5_Blank Bid Sch.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
High Temperature Hot Water System Repair Federal contract opportunity
Solicitation number
FA462624R0009
Issued by
Department of the Air Force Global Strike Command

About this file

This document is a blank bid schedule for a federal contract opportunity related to the repair of a High Temperature Hot Water (HTHW) system at Malmstrom Air Force Base.

The contract opportunity is a 100% small business set-aside solicitation for an Indefinite Delivery Indefinite Quantity (IDIQ) contract to construct, maintain, and repair the HTHW system at Malmstrom AFB. The contract will have a 5-year ordering period, with a total aggregate value not to exceed $4,999,999.99. The work includes excavating, repairing, and/or replacing components of the HTHW service lines, distribution lines, sump pumps, and valves. The bid schedule provides line items for various repair activities such as replacing service lines, removing and replacing concrete and asphalt, and mobilization costs. Pricing is requested on a unit price basis for the various line items.

View the file

Other files for this federal contract opportunity

Other files attached to High Temperature Hot Water System Repair, newest first.
File Type Posted
0_Solicitation - FA462624R00090003 Amend 03.pdf PDF
13_QA_13 Aug 2024 (Amend 3).xlsx XLSX spreadsheet
16_M17.3 AMENDED (Amend 2).pdf PDF
0_Solicitation - FA462624R00090002 Amend 02.pdf PDF
14_ME1.3 AMENDED (Amend 2).pdf PDF
11_ME0.4 AMENDED (Amend 2).pdf PDF
15_ME1.2 AMENDED (Amend 2).pdf PDF
5_Blank Bid Sch (Amend 2).xlsx XLSX spreadsheet
6_MT20240066_ 02 Aug 24_Heavy (Amend 2).pdf PDF
13_QA_6 Aug 2024 (Amend 2).xlsx XLSX spreadsheet
7_Sections L and M - HTHW Requirements (updated 072924 Amend 1).pdf PDF
11_ME0.4 AMENDED (Amend 1).pdf PDF
12_M17.4 AMENDED (Amend 1).pdf PDF
0_Solicitation - FA462624R0009 Amend 01.pdf PDF
9_Subcontractor Consent (Amend 1).pdf PDF
13_QA_29 Jul 2024 (Amend 1).xlsx XLSX spreadsheet
10_C1.2 AMENDED (Amend 1).pdf PDF
7_Sections L and M - HTHW Requirements.pdf PDF
4A_Sheet Index - Service Lines Bldg 1464.pdf PDF
2B_Submittal Schedule Service Lines 1464.xlsx XLSX spreadsheet
0_Solicitation - FA462624R0009.pdf PDF
6_MT20240066 27 Jun 2024_Heavy.pdf PDF
4B_DRAWINGS - Service Lines BLDG 1464.pdf PDF
8_Past Performance Questionaire.pdf PDF
3B_DRAWINGS - Sump Pumps.pdf PDF
3A_Sheet Index - Sump Pumps.pdf PDF
2A_Submittal Schedule HTHW Sumps.xlsx XLSX spreadsheet
1B_SPECS Service Lines BLDG 1464.pdf PDF
1A_SPECS - Sump Pumps.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Blank Bid Sch

CLIN Schedule
REPAIR HTHW Service Lines, BLDG 1464
Project #NZAS 24-0018- Task Order 1
CLIN #DescriptionUnitUnit QtyUnit PriceExtended Price
CLIN 0001Informational CLIN: Repair HTHW Service Lines, BLDG 1464: The prices provided for Sub-CLINs 0001AA through 0001AL will be the prices used for any mobilization, bonding, government delays, materials, labor, and equipment.
0001 AAUnknown Utility Crossings: Estimated Quantity - Shall be measured and paid for per each live or abandoned utility crossing encountered during excavation that is not shown on the plans and is not located in the field, which causes extra time and/or materials to be expensed beyond the base bid. If two or more unidentified utilities are located within 3 feet of each other, they will be paid for as a single unidentified utility crossing. Payment will be made at the contract price per each unidentified crossing, including all lost crew time, delays, down time, and all other work necessary or incidental for completion of the item. Payment for this item requires the notification of, and inspection by, the Contracting Officer at the time of discovery as well as documentation of the crossing on the as-built drawings.EA25$0.00
0001 ABReplace HTHW Service LinesEA1$0.00
0001 ACConcrete Curb and Gutter RemovalLF200$0.00
0001 ADAsphalt CuttingLF560$0.00
0001 AEAsphalt Removal and ReplacementLF480$0.00
0001 AFPrecast ManholesEA1$0.00
0001 AGContaminated Soil Disoposal (Qty is estimated)CY10$0.00
0001 AHClean FillCY10$0.00
0001 AJConcrete Sidewalk removal and replacementLF100$0.00
0001 AKMobilization: All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract costs for “Mobilization”. The cost of all insurance, permits, safety, fees and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract price for “Mobilization."Job1$0.00
0001 ALBonding: Shall be paid for as a lump sum at the amount per Government contract requirements. At no time shall payment for this item be higher than actual cost of bonds.Job1$0.00
TOTAL$0.00
CLIN Schedule
REPAIR HTHW SUMP PUMPS
Solicitation Number:
Project #1123678 - Task Order 2
CLIN #DescriptionUnitUnit QtyUnit PriceExtended Price
CLIN 0001Informational CLIN: Repair HTHW Sump Pumps: The prices provided for Sub-CLINs 0001AA through 0001AD will be the prices used for any mobilization, bonding, materials, labor, and equipment.
0001 AAMobilization: All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract costs for “Mobilization”. The cost of all insurance, permits, safety, fees and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract price for “Mobilization."JOB1$0.00
0001 ABUnknown Utility Crossings: Estimated Quantity - Shall be measured and paid for per each live or abandoned utility crossing encountered during excavation that is not shown on the plans and is not located in the field, which causes extra time and/or materials to be expensed beyond the base bid. If two or more unidentified utilities are located within 3 feet of each other, they will be paid for as a single unidentified utility crossing. Payment will be made at the contract price per each unidentified crossing, including all lost crew time, delays, down time, and all other work necessary or incidental for completion of the item. Payment for this item requires the notification of, and inspection by, the Contracting Officer at the time of discovery as well as documentation of the crossing on the as-built drawings.EA20$0.00
0001 ACHTHW Sump Pumps: All costs for materials, work and equipment necessary, including but not limited to, demolition, preparation, and installation of "HTHW Sump Pump Systems." Work included in this item includes all work in Specification Divisions 3, 26, 31, & 33, as well as related activities covered in Division 1.JOB1$0.00
0001 ADBonding: Shall be paid for as a lump sum at the amount per Government contract requirements. At no time shall payment for this item be higher than actual cost of bonds.
TOTAL$0.00

Total Evaluated Price $0.00

Sheet2

CLIN Strucuture
CLIN #DescriptionUnitUnit QtyUnit PriceExtended Price
CLIN 0001Service Lines
CLIN 0002Distro Lines
CLIN 0003Bonding
CLIN 0004Main Pumps
CLIN 0005Sump Pumps
CLIN 0006Valves
CLIN 0007Assessments