2A_Submittal Schedule HTHW Sumps.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
High Temperature Hot Water System Repair Federal contract opportunity
Solicitation number
FA462624R0009
Issued by
Department of the Air Force Global Strike Command

About this file

This document is a submittal schedule for a federal contract opportunity to repair the High Temperature Hot Water (HTHW) system at Malmstrom Air Force Base. The contract is a 5-year indefinite delivery, indefinite quantity (IDIQ) firm-fixed price contract with a total not-to-exceed value of $4,999,999.99. It is a 100% small business set-aside under NAICS code 238220. The work includes excavating, repairing, and/or replacing HTHW system components such as service lines, distribution lines, sump pumps, and valves. The submittal schedule lists numerous deliverables required from the contractor, such as shop drawings, product data, quality control plans, schedules, permits, and test reports, with due dates ranging from 7 days to 45 days. The federal agency is the Department of the Air Force Global Strike Command.

View the file

Other files for this federal contract opportunity

Other files attached to High Temperature Hot Water System Repair, newest first.
File Type Posted
0_Solicitation - FA462624R00090003 Amend 03.pdf PDF
13_QA_13 Aug 2024 (Amend 3).xlsx XLSX spreadsheet
15_ME1.2 AMENDED (Amend 2).pdf PDF
0_Solicitation - FA462624R00090002 Amend 02.pdf PDF
14_ME1.3 AMENDED (Amend 2).pdf PDF
11_ME0.4 AMENDED (Amend 2).pdf PDF
5_Blank Bid Sch (Amend 2).xlsx XLSX spreadsheet
6_MT20240066_ 02 Aug 24_Heavy (Amend 2).pdf PDF
13_QA_6 Aug 2024 (Amend 2).xlsx XLSX spreadsheet
16_M17.3 AMENDED (Amend 2).pdf PDF
0_Solicitation - FA462624R0009 Amend 01.pdf PDF
9_Subcontractor Consent (Amend 1).pdf PDF
11_ME0.4 AMENDED (Amend 1).pdf PDF
12_M17.4 AMENDED (Amend 1).pdf PDF
13_QA_29 Jul 2024 (Amend 1).xlsx XLSX spreadsheet
10_C1.2 AMENDED (Amend 1).pdf PDF
7_Sections L and M - HTHW Requirements (updated 072924 Amend 1).pdf PDF
6_MT20240066 27 Jun 2024_Heavy.pdf PDF
5_Blank Bid Sch.xlsx XLSX spreadsheet
4B_DRAWINGS - Service Lines BLDG 1464.pdf PDF
7_Sections L and M - HTHW Requirements.pdf PDF
4A_Sheet Index - Service Lines Bldg 1464.pdf PDF
2B_Submittal Schedule Service Lines 1464.xlsx XLSX spreadsheet
0_Solicitation - FA462624R0009.pdf PDF
8_Past Performance Questionaire.pdf PDF
3B_DRAWINGS - Sump Pumps.pdf PDF
3A_Sheet Index - Sump Pumps.pdf PDF
1B_SPECS Service Lines BLDG 1464.pdf PDF
1A_SPECS - Sump Pumps.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
1123678Repair HTHW Sump Pumps
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSNOTIFICATIONOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
DIVISION 01 - GENERAL REQUIREMENTS
101 00 00 General Requirements - 3.5 As-Built Field Data23 -d PTFI
201 00 00 General Requirements - 3.5.F Final As-Built Drawings130-d AFIAutoCAD CD
301 00 00 General Requirements - 3.7 Operation and Maintance Instructions121d- ATT & PPC1 Hardcopy, 2 CDs
401 00 00 General Requirements - 3.8 Contractor Furnished Equipment Data110-d PTFIEquipment List and Guarantees
501 00 00 General Requirements - 3.11 Start of Work Notification121-d PTSW
601 00 00 General Requirements - 3.12 Notice of Pre-Final and Final Inspections114-d PTERed line “As-Built” dwgs shall be provided by the Contractor at final inspection.
701 00 00 General Requirements - 3.13 Construction Near Utility Systems - Form AF10314-d PTSWAF Form 103: Work Clearance
801 00 00 General Requirements - 3.14 Utility Outages14-d PTESchedule submitted to Construction Management for Approval
901 00 00 General Requirements - 3.15 Submittals - AF Form 663
