1A_SPECS - Sump Pumps.pdf

PDF 767 KB Posted

Attached to
High Temperature Hot Water System Repair Federal contract opportunity
Solicitation number
FA462624R0009
Issued by
Department of the Air Force Global Strike Command

About this file

This document appears to be an attachment containing the specifications for the "Repair HTHW Sump Pumps" project, part of a larger federal contract opportunity titled "High Temperature Hot Water System Repair" at Malmstrom Air Force Base.

The key details are:

  • This is a 100% Small Business set-aside solicitation for an IDIQ contract with a 5-year ordering period to construct, maintain, and repair the High Temperature Hot Water (HTHW) system on the base.
  • The total aggregate amount ordered under the contract shall not exceed $4,999,999.99.
  • The project involves excavating, repairing, and/or replacing components of the HTHW service lines, distribution lines, sump pumps, and valves.
  • The specifications cover general requirements, security, environmental protection, execution and closeout, and other technical details for the "Repair HTHW Sump Pumps" project.

View the file

Other files for this federal contract opportunity

Other files attached to High Temperature Hot Water System Repair, newest first.
File Type Posted
0_Solicitation - FA462624R00090003 Amend 03.pdf PDF
13_QA_13 Aug 2024 (Amend 3).xlsx XLSX spreadsheet
15_ME1.2 AMENDED (Amend 2).pdf PDF
16_M17.3 AMENDED (Amend 2).pdf PDF
5_Blank Bid Sch (Amend 2).xlsx XLSX spreadsheet
6_MT20240066_ 02 Aug 24_Heavy (Amend 2).pdf PDF
13_QA_6 Aug 2024 (Amend 2).xlsx XLSX spreadsheet
0_Solicitation - FA462624R00090002 Amend 02.pdf PDF
14_ME1.3 AMENDED (Amend 2).pdf PDF
11_ME0.4 AMENDED (Amend 2).pdf PDF
0_Solicitation - FA462624R0009 Amend 01.pdf PDF
9_Subcontractor Consent (Amend 1).pdf PDF
7_Sections L and M - HTHW Requirements (updated 072924 Amend 1).pdf PDF
13_QA_29 Jul 2024 (Amend 1).xlsx XLSX spreadsheet
10_C1.2 AMENDED (Amend 1).pdf PDF
11_ME0.4 AMENDED (Amend 1).pdf PDF
12_M17.4 AMENDED (Amend 1).pdf PDF
6_MT20240066 27 Jun 2024_Heavy.pdf PDF
5_Blank Bid Sch.xlsx XLSX spreadsheet
4B_DRAWINGS - Service Lines BLDG 1464.pdf PDF
8_Past Performance Questionaire.pdf PDF
3B_DRAWINGS - Sump Pumps.pdf PDF
3A_Sheet Index - Sump Pumps.pdf PDF
2A_Submittal Schedule HTHW Sumps.xlsx XLSX spreadsheet
1B_SPECS Service Lines BLDG 1464.pdf PDF
7_Sections L and M - HTHW Requirements.pdf PDF
4A_Sheet Index - Service Lines Bldg 1464.pdf PDF
2B_Submittal Schedule Service Lines 1464.xlsx XLSX spreadsheet
0_Solicitation - FA462624R0009.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 Repair HTHW Sump Pumps Opp #1123678

