This is a Questions and Answers document for solicitation FA4626-26-R-0016, "Maintain Exterior Finishes," a five-year Requirements-type contract with a $4.5 million maximum value for exterior maintenance and repair work at Malmstrom Air Force Base, Montana.
The initial task order encompasses work on Buildings 400 and 1448, including: installation of 76 missing window panes and 6 complete window frames with panes in Building 400 (priced as lump sum under CLIN 0001AC); overhead door replacement in Building 1448; and an asbestos and lead-based paint survey (CLIN 0001AG). Window specifications require traditional oil-based glazing putty with panes installed to match existing adjacent panes; Building 400 is not a historic structure. Key requirements include a Quality Control Manager dedicating at least two hours daily to QC duties (who may be dual-hatted with other roles) and performance within 75 calendar days during normal operating hours (0730–1600). Liquidated damages are set at $405.96 per day. The Government will provide storage at Building 1448's wash bay (unsecured after door removal) and designated outdoor storage at Building 400; 110V power and water from a hydrant north of Building 470 are available at no cost, with contractors bearing costs for temporary connections or additional power. Contractors must field verify all window pane dimensions. Future task orders beyond the initial seed project will be negotiated individually and subject to fair and reasonable determination by the Contracting Officer. The seed project award depends on Government funding availability.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Maintain Exterior Finishes FA4626-26-R-0016 | |||
| Questions and Answers | |||
| Question # | Question | Answer | |
| 1 | What are the windows made of-what type of glass are you looking for? | Please see "Exterior Improvements IDIQ - SOW Amendment 1" for clearification on the windows. | |
| 2 | We need information on the windows at Bldg. 400. What are the windows | ||
| made of, what type of glass are you looking for? | Please see "Exterior Improvements IDIQ - SOW Amendment 1" for clearification on the windows. | ||
| 3 | Can we get some pictures of the windows up close? Such as frame type, | ||
| window stops, is the glass insulated, how thick is the glass etc. | Please see Combined Pictures | ||
| 4 | Per the statement of work, we are to include the cost for an asbestos and lead based | ||
| paint survey. Which CLIN item should this cost be included in? | Please see Amendment 1 Bid Schedule; CLIN 0001AG Asbestos and Lead Based Paint Investigation has been added | ||
| 5 | The Bldg 400 scope states to install 76 missing window panes and 6 window frames with panes. CLIN 0001AC “Repair Window Panes Bldg 400” has a quantity of 76 each, which is the quantity of panes, but where should the cost for the 6 window frames and panes go? | Please see "Exterior Improvements IDIQ - SOW Amendment 1" for clearification on the windows. Cost for the full windows and frames are to be included in CLIN 0001AC. CLIN 0001AC has been changed to Lump Sum Price. | |
| 6 | The solicitation requires the contractor to procure a State-credentialed asbestos and lead-based paint inspector to survey materials prior to construction. If hazardous materials are identified during this survey, will the subsequent abatement and remediation work be negotiated as a bilateral contract modification, or should offerors include a contingency cost for abatement in their initial task order proposals? | If hazardous materials are indentifed during the asbestos and lead-based paint survey, the subsequent abatement and remediation work may be negotiated as a contract modification. | |
| 7 | The key requirements specify a full-time Quality Control Manager dedicating at least 2 hours per day to QC duties. Can this QC Manager be 'dual-hatted' and also perform other on-site roles (such as Project Superintendent or Site Safety and Health Officer), or does the Government require a dedicated, single-role individual? | The QC manager can be 'duel-hatted'. | |
| 8 | Could the Government confirm if Davis-Bacon Act (DBA) Wage Determinations apply to this requirements contract and the initial task order, and if so, provide the applicable Wage Determination decision number? | Please see solicitation. | |
| 9 | Regarding the replacement of 72 window panes and 6 window frames on Building 400, are there specific material, thermal, or blast-resistance (UFC 4-010-01) specifications we must adhere to? | ||
| Additionally, is Building 400 designated as a historic structure requiring State Historic Preservation Office (SHPO) compliant materials? | Please see Exterior Improvements IDIQ - SOW Amendment 1 on window properties. Building 400 is NOT a historical building. | ||
| 10 | Will the Government provide a secure laydown and storage area on Malmstrom AFB for construction materials and equipment (such as scaffolding, doors, and lifts) for the duration of the initial task order? Additionally, will the contractor have access to Government-furnished water and electricity at the job sites at no cost? | BLDG 1448: All materials and equipment can be stored inside of the wash bay. Once doors are removed the wash bay will not be secure, however, and contractor will need to account for this period of time. BLDG 400: No indoor storage is authorized in this building and outdoor storage will be the responsibility of the contractor. 110V power is available at no cost to the contractor. Any temporary connection or lines that may be required will be installed, maintained, and removed by the Contractor at his/her own expense and in such a manner satisfactory to the Contracting Officer. Any additional power required must be supplied by the contractor. Water is available via a water hydrant on the north side of bldg 470 at no cost to the contractor. | |
| 11 | While the initial task order scope is defined for Buildings 400 and 1448, the contract is structured as a 5-year Requirements contract with a $4.5M maximum value. Could the Government clarify how pricing should be structured for future, yet-to-be-defined task orders over the 5-year ordering period (e.g., via a coefficient applied to a unit price book like RSMeans, or through pre-established CLIN unit rates)? | ||
| Please see the Solicitation. All subsequent task orders shall be negotiated between the government and the contractor and determined fair and reasonable by the contracting officer. If they cannot be determined fair and reasonable they will not be awarded. | |||
| 12 | Can specifications for the 76 missing window panes be provided? Dimensions, thickness, |
etc?
a. Are all 76 panes the same dimension and specification? Please provide all window
| pane dimensions. | Contractor is to field verify ALL dimensions for the project. | ||
| 13 | Can specifications for the 6 window frames with panes be provided? | Please see "Exterior Improvements IDIQ - SOW Amendment 1" for clarification on the windows. | |
| 14 | For the 76 windows being replaced, can you provide glazing material and installation | ||
| requirements? | Glazing material to be a traditional oil-based glazzing putty, install the panes to match existing adjacant panes | ||
| 15 | What is the valuation price range for this seed project? | In accordance with the RFO, Disclosure of Magnitude is no longer required and is not provided. | |
| 16 | POP states 75 days. Is this working days or calendar days? | Calendar Days | |
| 17 | Can this work be performed during normal working hours? | Yes: 0730 - 0400 are normal operating hours | |
| 18 | Are there liquidated damages on the seed project? | In accordance with Clause 52.211-12 within the solicitation, liquidated damages to the Government are required in the amount of $405.96. | |
| 19 | Is a specific overhead door manufacturer required, or is any manufacturer that meets all |
specifications acceptable?
| a. Are the motors being replaced as well or are we using existing? | This requirement is not a Brand Name, the pictures are to show what is in place currently, the government would require that the color match and that the salient characteristics are alike. | ||
| 20 | Can a door hardware schedule be provided? | Door hardware is to match existing: Please see attached photos | |
| 21 | Will the seed project be awarded or is it a pricing exercise only? | The seed project will be awarded dependant on the state of Government available funding. | |
| 22 | What is the required wind load for the overhead doors? | 20 lbs./sq ft. | |
| 23 | |||
| 24 | |||
| 25 | |||
| 26 | |||
| 27 | |||
| 28 | |||
| 29 |