1001 00 00 General Requirements - 3.18 Quality Control Plan310-d ANP and PTSWQuality Control Plan must be acceptable to the Government before construction can begin.
1101 00 00 General Requirements - 3.19 Contract Progress Schedule and ReportANP - AFIProject Scheudle Form 3064-1st and 15th of each month: Progress Report Form 3065 -every 2 weeks
1201 00 00 General Requirements - 3.20 1354 Checklist - Property Inventory Checklist10-d PTFI
1301 00 00 General Requirements - 3.22 Nuclear Densometers330d - PTSW
1401 10 00 - Security Requirements - 1.3.2 Entry Authoirty List (EAL)14-d PTSWElectronic CEAL submittal
1501 36 00 - Environmental Protection - 2.0 Permits and Fees 2.3 Environmental Deliverables5PTSWAll appliable environmental permits, forms, plans, etc.
1601 36 00 - Environmental Protection - 4.0 Water Resources and Storm Water Discharge 4.1.2 MDEQ General Permit Coverage10-d PTEIf permit required, NOI package to CES/CEIE for review prior to submitall to MDEQ
1701 36 00 - Environmental Protection - 8.0 Hazardous Materials 8.2 HAZMAT Inventory SubmittalANP, 30-d PTSWForm Template in Attachment 2-01 36 00
1801 36 00 - Environmental Protection - 8.0 Hazardous Materials 8.5 HAZMAT Closeout Report110-d PTFI
1901 36 00 - Environmental Protection - 10.0 Hazardous Waste 10.1 Waste Manifest45-d PTESubmit to CESCEIE 731-6163
2001 36 00 - Environmental Protection - 11 Solid Waste 11.5.2 Summary of Solid Waste Disposal and Diversion10th Each MonthAttachment 1-01 36 00
2101 70 00 Execution and Closeout Requirements - 1.3A Demolition Plan330D PSW
2201 70 00 Execution and Closeout Requirements - 1.3B Cutting and Patching: work clearance330D PSW
2301 70 00 Execution and Closeout Requirements - 1.3C Project Record Documents330D PPC
24
25DIVISION 02 - EXISTING CONDITIONS
2602 41 00 Demolition - 1.4A Site Plan330D PSW
2702 41 00 Demolition - 1.4B Demolition Plan330D PSW
2802 41 00 Demolition - 1.4C Project Record Documents
29
30DIVISION 03 - CONCRETE
31Section 03 30 00 Cast-in-Place-Concrete 1.3.A Submittals - Concrete Mix Design30-PTSWSubmit written reports for each proposed mix for each class of concrete
3203 30 00 Cast-in-Place Concrete - 1.3A Concrete Mix Design330d - BBCW
3303 30 00 Cast-in-Place Concrete - 1.3B Product Data2230d - BBCW
3403 30 00 Cast-in-Place Concrete - 1.3C Shop Drawings230d BBCW
3503 30 00 Cast-in-Place Concrete - 1.3D Cold Weather Placing Plan230d BBCW
3603 30 00 Cast-in-Place Concrete - 1.3E Hot Weather Placing Plan230d BBCW
3703 30 00 Cast-in-Place Concrete - 1.3F Batch Tickets1TD
3803 30 00 Cast-in-Place Concrete - 1.4 Quality Control1Submit to the Contracting Officer for Approval in accordance with ACI 121R.
393 30 00 Cast-in-Place Concrete - 3.14 Concrete Tests - Compressive Strength, Slump, Air Content, Temperature27d - ATT
40DIVISION 26 - ELECTRICAL
4126 00 00 General Provisions for Electrical Work - 1.2.A. Qualifications330 D ANP
4226 00 00 General Provisions for Electrical Work - 1.3 Codes, Regulations and PermitsANPObtain and arrange for all permits and approvals required for work
4326 05 19 Low-Voltage Electrical Power Conductors and Cables - 1.3.A. Product Data330 D ANP
4426 05 19 Low-Voltage Electrical Power Conductors and Cables - 1.4.A. Informational Submittals - Qualification data330 D ANP
4526 05 19 Low-Voltage Electrical Power Conductors and Cables - 1.4.B. Field Quality Control Test Reports37 D ATT
4626 05 26 Grounding and Bonding for Electrical Systems - 1.3A. Product Data330 D ANP
4726 05 26 Grounding and Bonding for Electrical Systems - 1.3B. Wiring Diagrams330 D ANP