SPECIFICATIONS INDEX Page i

INDEX OF CONSTRUCTION SPECIFICATIONS

DIVISION 1 - GENERAL REQUIREMENTS

01 00 00 – GENERAL REQUIREMENTS

01 10 00 – SECURITY

01 36 00 – ENVIRONMENTAL PROTECTION

01 70 00 – EXECUTION AND CLOSEOUT REQUIREMENTS

DIVISION 2 – EXISTING CONDITIONS

02 41 00 - DEMOLITION

DIVISION 3 – CONCRETE

03 30 00 – CAST-IN-PLACE CONCRETE

DIVISION 4 – MASONRY

NOT USED

DIVISION 5 - METALS

NOT USED

DIVISION 6 – WOOD & PLASTICS

NOT USED

DIVISION 7 – THERMAL AND MOISTURE PROTECTION

NOT USED

DIVISION 8 – DOORS & WINDOWS

NOT USED

DIVISION 9 – FINISHES

NOT USED

DIVISION 10 – SPECIALTIES

NOT USED

DIVISION 11 – EQUIPMENT

NOT USED

DIVISION 12 – FURNISHINGS

NOT USED

DIVISION 13 – SPECIAL CONSTRUCTION

NOT USED

DIVISION 14 – CONVEYING SYSTEMS

NOT USED

SPECIFICATIONS INDEX Page ii

DIVISION 15 THRU DIVISION 20

DIVISION 21 – FIRE SUPPRESSION

NOT USED

DIVISION 22 – PLUMBING

NOT USED

DIVISION 23 – HVAC

NOT USED

DIVISION 26 – ELECTRICAL

26 00 00 - GENERAL PROVISIONS FOR ELECTRICAL WORK

26 05 19 - LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 26 - GOUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 29 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26 05 43 - UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS

26 05 53 - IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 22 00 - LOW-VOLTAGE TRANSFORMERS

DIVISION 27 – COMMUNICATIONS

NOT USED

DIVISION 28 – ELECTRONIC SAFETY & SECURITY

NOT USED

DIVISION 31 – EARTHWORK

31 23 33 - TRENCH EXCAVATION AND BACKFILL FOR PIPELINES AND

APPURTENANT STRUCTURES

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 10 00 – ASPHALTIC CONCRETE PAVEMENT

32 92 00 – SEEDING AND SODDING

DIVISION 33 – UTILITIES

33 05 23.13 – UTILITY HORIZONTAL DIRECTIONAL DRILLING

33 14 43 –PUMPING SYSTEMS FOR WATER UTILITY SERVICE

DIVISION 34 – TRANSPORTATION

NOT USED

DIVISION 35 – WATERWAY & MARINE

SPECIFICATIONS INDEX Page iii

DIVISION 41 – MATERIAL PROCESSING & HANDLING EQUIPMENT

DIVISION 44 – POLLUTION & WASTE CONTROL EQUIPMENT

NOT USED

DIVISION 46 – WATER & WASTEWATER EQUIPMENT

- END -

ATTACHMENT 01

Repair HTHW Sump Pumps

Opportunity #1123678

GENERAL REQUIREMENTS 01 00 00 - 1

SECTION 01 00 00

GENERAL REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY OF WORK

A. Project titled: “Repair HTHW Sump Pumps, Project #1123678" consists of life-cycle upgrades to the existing sump pump systems, which are failing under extreme operating environmental conditions. The HTHW system sump pumps remove incidental water that enters the buried distribution utility tunnels and collects at low points around the system. These low points occur at this project’s sump basins as well as at valve stations, where water collected is pumped out to the storm drain system. This project will remove all existing equipment from existing sump basins and replace with new. This includes replacing the existing pumps with high temperature rated models, a new level detection system, new system controls, control enclosures, and new low-voltage electrical power feeds to the individual sump pump sites.

1.2 UTILITIES

A. All reasonable quantities of utilities will be made available from existing utilities to the Contractor without charge. Any temporary connection or lines that may be required will be installed, maintained, and removed by the Contractor at his own expense and in such a manner satisfactory to the Contracting Officer. Removal of such connections or lines will be accomplished prior to final acceptance of the construction. The Contractor shall provide any necessary portable power.

1.3 SAFETY

A. The Contractor shall comply with all existing Occupational Safety and Health Act (OSHA) standards of safety at all times in the performance of this contract.

Hazards to the safe use of the premises due to the Contractor’s work and/or equipment shall be suitably marked at all times. Pedestrian and vehicle traffic ways shall be kept clear and unobstructed.

