21. CLIN 0003 B2443 - CDC Replace Chiller - SON.docx

DOCX document 3 MB Posted

Attached to
Oroville Radar HVAC & Bldg 24177, 24176 & 2443 Chiller Replacement, CDC Chiller Replacement
Solicitation number
FA468624R0014
Issued by

About this file

This document is a Statement of Need (SON) for the replacement of a 125.3-ton chiller unit at the Child Development Center (CDC) located at Beale Air Force Base. The scope of work includes the purchase and installation of a new 125-ton Trane chiller, demolition and removal of the existing York chiller, installation of new piping and electrical/control connections, and testing to ensure proper functionality. The chiller is located in an enclosed and screened area on the southeast corner of the CDC building. This work will be accomplished in accordance with all applicable federal, state, and local construction standards, as well as Air Force safety regulations. All work must be performed between 0700-1700 Monday-Friday, and contractor personnel and vehicles must comply with base access requirements.

The associated federal contract opportunity is Solicitation Number FA468624R0014 for the "Oroville Radar HVAC & B24177, B24176 Chiller Replacement" project at Beale AFB. This requirement is for the demolition and disposal of two separate HVAC systems and the replacement and installation of newer Trane HVAC systems. The estimated contract value is between $300K - $500K. Site visits are scheduled for May 9 and 10, 2024, requests for information are due by May 15, 2024, and proposals are due by May 31, 2024.

View the file

Other files

File Type Posted
Solicitation Amendment - FA468624R00140006.pdf PDF
Solicitation Amendment FA468624R00140006 SF 30.pdf PDF
13. Bid Schedule, FA468624R0014.docx DOCX document
22. Past Performance Questionnaire.pdf PDF
20. Section M, FA468624R0014.docx DOCX document
19. Section L, FA468624R0014.docx DOCX document
0. Solicitation Amendment FA468624R00140005 SF 30.pdf PDF
0. Solicitation Amendment - FA468624R00140005.pdf PDF
23. RFI_HVAC Projects_FA468624R0014 Version 2.docx DOCX document
1. CLIN 0001 Statement of Work (BAEY240008) - Rev2.docx DOCX document
0. Solicitation Amendment FA468624R00140004 SF 30.pdf PDF
0. Solicitation Amendment - FA468624R00140004.pdf PDF
1. CLIN 0001 Statement of Work (BAEY240008) - Rev1 .docx DOCX document
23. RFI_HVAC Projects_FA468624R0014.docx DOCX document
Tab 22 - Past Performance Questionnaire.pdf PDF
0. Site Visit - sign-in sheet - 10 May 24.pdf PDF
0. Solicitation Amendment FA468624R00140003 SF 30.pdf PDF
0. Solicitation Amendment - FA468624R00140003.pdf PDF
21. CLIN 0003 Statement of Need.docx DOCX document
Solicitation Amendment - FA468624R00140002.pdf PDF
Solicitation Amendment FA468624R00140002 SF 30.pdf PDF
Solicitation Amendment - FA468624R00140001.pdf PDF
Solicitation Amendment FA468624R00140001 SF 30.pdf PDF
13. Bid Schedule.docx DOCX document
15. AF 3064 Progress Schedule.xlsx XLSX spreadsheet
Solicitation - FA468624R0014.pdf PDF
7. CLIN 0001 - AFCOMAC FY24 Schedule.pdf PDF
11. CLIN 0002 - Environmental Approval (CATEX A2.3.9).pdf PDF
2. CLIN 0001 - Location Map.pdf PDF
14. AF66 Submittal schedule.xlsx XLSX spreadsheet
17. Hold Harmless Agreement.docx DOCX document
4. CLIN 0001 - Environmental Appendix A.pdf PDF
12. CLIN 0002 - Environmental Appendix A.pdf PDF
19. Section L, FA468624R0014 (1 May 2024).docx DOCX document
6. CLIN 0001 - As-Builts.pdf PDF
18. Wage determination - CA20240007.pdf PDF
5. CLIN 0001 - Chiller Nameplate Information.pdf PDF
8. CLIN 0002 Statement of Work (BAEY240007).docx DOCX document
20. Section M, FA468624R0014 (1 May 2024).docx DOCX document
3. CLIN 0001 - Environmental Approval (CATEX A2.3.9).pdf PDF
10. CLIN 0002 - Location Map.pdf PDF
16. CONTRACTOR EAL 2024.xlsx XLSX spreadsheet
9. CLIN 0002 - Nameplate Information.pdf PDF
1. CLIN 0001 Statement of Work (BAEY240008).docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 9TH RECONNAISSANCE WING (ACC)

