Attch 17 RFP Amend 02.docx

DOCX document 20 KB Posted

Attached to
Multiple Award Construction Contract (MACC) at Langley AFB/Ft Eustis AB, VA Federal contract opportunity
Solicitation number
FA4800-11-R-0002
Issued by
Department of the Air Force Air Combat Command

About this file

Attch 17 Amendment 02 to RFP Seed Project

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC) at Langley AFB/Ft Eustis AB, VA, newest first.
File Type Posted
Attch 22 - 27 10 10 BUILDING TELECOMMUNICATIONS WIRING.docx DOCX document
QUESTIONS AND ANSWERS 1-339.docx DOCX document
Attch 23 - 28 31 65 Addressable System.docx DOCX document
Test Hole Locations pdf.zip ZIP file
Attch 17 RFP Amend 03.docx DOCX document
Attch 24 - 28 31 66 Conventional System.docx DOCX document
Amendment 0005.doc DOC document
Attch 20 QUESTIONS AND ANSWERS 305 - 319.docx DOCX document
TITLE BLOCK.dwg DWG drawing
BASE-H09125H-01SNew.dwg DWG drawing
LAFB-Plans-35 -Submittal.dwg DWG drawing
Test-Hole-Locations.dwg DWG drawing
Attch 20 QUESTIONS AND ANSWERS 284-304.docx DOCX document
Test-Hole-Locations.dwg DWG drawing
Bldg 366c.pdf PDF
Bldg 337b.pdf PDF
Bldg 325.pdf PDF
Bldg 366f.pdf PDF
Bldg 366e.pdf PDF
Bldg 337a.pdf PDF
Bldg 366g.pdf PDF
Bldg 338.pdf PDF
Bldg 366d.pdf PDF
Bldg 366.pdf PDF
Bldg 333a.pdf PDF
Bldg 366a.pdf PDF
Bldg 337.pdf PDF
Bldg 325a.pdf PDF
Bldg 338a.pdf PDF
SF 30 Amendment 0004.doc DOC document
Attch 20 Question Answers Cont.docx DOCX document
Amend 0002 attachemnts.zip ZIP file
Amendment 0002.doc DOC document
Amendment 0001.pdf PDF
Attch 11 Section 01 12 00.docx DOCX document
Attch 01B PastPeformanceInformationSheet.doc DOC document
Attch 14 Ft Eustis Specific Instructions.docx DOCX document
Attch 10 LAFB 01 06 00 Regulatory Requirements.docx DOCX document
Attch 09 LAFB Section 01 11 00 - 09Aug2010.docx DOCX document
Attch 04 ConsentLetter.doc DOC document
Plans-PDF files.zip ZIP file
Attch 01A Past_Performance_Questionnaire.docx DOCX document
Attch 12 LAFB ETL 01-18 Fire Protection Engineering.pdf PDF
Attch 16 NAFI GENERAL PROVISIONS —
Attch 13 LAFB PremisesDistributionSpecs - Revised June10.docx DOCX document
Attch 06 Teaming List.doc DOC document
RFP Design Build SoW 06-4088.docx DOCX document
Attch 02 Financial_Information_Request.docx DOCX document
Attch 03 Bonding_Information_Request.docx DOCX document
Attch 08 AF 3064 Progress Sched.xfd —
Show all 50

Multiple Award Construction Contract (MACC) at Langley AFB/Ft Eustis AB, VA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. FA4800-11-R-0002 Attachment 17

AMENDMENT 0004

TASK ORDER PROPOSAL REQUEST (TOPR)

Langley/Eustis Multiple Award Construction Contract (MACC)

AMENDMENT 02

ISSUED BY: 633d Contracting Squadron/LGCB 9 September 2011 74 Nealy Avenue Joint Base Langley Eustis, VA 23665-2088

POINT OF CONTACT: Delores Powell (757)764-7228

PROJECT NUMBER: MUHJ 06-4088

PROJECT TITLE: : REPAIR WATER DISTRIBUTION SYSTEM AT LANGLEY AFB, VA

Purpose of this amendment is to:

· Change the 90% Design to address work described on Drawing Sheet 3 and any other drawing sheets that relate to the work described on Sheet 3 that are applicable to the extent that they relate to this work .

· Change the Submission of Proposals to read: 90% Design and Price Proposals are due to the Contracting Office on 06 October 2011 at 2:00pm

· Incorporate Detailed Foundation Drawings for building 325, 333, 337, 338 and 366

Incorporate the following changes to the project documentation:

The contractor shall provide a submittal package consistent with a 90 percent design that addresses the work described on drawing sheet 3. Any other drawing sheets that relate to the work described on sheet 3 are applicable to the extent that they relate to this work.

· The work detailed on drawing sheet 3 consists of water distribution work at facilities 325, 326, 327, 328 and 329 and removal of one fire hydrant.

· Item 4 in the RFP Amendment 01 (12 August 2011), requiring the water service to be connected at the first valve in the mechanical room at 325, applies. Evaluate and include design for bid option 1, applicable to facility 325.

· Provide marked-up specification sections listed in RFP Amendment 01 (12 August 2011), that apply to the work described on drawing sheet 3 (and other applicable drawing sheets). [Providing marked-up sections (versus fully-edited sections) will allow the reviewers of the technical proposal to better identify choices and decisions the designer makes in editing the sections.]

· For the purpose of the preparation of the technical volume, the appropriate requirements contained in sections 01 06 00, 01 11 00 and 01 12 00 apply. A working knowledge of Langley AFB is needed in order to effectively edit these sections; it is not our intent to penalize a designer who may be less familiar with Langley AFB. It is not necessary to edit these three sections for your technical volume.

CLARIFICATION: The Langley AFB Special Conditions Sections 01 11 00 and 01 12 00, provided in the solicitation package, are unedited boiler-plate specifications sections that addresses issues unique to Langley AFB. The surveys and drawing format described in paragraph 1.24 of section 01 11 00 describe how these are to be performed and provided when they are required in execution of a project. These and other items are not required in each and every project. Surveys, topographic mapping and many other items contained in the special conditions will not apply to this project. If guidance about a requirement the special conditions sections is needed, please direct your question to the contracting officer for clarification.

· Drawing sheets will be provided to detail the mechanical room layout and wall cross-section of facility 325.

· We prefer that the water service lines enter buildings below grade; however, in the event this cannot be achieved, we will consider – on a case-by-case basis – allowing the new water service lines to penetrate the building exterior wall above grade. Any exposed water lines must be properly insulated and protected. For the purpose of preparing your technical volume, if the water service lines cannot enter facility 325 underground, assume that above-ground entry will be allowed.

NOTE: Contractor’s price proposals are to reflect the entire project.

RFP AMENDMENT 02

9 October 2011

File details come from the government source that posted it. Updated .