B. The HTHW manholes where the sump pumps are currently installed are Confined Spaces. As such, the Contractor is responsible for compliance with OSHA

1910.146 Permit-required confined spaces to include air sampling and monitoring, which will NOT be provided by MAFB personnel in support of this work. Coordinate commencement of confirmed space entrances with the MAFB Construction Inspector 14 days prior to the start of work.

PART 2 - PRODUCTS

Not applicable.

GENERAL REQUIREMENTS 01 00 00 - 2

PART 3 - EXECUTION

3.1 INSPECTION

A. There will be one primary Contracting Officer's Representative assigned to inspect for compliance. An alternate Contracting Officer's Representative will also be assigned and will perform all inspection duties in the absence of the primary Contracting Officer's Representative. The Contracting Officer's Representative will be the spokesman for compliance with the specifications and drawings. Controversies between the Contracting Officer's Representative and the Contractor will be resolved by the Contracting Officer. If, for some reason, a change in the primary or alternate Contracting Officer's Representative is required, the Contractor will be notified. The Contractor shall coordinate Contractor activities with Construction Management.

3.2 CONTRACTOR VEHICLES AND EQUIPMENT

A. The Contractor shall provide all vehicles and equipment necessary to accomplish the contract work. Power equipment shall be equipped with safety and noise limiting devices. The equipment shall be in a safe and efficient operating condition. The Contractor shall not park vehicles in the project area during non working hours. A designated parking area for vehicles and equipment will be provided. Vehicles will not be allowed on lawns or sidewalks without prior written approval. All equipment will be clearly marked with the Company name.

B. Truckload Limits: The following load limits shall apply to all contractor-operated equipment on this project:

April 1 to June 1 -- 350 #/inch width of tire All Other Times -- 400 #/inch width of tire

3.3 CONTINUED USE OF FACILITIES

A. Building, structures, facilities, and utilities will continue in use by the Government during this contract. The Contractor shall notify the Contracting Officer’s Representative (Construction Contracting Officer's Representative and/or Contract Specialist) when a no-work condition will occur for more than one day by the Contractor or sub-contractors (except weekends and federal holidays).

3.4 MAINTENANCE OF AIR FORCE OPERATIONS

A. It is required and essential that the primary use of the facilities continue uninterrupted throughout the contract period. Work, once commenced, shall be carried to completion with a minimum of interruption to Government operations.

3.5 AS-BUILT FIELD DATA

GENERAL REQUIREMENTS 01 00 00 - 3

A. General: The Contractor shall keep at the construction site a complete set of full size prints of the contract drawings, reproduced at Contractor expense. During construction, these prints shall be marked to show all deviations in actual construction from the contract drawings. The color red shall be used to indicate all additions and green to indicate all deletions. The drawings shall show the following information but not be limited thereto:

1. The locations and descriptions of any utility line and other installations of any kind or description known to exist within the construction area. The location includes dimensions to permanent features, and depth.

2. The locations and dimension of any changes within the building or structure, and the accurate location and dimension of all underground utilities and facilities.

3. Correct grade or alignment of roads, structures, and utilities if any changes were made from contract plans.

4. Correct elevations if changes were made in site grading from the contract plans.

5. Changes in details design or additional information obtained from working drawings specified to be prepared and/or furnished by the Contractor including, but not limited to, fabrication, erection, installation, and placing details, pipe size, pipe material, insulation material, dimensions of equipment foundations, etc.

6. The topography and grades of all drainage installed or affected as part of the project construction.

7. All changes or modifications from the original design and from the final inspection.

8. Where contract drawings or specifications allow options, only the option actually used in the construction shall be shown on the as-built drawings.

The option not used shall be deleted.