BEALE AIR FORCE BASE, CALIFORNIA

09 May 2024

MEMORANDUM FOR 9 CONS

FROM: 9 CES/CEOER

SUBJECT: B2443 – Replace CDC Chiller - Statement of Need (SON)

A. General Scope. The contractor shall furnish all supervision, labor, tools, equipment, materials, operations and incidentals as required to repair by replacement, the chiller servicing the Child Development Center, B2443. The new chiller will be a like for like replacement. This project will also include replacement of the chilled water supply and return piping between the chiller and adjacent wall.

1. Purchase new 125 Ton Chiller Unit (Trane), installed in current location

2. Demolish and remove the existing 125.3-ton York chiller.

3. Fabricate and install piping to existing chill water system using galvanized 3” piping and ball valve.

4. Make all necessary electrical connections and control connects with Siemens control system.

5. Test and ensure proper functioning and communication of chiller with building Siemens system

B. Existing Conditions:

· Currently the Child Development Center (CDC) is cooled by a York 125.3-ton air-cooled scroll chiller. Because of issues with the chiller it has been earmarked for replacement with a Trane chiller. The existing chiller is in a walled-in, screen-covered enclosure on the southeast corner of the building. The enclosure CMU wall is 113” tall, and the chiller area is 248” wide and 304” long. From the floor to the bottom of the rectangular steel tubes is 103”. There are 5 of the steel tubes supporting the screen above the chiller. The chiller is sitting on a concrete equipment pad (194.25” long by 101” wide, and 5” tall) within the enclosed chiller area. This pad is 40” from the door and 66” from the outside CMU wall.

· This chiller is connected to power (480V,3p, 60Hz), a fire alarm panel, and a Siemens control panel in the nearby electrical room (marked as “ELEC” in Fig. 3).

Figure 1 - 125.3 Ton York Chiller

Figure 2 - Chiller Data Plate

Figure 3 - Location of Chiller SE Corner

C. Authorized Work. Work shall be accomplished in accordance with all contractually incorporated documents. Any work that is accomplished outside of the contractual documents, unless authorized by a contracting officer, is accomplished at the contractors own risk.

D. All work shall be accomplished between 0700-1700 Mon-Fri.

E. All contractor vehicles must enter the base via the Wheatland Gate and shall be subject to inspection. All contractor personnel must obtain base passes, or be listed on the Entry Access List (EAL) throughout duration of work performance. Any persons in the EAL is required to bring two (2) forms of identification or REAL ID in order to access the base.

F. The Government will remove any items/equipment that will be in its vicinity in preparation for these doors to be replaced, and will return any items/equipment after work is complete.

II. WORK ITEMS:

The contractor shall comply with all applicable Federal, State and local NEC construction standards. Current Air Force Occupational Safety and Health (AFOSH) standards and COVID-19 safety regulations also apply.

Contractor shall be in compliance IAW all NFPA, AFI, UFC and ETL standards for fire safety.

All metal and equipment recycling will be disposed of on base to the 9 CES Recycle yard, coordination with the assigned 9 CES project manager will be required to access the recycling yard. Coordination with the assigned 9 CES Project Manager will also need to be accomplished to dispose of any materials off base. Contractor will practice good housekeeping during the project.

MIGUEL RODRIGUEZ, CIV, USAF

Facilities AMP image1.png image2.png image3.png image4.wmf

File details come from the government source that posted it. Updated .