Att_2B_MATOC_Demonstration_Project_Bid_Schedule.pdf

PDF 21 KB Posted

Attached to
Grand Forks Air Force Base Multiple Award Task Order Contract (MATOC) Federal contract opportunity
Solicitation number
FA4659-17-R-0001
Issued by
Department of the Air Force Air Mobility Command

About this file

Att 2B MATOC Demonstration Project Bid Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Grand Forks Air Force Base Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
Amendment_0003.pdf PDF
MATOC_questions_21-27.pdf PDF
Drawing_Existing_Sprinkler_As-Builts.pdf PDF
Amendment_0002.pdf PDF
MATOC_Questions_12-20.pdf PDF
ppi_tool.accdb —
site_visit_memorandum.doc DOC document
MATOC_Questions.pdf PDF
Amendment_0001.pdf PDF
MATOC_site_Visit_sign_in_sheet_Redacted.pdf PDF
Att_4A_Past_Performance_Letter.pdf PDF
Att_1_JFSD201520_MATOC_Combined_Specifications_-_Nov_16.pdf PDF
Att_2C_MATOC_Demonstration_Project_Material_Submittal_Schedule.pdf PDF
Att_2D_Wage_Determination.pdf PDF
Att_4_Past_Performance_Questionnaire_MATOC.pdf PDF
Att_2_MATOC_Demonstration_Project_Specifications.pdf PDF
Att_3_Past_Performance_Information_Tool_instructions.docx DOCX document
Att_2E_Climate_Survey.xls XLS spreadsheet
Financial_Institution_Reference_Sheet.doc DOC document
Att_2A_MATOC_Demonstration_Project_Drawings.pdf PDF
MATOC_Solicitation.pdf PDF
RFP_letter.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No:

Contract No:

Bid Schedule and Evaluation/Award Criteria

Item Description Unit Qty Unit Price Extended Amount

Perform all Minor Construction work as specified in the technical provisions and shown on the project drawings for JFSD200976A/B. The minor construction portion of the work is identified on drawing sheet CU101 as Cost Break-Out Note "CB1". Lot 1 $ $

Perform all Repair work as specified in the technical provisions and shown on the project drawings for JFSD200976A/B. The Repair portion of the work is identified on drawing sheet CU101 as Cost Break-Out Note "CB2". Lot 1 $ $

Total For Items 001 and 002: $

BIDDERS MUST BID ON ALL ITEMS TO BE CONSIDERED RESPONSIVE.

Due to statutory limits, Item 001 is restricted to less than $1,000,000

EVALUATION FACTOR: Each proposal will be evaluated as to the lowest price on the total of Items 001 and 002

All extensions of the unit prices shown shall be subject to verification by the government.

In cases of a variation between the unit price and the extension, the unit price shall be considered the bid.

If a modification to the bid based on unit prices is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the Bid Schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment will be applied on a pro-rated basis to every unit price in the Bid Schedule.

Sheet1

File details come from the government source that posted it. Updated .