9. These deviations shall be shown in the same general detail utilized in the contract drawings. Marking of the prints shall be pursued continuously during construction to keep them up-to-date. In addition, the Contractor shall maintain full size mark-up drawings, survey notes, sketches, nameplate data, pricing information, description, and serial numbers of all installed equipment. This information shall be maintained in a current condition at all times until completion of the work. The resulting field-marked prints and data shall be referred to and marked as “As-Built Field Data,” and shall be used for no other purpose. They shall be made

GENERAL REQUIREMENTS 01 00 00 - 4

available for inspection by the Contracting Officer’s representative whenever requested during construction and shall be jointly inspected for accuracy and completeness by the Contracting Officer’s representative and a responsible representative of the Contractor prior to submission of each pay estimate. If the As-Built Field Data is not accurate and complete, a percentage of the pay request will be withheld from the payment and any future payments until the As-Built Field Data is up to date, complete and accurate. The Contracting Officer will determine the percentage to be retained.

B. Submittal of the As-Built Field Data: The As-Built Field Data shall reflect the exact installation performed and two copies shall be submitted to the Contracting Officer for review and approval a minimum of three calendar days prior to the date of final inspection. If review of the preliminary as-built drawings reveals errors and/or omissions, the drawings will be returned to the Contractor for corrections. The Contractor shall make all corrections and return the drawings to the Contracting Officer within 10 calendar days of receipt. The “Red LINE” drawings shall be reviewed at the final inspection for completeness. Once As- Built Field Data have been reviewed and approved one copy will be returned to the contractor with and electronic copy of contract drawings. The electronic contract drawings will be updated with the field data by the contractor and submitted to the Contracting Officer.

C. Preparation--As-Built Contract Drawing, Non AutoCAD Original Record

Tracing:

1. Approved preliminary as-built drawings will be returned to the Contractor along with one set of the contract drawing original record tracings. These drawings are part of the permanent records of this project and the Contractor will be held responsible for their protection and safety until they are returned to the Contracting Officer. Any drawings damaged or lost by the Contractor shall be satisfactorily replaced in like medium, quality and size as the originals at the Contractor’s expense. The drafting work shall be performed by certified Engineering Technicians and/or individuals with a minimum of five years drafting experience. The name and qualifications of these individuals shall be submitted in writing to the Contracting Officer for approval.

2. Drafting of the data onto the original contract drawing shall be done in a quality equal to that of the originals. Linework, lineweights, and lettering, and use of symbols shall be the same as the original line work, line weights, and lettering, and symbols. All revisions shall be noted in revision block with revision symbol in chronological sequence. This symbol shall also be placed on drawing where revision was made. Plastic drafting leads or ink shall be used. Graphite leads shall only be used where used on the original drawings. If additional drawings are required, GENERAL REQUIREMENTS 01 00 00 - 5 they shall be prepared on the same medium and of equal size and quality as the original record tracings. Sufficient blank sheets for this purpose will be furnished by the government at no cost to the Contractor upon request. When final revisions have been completed, each drawing shall be lettered or stamped with the words “As-Built” in block letters at least 3/8 inch high placed above the title block of space permits, or if not, below the title block between the border and the trim line. The date of completion and the words “REVISED AS-BUILT” shall be placed in the revision block above the latest revision notation. Markings on the reverse side of the drawings will not be permitted. The submittal shall include the approved “Red Line” drawings and the revised original record drawings as stated above.

D. Preparation--As-Built Contract Drawings, AutoCAD Original Record Tracing:

1. Approved preliminary as-built drawings will be returned to the Contractor along with AutoCAD CD (Release 2014) of the original drawings. All work on the CD will be accomplished by a Certified Engineering Technician and/or individuals with a minimum of five years drafting experience, at least three of which must be using AutoCAD. The name of the individual shall be submitted in writing to the Contracting Officer.

2. Modifications to the CD shall be accomplished on the appropriate layer showing the work being changed. All revisions shall be done in the same format as the original drawing. On each sheet the words “AS BUILT” in block letters will be added to the discs. The size of the letters will be at least 3/8 inch high and be placed either above the title block or to the left of the title block. Fill in the revisions block with “REVISED AS-BUILT”, date and initials. The submittal shall include the revised AutoCAD CD, the approved “Red Line” drawings and a full size plot of the drawings from the revised CD.

