About this file
From the source
Drawing: Existing Sprinkler As-Builts (Dated 12/16/16)
Other files for this federal contract opportunity
Other files attached to Grand Forks Air Force Base Multiple Award Task Order Contract (MATOC), newest first.
| File |
Type |
Posted |
| Amendment_0003.pdf |
PDF |
|
| MATOC_questions_21-27.pdf |
PDF |
|
| Amendment_0002.pdf |
PDF |
|
| MATOC_Questions_12-20.pdf |
PDF |
|
| ppi_tool.accdb |
— |
|
| site_visit_memorandum.doc |
DOC document |
|
| MATOC_site_Visit_sign_in_sheet_Redacted.pdf |
PDF |
|
| MATOC_Questions.pdf |
PDF |
|
| Amendment_0001.pdf |
PDF |
|
| Att_4A_Past_Performance_Letter.pdf |
PDF |
|
| Att_1_JFSD201520_MATOC_Combined_Specifications_-_Nov_16.pdf |
PDF |
|
| Att_2C_MATOC_Demonstration_Project_Material_Submittal_Schedule.pdf |
PDF |
|
| Att_2D_Wage_Determination.pdf |
PDF |
|
| Att_4_Past_Performance_Questionnaire_MATOC.pdf |
PDF |
|
| Att_2_MATOC_Demonstration_Project_Specifications.pdf |
PDF |
|
| Att_3_Past_Performance_Information_Tool_instructions.docx |
DOCX document |
|
| Financial_Institution_Reference_Sheet.doc |
DOC document |
|
| Att_2B_MATOC_Demonstration_Project_Bid_Schedule.pdf |
PDF |
|
| Att_2A_MATOC_Demonstration_Project_Drawings.pdf |
PDF |
|
| MATOC_Solicitation.pdf |
PDF |
|
| RFP_letter.pdf |
PDF |
|
| Att_2E_Climate_Survey.xls |
XLS spreadsheet |
|
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated .