Att_2C_MATOC_Demonstration_Project_Material_Submittal_Schedule.pdf

PDF 43 KB Posted

Attached to
Grand Forks Air Force Base Multiple Award Task Order Contract (MATOC) Federal contract opportunity
Solicitation number
FA4659-17-R-0001
Issued by
Department of the Air Force Air Mobility Command

About this file

Att 2C MATOC Demonstration Project Material Submittal Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Grand Forks Air Force Base Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
MATOC_questions_21-27.pdf PDF
Amendment_0003.pdf PDF
MATOC_Questions_12-20.pdf PDF
Drawing_Existing_Sprinkler_As-Builts.pdf PDF
Amendment_0002.pdf PDF
MATOC_Questions.pdf PDF
Amendment_0001.pdf PDF
MATOC_site_Visit_sign_in_sheet_Redacted.pdf PDF
ppi_tool.accdb —
site_visit_memorandum.doc DOC document
Att_2E_Climate_Survey.xls XLS spreadsheet
Financial_Institution_Reference_Sheet.doc DOC document
Att_2B_MATOC_Demonstration_Project_Bid_Schedule.pdf PDF
Att_2A_MATOC_Demonstration_Project_Drawings.pdf PDF
MATOC_Solicitation.pdf PDF
RFP_letter.pdf PDF
Att_4A_Past_Performance_Letter.pdf PDF
Att_1_JFSD201520_MATOC_Combined_Specifications_-_Nov_16.pdf PDF
Att_2D_Wage_Determination.pdf PDF
Att_4_Past_Performance_Questionnaire_MATOC.pdf PDF
Att_2_MATOC_Demonstration_Project_Specifications.pdf PDF
Att_3_Past_Performance_Information_Tool_instructions.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

156-005 01000-1

PROJECT NO.

JFSD

200976A&B

APPROVED DISAPPROVED

1 Contractor Warranty. Sec. 01000 Para. 3.3 4

2 Base CE Work Clearance Request. Sec. 01000, Para. 4.1 4

3 USAF Welding, Cutting or Brazing Permit. Sec. 01000, Para. 4.2 4

4 NDDH Notification of Demolition and Renovation. Sec. 01000, Para. 4.3

5 New Air Emission Source Specifications. Sec. 01000, Para. 4.4 4

6 Project Site Plan. Sec. 01000, Para. 7.2.1 4

7 Dirt and Dust Control Plan. Sec. 01000, Para. 7.2.2 4

8 Contractor's Health and Safety Plan. Sec. 01000, Para. 7.2.3 4

9 Site Superintendent/ Project Manager Designation Letter. Sec.

01000, Para. 10.1.2

10 Site Conditions Photographs. Sec. 01000, Para. 12.5 4

11 Critical Path Method (CPM) Network Schedule. Sec. 01000, Para.

12.6.1

12 Schedule Showing Procurement Plans for Materials and Equipment. Sec. 01000, Para. 12.6.2

13 Exterior Utility System Drawings. Sec. 01000, Para. 12.7.1.1 1

14 As-Built Drawings. Sec. 01000, Para. 12.7.1.1 1

15 Real Property Record - Form DD1354. Sec. 01000, Para. 12.9 4

16 Environmental Pollution Control Plans. Sec. 01000, Para. 13.2 4

17 Storm Water Protection Plan. Sec. 01000, Para. 13.3.1 4

18 Waste Disposal Plan. Sec. 01000, Para. 13.6 4

19 Dust Control Plan. Sec. 01000, Para. 13.7 4

20 Radioactive Materials Documentation. Sec. 01000, Para. 13.10 4

21 Spill Control Plan. Sec. 01000, Para. 13.12 4

22 Erosion and Sediment Control Plan. Sec. 01000, Para. 13.13 4

23 Asbestos Abatement Submittals. Sec. 01000, Para. 13.16 and Spec. Sect. 02 82 14, if used.

24 Contractor Quality Control Plan. Sec. 01000, Para. 14.4 4

25 O & M Manuals. Sec. 01000, Para. 16 3

26 Sec. 01000, Affirmative Procurement Report 4

27 Sec. 01000, Bio-Based Product Report 4

S A

M P

LE

S

REQUIRED

DATE OF

SUBMISSION

DATE

RECEIVED

CONTRACTING

REMARKS

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSION

DATE

SUBMITTAL

NUMBER

DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

NO. OF COPIES REQUIRED

LI

N

E N

U M

B E

R ITEM DESCRIPTION, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

P R

O O

F O

F C

O M

P

LI

A N

C E

P R

O C

E D

U R

E S

S H

O P

D R

A W

IN

G

S

M A

N U

FA

C

TU

R

IN

G

D A

TA

C E

R

TI

FI

C

A

TE

S

TE

S

T D

A

TA

G U

A R

A N

TE

E

S

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT MANAGER

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

CONTRACT NO.PROJECT TITLE

UAS (RQ-4) ADD UTILITIES AND

ELECTRICAL SERVICES B516 (MC)

& UAS (RQ-4) REPAIR B516 (R/M)

