5_Blank Bid Sch (Amend 2).xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- High Temperature Hot Water System Repair Federal contract opportunity
- Solicitation number
- FA462624R0009
About this file
This document is a Blank Bid Schedule template for a federal contract opportunity to repair the High Temperature Hot Water (HTHW) system at Malmstrom Air Force Base. The template includes detailed line items for various repair tasks such as replacing service lines, removing and replacing concrete, asphalt, and sidewalks, handling contaminated soil, and providing mobilization and bonding. The total evaluated price is listed as $0.00.
The related federal contract opportunity is a 100% small business set-aside for an Indefinite Delivery Indefinite Quantity (IDIQ) contract to repair the HTHW system at Malmstrom AFB. The contract has a 5-year ordering period with a total aggregate not to exceed $4,999,999.99. Task orders will involve excavating, repairing, and/or replacing HTHW service lines, distribution lines, sump pumps, and valves. The work falls under NAICS code 238220 with a $19,000,000.00 small business size standard.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Blank Bid Sch
| CLIN Schedule |
| REPAIR HTHW Service Lines, BLDG 1464 |
| Project #NZAS 24-0018- Task Order 1 |
| CLIN # | Description | Unit | Unit Qty | Unit Price | Extended Price |
| CLIN 0001 | Informational CLIN: Repair HTHW Service Lines, BLDG 1464: The prices provided for Sub-CLINs 0001AA through 0001AL will be the prices used for any mobilization, bonding, government delays, materials, labor, and equipment. |
| 0001 AA | Unknown Utility Crossings: Estimated Quantity - Shall be measured and paid for per each live or abandoned utility crossing encountered during excavation that is not shown on the plans and is not located in the field, which causes extra time and/or materials to be expensed beyond the base bid. If two or more unidentified utilities are located within 3 feet of each other, they will be paid for as a single unidentified utility crossing. Payment will be made at the contract price per each unidentified crossing, including all lost crew time, delays, down time, and all other work necessary or incidental for completion of the item. Payment for this item requires the notification of, and inspection by, the Contracting Officer at the time of discovery as well as documentation of the crossing on the as-built drawings. | EA | 25 | $0.00 |
| 0001 AB | Replace HTHW Service Lines | EA | 1 | $0.00 |
| 0001 AC | Concrete Curb and Gutter Removal | LF | 200 | $0.00 |
| 0001 AD | Asphalt Cutting | LF | 560 | $0.00 |
| 0001 AE | Asphalt Removal and Replacement | LF | 480 | $0.00 |
| 0001 AF | Precast Manholes | EA | 1 | $0.00 |
| 0001 AG | Contaminated Soil Disoposal (Qty is estimated) | CY | 10 | $0.00 |
| 0001 AH | Clean Fill | CY | 10 | $0.00 |
| 0001 AJ | Concrete Sidewalk removal and replacement | LF | 100 | $0.00 |
| 0001 AK | Mobilization: All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract costs for “Mobilization”. The cost of all insurance, permits, safety, fees and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract price for “Mobilization." | Job | 1 | $0.00 |
| 0001 AL | Bonding: Shall be paid for as a lump sum at the amount per Government contract requirements. At no time shall payment for this item be higher than actual cost of bonds. | Job | 1 | $0.00 |
| TOTAL | $0.00 |
| CLIN Schedule |
| REPAIR HTHW SUMP PUMPS |
| Solicitation Number: |
| Project #1123678 - Task Order 2 |
| CLIN # | Description | Unit | Unit Qty | Unit Price | Extended Price |
| CLIN 0001 | Informational CLIN: Repair HTHW Sump Pumps: The prices provided for Sub-CLINs 0001AA through 0001AD will be the prices used for any mobilization, bonding, materials, labor, and equipment. |
| 0001 AA | Mobilization: All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract costs for “Mobilization”. The cost of all insurance, permits, safety, fees and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract price for “Mobilization." | JOB | 1 | $0.00 |
| 0001 AB | Unknown Utility Crossings: Estimated Quantity - Shall be measured and paid for per each live or abandoned utility crossing encountered during excavation that is not shown on the plans and is not located in the field, which causes extra time and/or materials to be expensed beyond the base bid. If two or more unidentified utilities are located within 3 feet of each other, they will be paid for as a single unidentified utility crossing. Payment will be made at the contract price per each unidentified crossing, including all lost crew time, delays, down time, and all other work necessary or incidental for completion of the item. Payment for this item requires the notification of, and inspection by, the Contracting Officer at the time of discovery as well as documentation of the crossing on the as-built drawings. | EA | 20 | $0.00 |
| 0001 AC | HTHW Sump Pumps: All costs for materials, work and equipment necessary, including but not limited to, demolition, preparation, and installation of "HTHW Sump Pump Systems." Work included in this item includes all work in Specification Divisions 3, 26, 31, & 33, as well as related activities covered in Division 1. | JOB | 1 | $0.00 |
| 0001 AD | Bonding: Shall be paid for as a lump sum at the amount per Government contract requirements. At no time shall payment for this item be higher than actual cost of bonds. | |||
| TOTAL | $0.00 |
Total Evaluated Price $0.00