This is a Schedule of Materials Submittals document for the "Maintain Exterior Finishes" project at Malmstrom Air Force Base, Montana, under Air Force contract FA4626-24-R-00016. The submittal schedule outlines eleven required technical submissions that contractors must provide at specified intervals throughout the project execution, with most submissions required prior to starting work (PTSW).

The required submittals include: Start of Work Notification and Notice of Final Inspection; Utility Outage Notices; Quality Control Plan and Records; Progress Schedule (AF Form 3064); and product-specific documentation for EFIS (Exterior Insulation and Finish System), joint sealants, steel doors and frames, overhead coiling doors, and paint and coatings. Each line item specifies the number of copies required (typically two), the types of documentation needed (such as certification of compliance, shop drawings, samples, color selections, manufacturer's recommendations, warranties, and catalog data), and the submission deadline relative to work phases. The document uses standardized abbreviations to indicate timing requirements, such as PTSW (Prior to Starting Work), PTFI (Prior to Final Inspection), EWD (Each Work Day), and PTCW (Prior to Completing Work). This template serves as an administrative tool for tracking contractor compliance with documentation requirements throughout the five-year requirements contract.

View the file

Other files

File Type Posted
Solicitation Amendment FA462626R00160002 - Amendment 2.pdf PDF
A5a_PWRS_4464_-_Final_Response_Letter_LOI.pdf PDF
A4_Combined Specs_SOW.pdf PDF
A9_Subcontractor Consent.docx DOCX document
A8_Past Performance Reference Sheet.docx DOCX document
Solicitation - FA462626R0016.pdf PDF
A7_Section L and M.pdf PDF
A3_Maintain Exterior Finishes TO1_As Built Details_Bldg 400 and Bldg 1448 - Amendment 1.pdf PDF
A5_ WD MT20260062 18May26.pdf PDF
A1_Maintain Exterior Finishes - SOW (Task Order) - Amendment 1 10Sep26.pdf PDF
A1a_Maintain Exterior Finishes Combined Photos_Amendement 1.pdf PDF
A2_Submittal Schedule_Maintain Exterior Finishes.xlsx XLSX spreadsheet
Solicitation Amendment FA462626R00160001 - Amendment 1.pdf PDF
A6_Maintain Exterior Finishes Bid Schedule - Amendment 1.xlsx XLSX spreadsheet
A10_QA_Maintain Exterior Finishes.xlsx XLSX spreadsheet
A9_Subcontractor Consent.docx DOCX document
A8_Past Performance Reference Sheet.docx DOCX document
A10_Blank CEAL.xlsx XLSX spreadsheet
A5_ WD MT20260062 18May26.pdf PDF
A7_Section L and M.pdf PDF
A6_Maintain Exterior Finishes Bid Schedule.xlsx XLSX spreadsheet
A1_Maintain Exterior Finishes - SOW (Task Order) 4Aug26.pdf PDF
A4_Combined Specs_SOW.pdf PDF
A3_Maintain Exterior Finishes TO1_As Built Details_Bldg 400 and Bldg 1448.pdf PDF
Solicitation - FA462626R0016.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 210053AMaintain Exterior FinishesFA4626-24-R-00016
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSNOTIFICATIONOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
1Start of Work Notification 01 00 00 3.11114 PTSW
2Notice of Final Inspection 01 00 00 3.1217 PTFI
3Utility Outage Notices 01 00 00 3.14114 PTO
4Quality Control Plan 01 00 00 3.18.22PTSW
5Quality Control Records 01 00 00 3.18.42EWD
6Progress Schedule 01 00 00 3.19 (AF Form 3064)2PTSW
7EFIS 07 24 10 1.522PTSW
8Joint Sealants 07 92 00 1.5222PTSW
9Steel Doors and Frames 08 11 13 1.2222PTSW
10Overhead Coiling Doors 08 33 23 1.222PTSW
11Paint and Coatings 09 90 00 1.122PTSW
Schedule of Abbreviations:
AWC= After Work CompletedBMD=Before Material Delivery
PTSW= Prior to Starting WorkAN=Advance Notification
AFA= After Final AcceptanceSRO=After Each Occurrence
PTO= Prior to OutagePTFI=Prior to Final Inspection
PTNT= Prior to Notice to ProceedPTFP=Prior to Final Payment
ANTP= After Notice to ProceedPTCW=Prior to Completing Work
EWD= Each work day AF Form 3000 not requiredAFI=After Final Inspection
PTFA= Prior to Final AcceptancePTSA=Prior To Start of Action
ACA= After Contract AwardPSS=Per Submittal Schedule

&"Times New Roman,Regular"&12MALMSTROM AFB, MONTANA &"Times New Roman,Regular"&12FA4626 24-R-0016

&"Times New Roman,Regular"&12AF Form 66 &F-&D &"Times New Roman,Regular"&12

REQUIRED TECHNICAL SUBMITTALS