4826 05 26 Grounding and Bonding for Electrical Systems - 1.3C. Test Reports37 D ATT
4926 05 26 Grounding and Bonding for Electrical Systems - 1.4A. Manufacturer's Qualifications330 D ANP
5026 05 26 Grounding and Bonding for Electrical Systems - 1.4B. Installer Qualifications330 D ANP
5126 05 29 Hangers and Supports for Electrical Systems - 1.4A. Product Data330 D ANP
5226 05 29 Hangers and Supports for Electrical Systems - 1.4B. Shop Drawings330 D ANP
5326 05 43 Underground Ducts and Raceways for Electrical Systems - 1.4A. Product Data330 D ANP
5426 05 53 Identification for Electrical Systems - 1.3. Product Data330 D ANP
5526 22 00 Low-Voltage Transformers - 1.3A. Product Data330 D ANP
5626 22 00 Low-Voltage Transformers - 1.3B. Shop Drawings330 D ANP
5726 22 00 Low-Voltage Transformers - 1.3.B.1 Shop Drawings - Wiring Diagrams330 D ANP
58
59DIVISION 31 - EARTHWORK
6031 23 33 Trench Excavation and Backfill for Pipelines and Appurtenant Structures - 1.8 Protection of Existing Properties and Utilities Notices21D PTSW
61
62DIVISION 32 - EXTERIOR IMPROVEMENTS
6332 10 00 Asphaltic Concrete Pavement - 1.1A Submittals, Crushed Gravel Material Properties330D PSW
6432 10 00 Asphaltic Concrete Pavement - 1.1B Submittals, Plant Mix Gravel330D PSW
6532 10 00 Asphaltic Concrete Pavement - 1.1C Submittals, Asphalt Cement330D PSW
6632 10 00 Asphaltic Concrete Pavement - 1.1D Submittals, Tack Coat330D PSW
6732 10 00 Asphaltic Concrete Pavement - 1.1E Submittals, Asphaltic Mix Design330D PSW
6832 10 00 Asphaltic Concrete Pavement - 1.1F Submittals, Quality Control Test Results37D ATT
6932 92 00 Seeding and Sodding - 1.2A Sod Composition Certification330D PSW
7032 92 00 Seeding and Sodding - 1.2B Grass Seed Mixture330D PSW
7132 92 00 Seeding and Sodding - 1.2C Topsoil330D PSW
7232 92 00 Seeding and Sodding - 1.2D Fiber Mulch330D PSW
73
74DIVISION 33 - UTILITIES
7533 05 23.13 Utility Horizontal Directional Drilling - 1.2A Preconstruction: Qualifications, HDD Plan3330D ANP
7633 05 23.13 Utility Horizontal Directional Drilling - 1.2B Product Data: Pipe330D ANP
7733 05 23.13 Utility Horizontal Directional Drilling - 1.2B Certificates: Drill Rod330D ANP
7833 05 23.13 Utility Horizontal Directional Drilling - 1.2B Closeout: Record Drawings, Work Logs330D PPC
7933 14 33 Packaged Pumping Systems for Water Utility Service - 1.3B Product Data330D ANP
8033 14 33 Packaged Pumping Systems for Water Utility Service - 1.3C Shop Drawings330D ANP
8133 14 33 Packaged Pumping Systems for Water Utility Service - 1.3D Source QC reports330D PSW
8233 14 33 Packaged Pumping Systems for Water Utility Service - 1.3E Manf Qualifications Statement330D ANP
8333 14 33 Packaged Pumping Systems for Water Utility Service - 1.3F Field QC Reports37D ATT
8433 14 33 Packaged Pumping Systems for Water Utility Service - 1.3G O&M Data330D PPC
8533 14 33 Packaged Pumping Systems for Water Utility Service - 1.3H Warranty330D PPC
8633 14 33 Packaged Pumping Systems for Water Utility Service - 1.3.5 System Commissioning330D PPCComssioning Report, Level Setpoint Redlines
87
Schedule of Abbreviations:
AFI =After Final InspectionPTE= Prior to Event
ANP=After Notice to ProceedPTFI= Prior to Final Inspection
ATT=After Test TakenPTSW = Prior to Start of Work
BBCW=Before Beginning Concrete WorkPPC = Prior to Project Completion
BD=Before DeliveryTD = Time of Delivery

&"Times New Roman,Regular"&12MALMSTROM AFB, MONTANA &"Times New Roman,Regular"&12

&"Times New Roman,Regular"&12AF Form 66 Repair HTHW Sump Pumps Schedule-&D &"Times New Roman,Regular"&12 01330a-&P

REQUIRED TECHNICAL SUBMITTALS

File details come from the government source that posted it. Updated .