Attch 17 RFP Amend 03.docx

DOCX document 20 KB Posted

Attached to
Multiple Award Construction Contract (MACC) at Langley AFB/Ft Eustis AB, VA Federal contract opportunity
Solicitation number
FA4800-11-R-0002
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 17 RFP Amend 03

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC) at Langley AFB/Ft Eustis AB, VA, newest first.
File Type Posted
Attch 22 - 27 10 10 BUILDING TELECOMMUNICATIONS WIRING.docx DOCX document
Attch 24 - 28 31 66 Conventional System.docx DOCX document
Amendment 0005.doc DOC document
Attch 25 UFC 1-300-02 Unified Facilities Guide Specs.pdf PDF
QUESTIONS AND ANSWERS 320 -339.docx DOCX document
QUESTIONS AND ANSWERS 1-339.docx DOCX document
Attch 23 - 28 31 65 Addressable System.docx DOCX document
Attch 20 QUESTIONS AND ANSWERS 305 - 319.docx DOCX document
LAFB-Plans-35 -Submittal.dwg DWG drawing
Test-Hole-Locations.dwg DWG drawing
LAFB-Plans-35 -Submittal-Cover.dwg DWG drawing
TITLE BLOCK.dwg DWG drawing
Attch 20 QUESTIONS AND ANSWERS 284-304.docx DOCX document
Test-Hole-Locations.dwg DWG drawing
Bldg 366c.pdf PDF
Bldg 337b.pdf PDF
Bldg 325.pdf PDF
Bldg 366f.pdf PDF
Bldg 325a.pdf PDF
Bldg 338a.pdf PDF
bldg 338b.pdf PDF
Bldg 333.pdf PDF
bldg 366b.pdf PDF
Bldg 366e.pdf PDF
Bldg 337a.pdf PDF
Bldg 366g.pdf PDF
Bldg 338.pdf PDF
Bldg 366d.pdf PDF
Bldg 366.pdf PDF
SF 30 Amendment 0004.doc DOC document
Attch 17 RFP Amend 02.docx DOCX document
Attch 20 Question Answers Cont.docx DOCX document
AutoCAD 2000.zip ZIP file
Amend 0002 attachemnts.zip ZIP file
Amendment 0002.doc DOC document
Attch 11 Section 01 12 00.docx DOCX document
Attch 01B PastPeformanceInformationSheet.doc DOC document
Attch 14 Ft Eustis Specific Instructions.docx DOCX document
Attch 10 LAFB 01 06 00 Regulatory Requirements.docx DOCX document
Attch 09 LAFB Section 01 11 00 - 09Aug2010.docx DOCX document
Attch 08 AF 3064 Progress Sched.xfd —
Attch 07 AF 3052 Construction Cost Estimate.xls XLS spreadsheet
Attch 15 General Provisions for MACC.docx DOCX document
Attch 05 ClientAuthorizationLetter.doc DOC document
FA4800-11-R-0002 MACC Solicitation.doc DOC document
Attch 04 ConsentLetter.doc DOC document
Plans-PDF files.zip ZIP file
Attch 01A Past_Performance_Questionnaire.docx DOCX document
Attch 12 LAFB ETL 01-18 Fire Protection Engineering.pdf PDF
Attch 16 NAFI GENERAL PROVISIONS —
Show all 50

Multiple Award Construction Contract (MACC) at Langley AFB/Ft Eustis AB, VA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. FA4800-11-R-0002 Attachment 17

AMENDMENT 0005

REQUEST FOR PROPOSAL (RFP)

Langley/Eustis Multiple Award Construction Contract (MACC)

AMENDMENT 03

ISSUED BY: 633d Contracting Squadron/LGCB 04 October 2011 74 Nealy Avenue Joint Base Langley Eustis, VA 23665-2088

POINT OF CONTACT: Delores Powell (757)764-7228

PROJECT NUMBER: MUHJ 06-4088

PROJECT TITLE: : REPAIR WATER DISTRIBUTION SYSTEM AT LANGLEY AFB, VA

Purpose of this Amendment is to:

Change the submission of Proposals due date to 18 October 2011 at 1400 (2:00p.m.)

Correct ATTACHMENTS:

· General Decision Wage Determinatation to read VA100150, Mod1, dated 12/03/2010 (attached) as staten above in Wage Rates

· Incorporate 5 pdf Test Hole Location Drawings

General Decision Number: VA100150 12/03/2010 VA150

State: Virginia

Construction Types: Heavy (Heavy and Sewer and Water Line)

County: Hampton* County in Virginia.

*INDEPENDENT CITY

HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines)

Modification Number Publication Date 0 09/24/2010 1 12/03/2010

ASBE0085-001 05/01/2010

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR

Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems..........$ 22.48 9.49

* ELEC1340-007 12/01/2010

Rates Fringes

ELECTRICIAN......................$ 24.88 8.12

SUVA2010-048 09/03/2010

Rates Fringes

CARPENTER........................$ 21.57 3.74

CEMENT MASON/CONCRETE FINISHER...$ 19.00 3.83

IRONWORKER, REINFORCING..........$ 22.45 11.85

IRONWORKER, STRUCTURAL...........$ 20.55 8.25

LABORERS

Common or General...........$ 8.84 0.94 Flagger.....................$ 7.39 0.20 Landscape...................$ 10.00 Pipelayer...................$ 13.88 1.32

POWER EQUIPMENT OPERATOR:

Backhoe.....................$ 17.61 2.57 Bobcat/Skid Loader..........$ 11.40 Bulldozer...................$ 20.63 7.28 Crane (Tower)...............$ 23.29 6.02 Crane.......................$ 23.15 Excavator...................$ 19.27 7.28 Loader......................$ 18.27 3.46 Mechanic....................$ 26.78 6.32 Trackhoe....................$ 12.75 1.24 Tugboat.....................$ 19.00

TRUCK DRIVER: Boom Truck, Material Truck and Pickup Truck............................$ 13.42 2.39

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

MUHJ 06-4088 Page 1

RFP AMENDMENT 03

4 OCTOBER 2011