This document is a Statement of Need (SON) for a carpet replacement, asbestos abatement, and furniture moving project at Building 1319 on Beale Air Force Base. The project requires the contractor to replace existing carpet with 24"x24" carpet tiles from approved manufacturers like J+J Flooring Group, Interface Americas, Mohawk, Mannington, Tarkett, Milliken, and Bentley Mills, covering approximately 307 square yards with 4" cove base. The contractor must follow the Air Force Carpet II Ordering Guide, which prohibits markup on Tier I contract materials.

Key responsibilities include furniture removal and storage for the 2,760 sq ft area, asbestos containing material (ACM) abatement, and preparing the concrete subfloor for new carpet installation. The contractor must submit an asbestos abatement plan, obtain necessary certifications, remove and dispose of ACM debris, provide air clearance sample results, and submit NESHAP notifications to the EPA at least 10 business days before starting work. The project is set aside for a Woman Owned Small Business Concern under NAICS code 238990, with a small business size standard of $19M. Quotes are due by 11 July 2025 at 10:00 AM PST, with work to be performed at Beale Air Force Base in California.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 9TH RECONNAISSANCE WING (ACC)

BEALE AIR FORCE BASE, CALIFORNIA

9 June 2025

MEMORANDUM FOR 9 CONS

FROM: 9 CES/CEOER

SUBJECT: B1319 Replace Carpet, Asbestos Abatement, Furniture Move - Statement of Need (SON)

A. General Scope. The Contractor shall furnish all supervision, labor, tools, equipment, materials, operations, incidentals, and deliverables as required to do the following at building 1319:

Carpet and Cove Base

• Replace the existing carpet with new carpet tiles and cove base in all existing carpeted areas except for areas with existing tiles and concrete.

• Compliance is mandatory to follow ordering procedures outlined in the Air Force Carpet II Ordering Guide. Per the guide, Contractors are required to contact the Tier I Contractors for material quotes and orders. NOTE: Contractor mark-up/profits are not allowable on items purchase via Tier I contracts.

Carpet Selection 24”x24” Carpet Tile

Carpet Material J+J Flooring Group: Knit 2711, Boucle 3081 Collection

Interface Americas: After Dark 105704 Night Flight Collection

Mohawk: BT437 Shaded Lines Tile Page 4, 979 Pencil Lead

Mannington: Acorn 84334 Entwined Collection

Tarkett: Cedar Deck 36205 Fabricate Collection

Milliken: Empire DES174 City Proper Collection

Bentley Mills: Backstage 8BC200AA1K 4GS-T

Square Yards 307

Cove Base Material 4” size

Linear Feet 720

Number of Corners None

Tier I Contractors:

Company Point of Contact Phone Email

Mohawk Annaleigh Warmack 706-459-4965 Annaleigh_warmack@mohawkind.com

Engineered Floors Debra Ramsay 800-241-4585 Contract.team@engineeredfloors.com

Mannington Jody Steger 703-489-5698 Jody.steger@manninton.com

Tarkett Jamie Collins 757-810-8893 Jamie.collins@tarkett.com

Milliken Timothy Bagg 704-617-1329 Timothy.bagg@milliken.com

Interface Americas Interface Customer Success

800-634-6032 orders@interface.com

Bentley Mills Carolyn Drummond 859-536-7846 Carolyn.drummond@bentleymills.com

Furniture Removal and Storage

1. Due to the installation of the new carpet in building 1319, the Contractor is responsible for moving furniture to a storage area and then back into the office once the carpet installation is complete. The Contractor shall move all furniture (tables, filing cabinets, chairs, paper shredders, etc.) and all items on the walls in all office areas and rooms with old carpet. The combined area is approximately 2,760 sq ft. All furniture shall be placed in their original positions. Any fixed/immovable items shall be covered/protected by the Contractor to avoid asbestos containing material (ACM) exposure.

2. The government (user) shall remove all personal items and any government issued items/workstation electronics (phones, monitors, laptops, etc.) as well. Any fixed/immovable items shall be covered/protected by the Contractor to avoid ACM exposure.

3. Storage. The Contractor must provide a storage solution and placement for the furniture, as agreed by the user.

4. The period of performance is highly dependent on the timeline of carpet installation and asbestos abatement.

Asbestos Abatement and Submittals

• Remove ACM in all offices and rooms with existing carpet except for areas with existing tiles and concrete.

• Prep concrete subfloor to ensure ACM is removed and new carpet tiles adhere to it. Grinding may be required if the underlying material is not easily removed.

mailto:Contract.team@engineeredfloors.com mailto:Jody.steger@manninton.com mailto:Jamie.collins@tarkett.com mailto:orders@interface.com

• Submit an Asbestos Abatement plan with applicable asbestos worker/abatement certifications.

• Remove all debris/waste/ACM materials identified in the asbestos report and dispose per abatement plan.

• Asbestos air clearance sample results, performed under direct supervision of a third-party California-certified asbestos consultant.

• Submit to the United States Environmental Protection Agency (U.S. EPA) written NESHAP notification of regulated asbestos renovation activities, at least 10 business days before starting renovation or demolition work. A signed copy of the notification form shall be submitted to U.S.

EPA at the address below:

US EPA Pacific Southwest, Region 9 75 Hawthorne St.

San Francisco, CA 94105

There is no fee associated with submitting an Asbestos Notification Form to U.S. EPA. Contractor shall submit a copy of the notification submittal to 9 CES/CEIE (Environmental) Air Quality/Toxics Program Manager, Susan Stewart, at susan.stewart.7@us.af.mil.

• Submit a hazardous waste manifest to 9 CES/CEIE Environmental Manager, Eric Maresh, at eric.maresh.3@us.af.mil.

• The Contractor shall also adhere and comply with the following:

o All applicable Federal, State, and local regulations prior to and during commencement of work to include 29 CFR Part 1910.1001, 29 CFR Part 1926.1101, 40 CFR Part 763, subpart E, 15 USC Chapter 53, and 40 CFR Part 61, subpart M, prescribe requirements for identifying, monitoring, removal and disposal of asbestos containing materials (ACM), notifying building occupants of potential asbestos-related hazards, and acquiring specialized asbestos-related training.

o State regulations Cal OSHA Construction Safety Orders—(Title 8 CCR, Ch 4, Subchapter 4, Article 4, Section 1529) and Environmental Health Standards for Management of Hazardous Waste—(Title 22 CCR, Social Security, Division 4.5

B. Access. The Contractor Manager or alternate shall complete an entry authorization list (EAL) for access to Beale Air Force Base. The request shall be submitted within two (2) weeks of delivery to Pass and Registration via the Government Point of Contact (POC) identified in the inspect and accept information section of the contract. All contractor vehicles must enter the base via Wheatland Gate and shall be subject to inspection. All contractor personnel must obtain base passes or be listed on the Entry Access List (EAL) throughout duration of work performance. Any persons in the EAL are required to bring two (2) forms of identification or REAL ID to access the base.

C. Hours of Operation. All work shall be accomplished between the hours of 0700- 1600, Monday through Friday.

D. Federal Holidays. ACC follows the established Federal Government schedule for holidays provided during each work year. The holidays recognized by the Federal Government are:

New Years Day 1 January

Martin Luther King Day 3rd Monday in January mailto:susan.stewart.7@us.af.mil mailto:eric.maresh.3@us.af.mil https://www.dir.ca.gov/Title8/1529.html https://www.dir.ca.gov/Title8/1529.html https://govt.westlaw.com/calregs/Browse/Home/California/CaliforniaCodeofRegulations?guid=I81CB6A705B6111EC9451000D3A7C4BC3&originationContext=documenttoc&transitionType=Default&contextData=(sc.Default)&bhcp=1

Washington’s Birthday 3rd Monday in February

Memorial Day Last Monday in May

Juneteenth 19 June

Independence Day 4 July

Labor Day 1st Monday in September

Columbus Day 2nd Monday in October

Veterans Day 11 November

Thanksgiving Day 4th Thursday in November

Christmas Day 25 December

If these Holidays fall on Saturday, the preceding Friday will be observed. If these Holidays fall on Sunday, the following Monday will be observed.

Any other day designated by Federal Statute Any other day designated by Executive Order Any other day designated by the President’s Proclamation

Down-days. (i.e., Family Day) declared by the AETC Commander are considered duty days and are not included in the definition of a holiday.

E. Administrative Days. The Wing Commander may order a base closure due to weather or other unforeseen circumstances. Contractor employees shall not report to work if the base is closed, but work shall be accomplished as soon as possible after reopening the base.

F. Work Items. The contractor shall comply with all applicable Federal, State, and local NEC construction standards. Current Air Force Occupational Safety and Health (AFOSH) standards and COVID-19 safety regulations also apply.

The Contractor shall comply with IAW all NFPA, AFI, UFC and ETL standards for fire safety.

All waste material is to be removed off base by the contractor. The Contractor will practice good housekeeping during the project.

Attachments:

1. Attachment 1-Photos

2. Attachment 2- As-builts

Room Photos

As- Builts

B1319 Asbestos Removal and Carpet Replacement - SON WC.pdf
Carpet and Cove Base
Tier I Contractors:
Email
Phone
Point of Contact
Company
Annaleigh_warmack@mohawkind.com
706-459-4965
Annaleigh Warmack
Mohawk
Contract.team@engineeredfloors.com
800-241-4585
Debra Ramsay
Engineered Floors
Jody.steger@manninton.com
703-489-5698
Jody Steger
Mannington
Jamie.collins@tarkett.com
757-810-8893
Jamie Collins
Tarkett
Timothy.bagg@milliken.com
704-617-1329
Timothy Bagg
Milliken
orders@interface.com
800-634-6032
Interface Customer Success
Interface Americas
Carolyn.drummond@bentleymills.com
859-536-7846
Carolyn Drummond
Bentley Mills
Furniture Removal and Storage
Asbestos Abatement and Submittals
MUNS.pdf
Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7

File details come from the government source that posted it. Updated .