerors shall provide a narrative explaining what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate. This may include a discussion of efforts accomplished by the offeror to resolve problems encountered on prior contracts as well as past efforts to identify and manage program risk. Merely having problems does not automatically equate to a little or no confidence rating, since the problems encountered may have been on a more complex program, or an offeror may have subsequently demonstrated the ability to overcome the problems encountered. The offeror shall clearly demonstrate management actions employed in overcoming problems and the effects of those actions, in terms of improvements achieved or problems rectified. This may allow the offeror to be considered a higher confidence candidate. For example, submittal of quality performance indicators or other management indicators that clearly support that an offeror has overcome past problems is required.

7. Organizational Structure Change History: Many companies have acquired, been acquired by, or otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc. These changes may have taken place during the time of performance of relevant past efforts or between the conclusion of recent past efforts and this source selection. As a result, it is sometimes difficult to determine what past performance is relevant to this acquisition. To facilitate this relevancy determination, offerors shall include a "roadmap" describing any/all such changes in their organization. A pamphlet or other commercial document describing such reorganizations may suffice. As part of this explanation, show how these changes impact the relevance of any efforts identified for past performance evaluation/ performance confidence assessment. Since the Government intends to consider past performance information provided by other sources as well as that provided by the offeror(s), the "roadmap" should be both specifically applicable to the efforts identified, yet general enough to apply to efforts on which the Government receives information from other sources.

G. VOLUME 3 – PRICE PROPOSAL

1. Format and Limitations:

a. Two (2) Hard Copies,

b. One (1) Electronic Copy

c. Page Limitation: Unlimited

2. These instructions are to assist offerors in submitting information that is required to evaluate reasonableness of proposed pricing and costs. Compliance with these instructions is mandatory and failure to comply may result in rejection of an offeror’s proposal.

a. Proposed Price: The offeror shall provide a price breakdown for the seed project by providing a completed Attachment #07, Construction Cost Breakdown, and Seed Project Bid Schedules. Offers should be complete, accurate, and sufficiently detailed to demonstrate their price reasonableness, reflect a clear understanding of the requirement, and be consistent with the offeror’s technical proposal. Evaluation of this area will be addressed in Section M under the Price Factor. The burden of proof for credibility of proposed pricing rests with the offeror.

b. Contract Documents: In addition, the offeror’s proposal shall include the following sections in the Price Proposal Volume from the solicitation:

(1) Section A - Solicitation/Contract Form SF 1442: Complete Form SF 1442 as applicable and sign and date. Signature by the offeror on the SF 1442 constitutes an offer, which the Government may accept. The "original" copy should be clearly marked under a separate cover sheet.

(2) Section I - Contract Clauses: Offeror shall complete and submit any applicable clause requiring information to be filled in.

(3) Section K – Representations and Certifications: Complete and submit this section in addition to completing On-Line Representations and Certifications and Application (ORCA) at http://www.bpn.gov/orca.

c. Other Information Required

(1) Executive Summary: Each offeror shall submit an Executive Summary as part of the price proposal of no more than 3 pages total which summarizes the key points from the offeror’s Technical, Past Performance, and Price areas. The Executive Summary Section is not included in the Volume 3 page limitation.

(2) Authorized Offeror Personnel: Offerors shall provide the following information.

(i) The name, title and telephone number(s) of the company/division point(s) of contact regarding decisions made with respect to the proposal and who can obligate the company contractually.

(ii) The name, title, and telephone number(s) of those individual(s) authorized to negotiate with the Government for this solicitation.

(iii) Company/Division Address, Identifying Codes, and Applicable Designations: Offerors shall provide company/division’s street address, county and facility code; CAGE Code; DUNS Number; and size of business (large, small, 8(a), etc.).

(3) Bank Reference: In order to assist in determining the offerors’ responsibility, offerors shall complete the highlighted areas of Attachment #02, Financial Information Request, provide it to their financial institution, and instruct them to complete and return it to the Contracting Office not later than the required proposal submission date.

(4) Bonding: In order to assist in determining the offerors’ responsibility, offerors shall complete the highlighted areas of Attachment #03, Bonding Information Request, provide it to their surety, and instruct them to complete and return it to the Contracting Office not later than the required proposal submission date.

(5) 8(a) verification from the cognizant Small Business Administration (SBA) office. SBA approved status in the 8(a) program is a prerequisite for award. Joint Venture (JV) relationships and Mentor/Protégé agreements require SBA approval prior to award. It is imperative that offerors intending to perform as a JV or under the Mentor/Protégé program submit verification of their status in the 8(a) program with, or as soon as possible after, submission of their proposal. Prior to award, the Government will notify potential awardees who have declared their intent to apply for SBA approval of a JV or Mentor/Protégé program that they must provide their approved agreement within three (3) calendar days of receipt of the notice. Such notice does not, in any way, imply that the Government will make award to any particular offeror. No award will be made to an entity who has not been approved by SBA in their 8(a) program.

H. EXCEPTIONS TO SOLICITATION REQUIREMENTS

Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation. This information shall be provided in the format and content of Table 1. Failure to comply with the terms and conditions of the solicitation may result in the Offeror being removed from consideration for award.

Table 1—Exceptions to Solicitation Requirements

SOLICITATION Document
Paragraph/Page
Requirement/Portion
Rationale
01010, Technical Specs, etc.
Applicable Page and Paragraph Numbers
Identify the requirement or portion to which exception is taken
State rationale for why the requirement cannot/will not be met

I. ALTERNATE PROPOSALS: Alternate proposals will not be accepted.

K. INCURRED EXPENSES: The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation. All contractors who are awarded a contract under the MACC solicitation will be awarded a task order to meet the minimum guaranteed amount at time of award at time of award (also see Section M, Paragraph H.2). The Government reserves the right to issue a task order for the seed project to the lowest priced successful offeror in lieu of a task order for the minimum guaranteed amount. NO OFFEROR WILL BE COMPENSATED FOR SUBMITTING A PROPOSAL.

(End of Provision) (End of Summary of Changes)