15. AF 3064 Progress Schedule.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- Oroville Radar HVAC & Bldg 24177, 24176 & 2443 Chiller Replacement, CDC Chiller Replacement
- Solicitation number
- FA468624R0014
About this file
This document is an AF Form 3064, which is a Contract Progress Schedule. It provides a template for contractors to report on the progress of a contract, including the percentage of work completed for various elements and the actual start and completion dates.
The related federal contract opportunity is for the Oroville Radar HVAC & Bldg 24177 and 24176 Chiller Replacement project at Beale AFB. The work involves demolition and disposal of two HVAC systems, and replacement with newer Trane HVAC systems. The estimated value of the contract is $300,000 to $500,000, with a NAICS code of 236220 for Commercial and Institutional Building Construction. Site visits are scheduled for May 9 and May 10, 2024, with RFIs due on May 15, 2024, and proposals due on May 31, 2024. The contract will be awarded by the Department of the Air Force Air Combat Command.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| 0 | ||||||||
| CONTRACT PROGRESS SCHEDULE | Form Approved OMB NO. 0704-0188 | |||||||
| Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintianing the data needed, and completing and reviewing the collection of information. Send comments regarding this burden or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Heaquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No. 9000-0058, Washington DC 20503. Please DO NOT RETURN your form to either of thes addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000. | ||||||||
| 1. CONTRACT NO. | 8. PROJECT TITLE | 10. APPROVAL RECOMMENDED BY: | ||||||
| DATE SIGNED | INSTALLATION ENGINEER'S SIGNATURE | |||||||
| 2. START DATE | ||||||||
| 3. COMPLETION DATE | 9. SUBMITTED BY: | |||||||
| 4. PURCHASE REQUEST NO. | DATE SIGNED | CONTRACTOR'S NAME (Last, First, Middle Initial) Address (Street, City, State, Zip Code) | CONTRACTOR'S SIGNATURE | 11. APPROVED BY: | ||||
| 5. PROJECT NO. | DATE SIGNED | CONTRACTING OFFICER'S SIGNATURE | ||||||
| 6. ACTUAL START DATE | ||||||||
| 7. ACTUAL COMPLETION DATE | ||||||||
| LINE NO. | WORK ELEMENTS | % | WEEKS |
1 SUBCONTRACTOR SELECTION MATERIAL SUBMITTAL
8 FINAL CLEANUP AND PROJECT CLOSEOUT
100% 100%
90% 90%
80% 80%
70% 70%
60% 60%
50% 50%
40% 40%
30% 30%
20% 20%
10% 10%
0% 0%
| SCHEDULED PROGRESS COMPLETED THIS PERIOD: SCHEDULED PROGRESS COMPLETED CUMULATIVE: | 100% | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| ACTUAL PROGRESS COMPLETED: |
&"Arial,Bold"&14AF FORM 3064, JUN 90
Sheet2
Sheet3
File details come from the government source that posted it. Updated .