GRAND FORKS AFB, ND

156-005 01000-2

JFSD

200976A&B

APPROVED DISAPPROVED

S A

M P

LE

S

REQUIRED

DATE OF

SUBMISSION

DATE

RECEIVED

CONTRACTING

REMARKS

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSION

DATE

SUBMITTAL

NUMBER

DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

NO. OF COPIES REQUIRED

LI

N

E N

U M

B E

R ITEM DESCRIPTION, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

P R

O O

F O

F C

O M

P

LI

A N

C E

P R

O C

E D

U R

E S

S H

O P

D R

A W

IN

G

S

M A

N U

FA

C

TU

R

IN

G

D A

TA

C E

R

TI

FI

C

A

TE

S

TE

S

T D

A

TA

G U

A R

A N

TE

E

S

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT MANAGER

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

CONTRACT NO.PROJECT TITLE

UAS (RQ-4) ADD UTILITIES AND

ELECTRICAL SERVICES B516 (MC)

& UAS (RQ-4) REPAIR B516 (R/M)

GRAND FORKS AFB, ND

1 ASBESTOS REMOVAL AND DISPOSAL 3 4 02 82 14

2 CONCRETE REINFORCEMENT 4 03 20 00

3 CONCRETE MIX DESIGN 03 30 00

4 JOINT SEALERS 4 3 07 92 00

5 METAL DOORS AND FRAMES 4 4 08 11 13

6 HARDWARE 4 4 08 71 00

7 RESILIENT FLOORING 4 3 09 65 00

8 PAINT 4 3 09 90 00

9 FIRE SPRINKLER EQUIPMENT, LAYOUT DRAWINGS

AND CALCULATIONS 4 4 21 05 00

10 PLUMBING FIXTURES 4 4 3 22 40 00

11 O&M MANUALS 3 23 00 00

12 RECORD DRAWINGS 1 23 00 00

13 PIPE AND FITTINGS 4 22 05 00/23 05 00

14 VALVES 4 22 05 00/23 05 00

15 PIPING SPECIALTIES 4 22 05 00/23 05 00

16 METERS AND GAUGES 4 22 05 00/23 05 00

17 SUPPORTS AND ANCHORS 4 22 05 00/23 05 00

18 MECHANICAL IDENTIFICATION 4 22 05 00/23 05 00

19 VIBRATION CONTROL 4 22 05 00/23 05 00

20 INSULATION 4 22 07 00/23 07 00

21 TEST AND BALANCE REPORT 4 23 05 93

22 VARIABLE FREQUENCY DRIVES 4 23 09 15

23 VFD FIELD REPORT/PARAMETERS AND SETTINGS 4 23 09 15

24 BUILDING MANAGEMENT AND CONTROL SYSTEM 4 4 23 09 05

25 HYDRONIC SPECIALTIES 4 23 21 13

26 FILTERS 4 23 30 00

27 SMOKE DAMPERS 4 23 30 00

156-005 01000-3

JFSD

200976A&B

APPROVED DISAPPROVED

S A

M P

LE

S

REQUIRED

DATE OF

SUBMISSION

DATE

RECEIVED

CONTRACTING

REMARKS

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSION

DATE

SUBMITTAL

NUMBER

DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

NO. OF COPIES REQUIRED

LI

N

E N

U M

B E

R ITEM DESCRIPTION, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

P R

O O

F O

F C

O M

P

LI

A N

C E

P R

O C

E D

U R

E S

S H

O P

D R

A W

IN

G

S

M A

N U

FA

C

TU

R

IN

G

D A

TA

C E

R

TI

FI

C

A

TE

S

TE

S

T D

A

TA

G U

A R

A N

TE

E

S

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT MANAGER

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

CONTRACT NO.PROJECT TITLE

UAS (RQ-4) ADD UTILITIES AND

ELECTRICAL SERVICES B516 (MC)

& UAS (RQ-4) REPAIR B516 (R/M)

GRAND FORKS AFB, ND

28 FIRE DAMPERS 4 23 30 00

29 DIFFUSERS, REGISTERS, AND GRILLES 4 23 30 00

30 LOUVERS 4 23 30 00

31 TERMINAL BOXES 4 23 30 00

32 AIR HANDLING UNITS 4 23 73 13

33 COMPUTER ROOM AIR CONDITIONERS (CRAC'S) 4 23 81 23

34 HUMIDIFIERS 4 23 84 13

35 COILS 4 23 82 00

36 OCCUPANCY SENSORS 4 26 09 23

37 PANELBOARDS 4 26 24 16

38 TRANSFORMERS 4 26 22 13

39 TRANSFER SWITCH 4 26 36 00

40 GENERATOR 4 26 32 13

41 WIRING DEVICES - SWITCHES 4 26 27 26

42 LIGHTING FIXTURES 4 26 51 13

44 FIRE ALARM SYSTEM 4 4 28 31 10

45 CONCRETE MIX DESIGN 4 32 16 13

46 ASPHALTIC CONCRETE MIX DESIGN 4 32 16 13

47 LANDSCAPING 3 32 93 00

Y\156_005\DOCUMENTS\SPECS\01000 PART 2.xls NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.