This document is a Statement of Need (SON) from the Department of the Air Force Headquarters 9th Reconnaissance Wing (ACC) at Beale Air Force Base, California. The SON outlines the requirement to replace the chiller servicing the Child Development Center, Building 2443. The key details are:
The contractor shall furnish all necessary labor, materials, and equipment to replace the existing 125.3-ton York chiller with a new 125-ton Trane chiller. This will include demolition of the existing chiller, installation of new chilled water supply and return piping, and connection to the building's Siemens control system. The work must be accomplished between 7:00 AM and 5:00 PM, Monday through Friday. All contractor personnel and vehicles must access the base through the Wheatland Gate and comply with base security requirements. The government will remove and return any items/equipment in the vicinity of the work area. The contractor must comply with all applicable federal, state, local, and Air Force safety standards and regulations.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS 9TH RECONNAISSANCE WING (ACC)
BEALE AIR FORCE BASE, CALIFORNIA
09 FEB 2023
MEMORANDUM FOR 9 CONS
FROM: 9 CES/CEOER
SUBJECT: B2443 – Replace CDC Chiller - Statement of Need (SON)
A. General Scope. The contractor shall furnish all supervision, labor, tools, equipment, materials, operations and incidentals as required to repair by replacement, the chiller servicing the Child Development Center, B2443. The new chiller will be a like for like replacement. This project will also include replacement of the chilled water supply and return piping between the chiller and adjacent wall.
1. Purchase new 125 Ton Chiller Unit (Trane), installed in current location
2. Demolish and remove the existing 125.3-ton York chiller.
3. Fabricate and install piping to existing chill water system using galvanized 3” piping and ball valve.
4. Make all necessary electrical connections and control connects with Siemens control system.
5. Test and ensure proper functioning and communication of chiller with building Siemens system
B. Existing Conditions:
· Currently the Child Development Center (CDC) is cooled by a York 125.3-ton air-cooled scroll chiller. Because of issues with the chiller it has been earmarked for replacement with a Trane chiller. The existing chiller is in a walled-in, screen-covered enclosure on the southeast corner of the building. The enclosure CMU wall is 113” tall, and the chiller area is 248” wide and 304” long. From the floor to the bottom of the rectangular steel tubes is 103”. There are 5 of the steel tubes supporting the screen above the chiller. The chiller is sitting on a concrete equipment pad (194.25” long by 101” wide, and 5” tall) within the enclosed chiller area. This pad is 40” from the door and 66” from the outside CMU wall.
· This chiller is connected to power (480V,3p, 60Hz), a fire alarm panel, and a Siemens control panel in the nearby electrical room (marked as “ELEC” in Fig. 3).
Figure 1 - 125.3 Ton York Chiller
Figure 2 - Chiller Data Plate
Figure 3 - Location of Chiller SE Corner
C. Authorized Work. Work shall be accomplished in accordance with all contractually incorporated documents. Any work that is accomplished outside of the contractual documents, unless authorized by a contracting officer, is accomplished at the contractors own risk.
D. All work shall be accomplished between 0700-1700 Mon-Fri.
E. All contractor vehicles must enter the base via the Wheatland Gate and shall be subject to inspection. All contractor personnel must obtain base passes, or be listed on the Entry Access List (EAL) throughout duration of work performance. Any persons in the EAL is required to bring two (2) forms of identification or REAL ID in order to access the base.
F. The Government will remove any items/equipment that will be in its vicinity in preparation for these doors to be replaced, and will return any items/equipment after work is complete.
II. WORK ITEMS:
The contractor shall comply with all applicable Federal, State and local NEC construction standards. Current Air Force Occupational Safety and Health (AFOSH) standards and COVID-19 safety regulations also apply.
Contractor shall be in compliance IAW all NFPA, AFI, UFC and ETL standards for fire safety.
All metal and equipment recycling will be disposed of on base to the 9 CES Recycle yard, POC: Tony Rojas at 530-634-4452 or antonio.rojas@us.af.mil. All other waste material is to be removed off base by the Contractor, POC: Shane Morris at 530-634-0744 or shane.morris.5@us.af.mil. Contractor will practice good housekeeping during the project.