Attch 17 RFP Amend 03.docx
DOCX document 20 KB Posted
- Attached to
- Multiple Award Construction Contract (MACC) at Langley AFB/Ft Eustis AB, VA Federal contract opportunity
- Solicitation number
- FA4800-11-R-0002
About this file
Attachment 17 RFP Amend 03
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) at Langley AFB/Ft Eustis AB, VA has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. FA4800-11-R-0002 Attachment 17
AMENDMENT 0005
REQUEST FOR PROPOSAL (RFP)
Langley/Eustis Multiple Award Construction Contract (MACC)
AMENDMENT 03
ISSUED BY: 633d Contracting Squadron/LGCB 04 October 2011 74 Nealy Avenue Joint Base Langley Eustis, VA 23665-2088
POINT OF CONTACT: Delores Powell (757)764-7228
PROJECT NUMBER: MUHJ 06-4088
PROJECT TITLE: : REPAIR WATER DISTRIBUTION SYSTEM AT LANGLEY AFB, VA
Purpose of this Amendment is to:
Change the submission of Proposals due date to 18 October 2011 at 1400 (2:00p.m.)
Correct ATTACHMENTS:
· General Decision Wage Determinatation to read VA100150, Mod1, dated 12/03/2010 (attached) as staten above in Wage Rates
· Incorporate 5 pdf Test Hole Location Drawings
General Decision Number: VA100150 12/03/2010 VA150
State: Virginia
Construction Types: Heavy (Heavy and Sewer and Water Line)
County: Hampton* County in Virginia.
*INDEPENDENT CITY
HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines)
Modification Number Publication Date 0 09/24/2010 1 12/03/2010
ASBE0085-001 05/01/2010
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems..........$ 22.48 9.49
* ELEC1340-007 12/01/2010
Rates Fringes
ELECTRICIAN......................$ 24.88 8.12
SUVA2010-048 09/03/2010
Rates Fringes
CARPENTER........................$ 21.57 3.74
CEMENT MASON/CONCRETE FINISHER...$ 19.00 3.83
IRONWORKER, REINFORCING..........$ 22.45 11.85
IRONWORKER, STRUCTURAL...........$ 20.55 8.25
LABORERS
Common or General...........$ 8.84 0.94 Flagger.....................$ 7.39 0.20 Landscape...................$ 10.00 Pipelayer...................$ 13.88 1.32
POWER EQUIPMENT OPERATOR:
Backhoe.....................$ 17.61 2.57 Bobcat/Skid Loader..........$ 11.40 Bulldozer...................$ 20.63 7.28 Crane (Tower)...............$ 23.29 6.02 Crane.......................$ 23.15 Excavator...................$ 19.27 7.28 Loader......................$ 18.27 3.46 Mechanic....................$ 26.78 6.32 Trackhoe....................$ 12.75 1.24 Tugboat.....................$ 19.00
TRUCK DRIVER: Boom Truck, Material Truck and Pickup Truck............................$ 13.42 2.39
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
MUHJ 06-4088 Page 1
RFP AMENDMENT 03
4 OCTOBER 2011
File details come from the government source that posted it. Updated .