This is a submittal schedule template for the "Maintain Exterior Finishes" project at Malmstrom Air Force Base, Montana. The document is an Excel-based scheduling tool designed to track contractor submissions and compliance with the solicitation requirements outlined in the associated RFP (FA462626R0016). The template does not specify detailed products or services but rather provides a framework for organizing and monitoring project deliverables and milestones related to exterior building maintenance and repair work.
The submittal schedule serves as an administrative tool to ensure contractors meet required submission deadlines and coordinate the various phases of work, which may include window replacement/installation, exterior painting, masonry repair, soffit and fascia repair, parapet wall repair, siding repair, EIFS repair, overhead door replacement, and exterior door replacement. A mandatory site visit is scheduled for September 2, 2026, at 10:00 AM MDT, with technical questions due by September 8, 2026, at 2:00 PM MDT. The resulting contract will be a five-year Requirements-type contract awarded to one offeror by the Department of the Air Force Global Strike Command.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIALS SUBMITTALS | Project Number | Project Title: | Solicitation/Contract No. | ||||||||||||||||||
| NZAS 210053A | Maintain Exterior Finishes | FA4626-24-R-00016 | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR | ||||||||||||||||||||
| Number of Copies Required | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | NOTIFICATION | OTHER | REQUIRED SUBMISSION DATE (BY CONTRACTOR) | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| 1 | Start of Work Notification 01 00 00 3.11 | 1 | 14 PTSW | ||||||||||||||||||
| 2 | Notice of Final Inspection 01 00 00 3.12 | 1 | 7 PTFI | ||||||||||||||||||
| 3 | Utility Outage Notices 01 00 00 3.14 | 1 | 14 PTO | ||||||||||||||||||
| 4 | Quality Control Plan 01 00 00 3.18.2 | 2 | PTSW | ||||||||||||||||||
| 5 | Quality Control Records 01 00 00 3.18.4 | 2 | EWD | ||||||||||||||||||
| 6 | Progress Schedule 01 00 00 3.19 (AF Form 3064) | 2 | PTSW | ||||||||||||||||||
| 7 | EFIS 07 24 10 1.5 | 2 | 2 | PTSW | |||||||||||||||||
| 8 | Joint Sealants 07 92 00 1.5 | 2 | 2 | 2 | PTSW | ||||||||||||||||
| 9 | Steel Doors and Frames 08 11 13 1.2 | 2 | 2 | 2 | PTSW | ||||||||||||||||
| 10 | Overhead Coiling Doors 08 33 23 1.2 | 2 | 2 | PTSW | |||||||||||||||||
| 11 | Paint and Coatings 09 90 00 1.1 | 2 | 2 | PTSW |
| Schedule of Abbreviations: | ||||
| AWC | = After Work Completed | BMD | = | Before Material Delivery |
| PTSW | = Prior to Starting Work | AN | = | Advance Notification |
| AFA | = After Final Acceptance | SRO | = | After Each Occurrence |
| PTO | = Prior to Outage | PTFI | = | Prior to Final Inspection |
| PTNT | = Prior to Notice to Proceed | PTFP | = | Prior to Final Payment |
| ANTP | = After Notice to Proceed | PTCW | = | Prior to Completing Work |
| EWD | = Each work day AF Form 3000 not required | AFI | = | After Final Inspection |
| PTFA | = Prior to Final Acceptance | PTSA | = | Prior To Start of Action |
| ACA | = After Contract Award | PSS | = | Per Submittal Schedule |
&"Times New Roman,Regular"&12MALMSTROM AFB, MONTANA &"Times New Roman,Regular"&12FA4626 24-R-0016
&"Times New Roman,Regular"&12AF Form 66 &F-&D &"Times New Roman,Regular"&12
REQUIRED TECHNICAL SUBMITTALS
File details come from the government source that posted it. Updated .