Attachment 5-B1319 Floorplan-Corrected.pdf
PDF 89 KB Posted
- Attached to
- B1319 Carpet, Asbestos, Furniture
- Solicitation number
- FA468625QS001
About this file
This is a floor plan document for Building 1319 showing carpet removal and asbestos abatement work to be performed as part of ACC Phase II. The document depicts a detailed architectural layout with room divisions and specific work area designations.
The scope of work includes two main activities: areas marked in green indicate locations for both carpet removal and installation of new carpet plus asbestos abatement, while Room 7 (marked in pink) requires only carpet removal and asbestos abatement without new carpet installation. Several areas throughout the building are specifically marked as "Don't Carpet," including bathroom facilities, indicating these spaces will not receive carpet treatment. The floor plan includes dimensional measurements and grid references (A-H horizontally, 1-6 vertically) for precise location identification of work areas.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B L
D G
F
L O
O R
P
L A
N
A C
C P
H A
S E
I I
Remove and Install New Carpet and Asbestos Abatement
Room 7: Remove Carpet and Asbestos Abatement Only
Don't Carpet Don't Carpet
Don't Carpet
Bathroom Don't Carpet
1254153113C Rectangle
1254153113C Rectangle
1254153113C Rectangle
1254153113C Rectangle
1254153113C Rectangle
1254153113C Rectangle
1254153113C Rectangle