E. Preparation--As-Built Contract Drawing, Both AutoCAD and Non AutoCAD

Original Record Drawings:

1. Approved preliminary as-built drawings will be returned to the Contractor.

These drawings are part of the permanent records of this project and the Contractor will be held responsible for their protection and safety until they are returned to the Contracting Officer. Any drawings damaged or lost by the Contractor shall be satisfactorily replaced in like medium, quality and size as the originals at the Contractor’s expense. The drafting work shall be done by a certified Engineering Technician and/or other individual drafting experienced and on AutoCAD.

2. For Non AutoCAD drawings, drafting onto the contract drawing original mylar record tracings shall be done in a quality equal to that of the

GENERAL REQUIREMENTS 01 00 00 - 6

originals. Linework, lineweights, lettering and use of symbols shall be the same as the original. All revisions shall be noted in the revision block with revision symbol in chronological sequence. This symbol shall also be placed on drawing where revision was made. Plastic drafting leads or ink shall be used. Graphite leads shall only be used where used on the original drawings. Additional drawings, if required shall be the same format, size and quality as provided on the AutoCAD CD. The additional drawings will be added to the CD provided.

3. For AutoCAD drawings, modifications to the CD shall be accomplished on the appropriate layer showing the work being changed. All revisions shall be done in the same format as the original drawing.

4. When the final revisions have been completed, each drawing shall be lettered or stamped, for original record tracings and lettering added to the CD with the words “AS-BUILT” in block letters at least 3/8 inch high.

The lettering shall be place either above the title block or to the left of the title block. The words “REVISED AS-BUILT” shall be placed in the revision block along with the date of completion and the initials of the reviser. The submittal shall include the approved “Red line” drawings, the revised original record tracings, the revised AutoCAD CD and a print of the drawings from the revised CD.

F. The final as-built submittal shall be completed and returned together with the approved preliminary as-built drawings to the Contracting Officer within 30 calendar days of the final inspection. The Contracting Officer will review all final as-built record drawings for accuracy and conformance to the drafting standards and other requirements contained herein. The submittal shall be returned to the Contractor if corrections are necessary. The Contractor shall make all corrections and shall return the submittal to the Contracting Officer within seven calendar days of receipt.

1. All costs incurred by the Contractor in the preparation and furnishing of as-builts shall be included in the contract price and no separate payment will be made for this work. Approval and acceptance of the final as-built record drawings shall be accomplished before final payment is made to the Contractor.

2. In addition to the above requirements, one set of marked-up as-built blueprints shall be furnished to the Contracting Officer at the time of system acceptance testing. These as-built blueline prints shall be in addition to the requirements stated for the submission of the Operation and Maintenance Manuals.

3.6 CONCEALED WORK

GENERAL REQUIREMENTS 01 00 00 - 7

A. All items of work to be concealed shall be Government inspected prior to concealment.

3.7 OPERATING AND MAINTENANCE INSTRUCTIONS

A. One complete set of instructions, in post-form binders, containing the manufacturer’s operating and maintenance instructions for all equipment shall be furnished to the Contracting Officer. In addition, (2) CD-ROM discs containing the same information as the hard copy shall be provided. Where information or instructions are included for more than one model, the Contractor shall clearly mark the model actually installed on the job. The manuals shall be sectionalized using dividers with labeled tabs identifying the product/item behind the dividers.

One complete set shall be furnished at the time test procedures are submitted, and the remaining sets shall be furnished before the contract is completed. Furnishing operating and maintenance instructions does not relieve the Contractor of the responsibility of furnishing framed instructions and schematics where specified.

Each binder shall be indelibly marked on the exterior front and edge with the project name, project number, contract number, name of contractor and the date.

3.8 CONTRACTOR FURNISHED EQUIPMENT DATA

A. Ten days prior to final inspection and acceptance of work, the Contractor shall submit the following data:

1. Equipment List: An itemized equipment list showing unit retail value and nameplate data including serial number, model number, size, manufacturer, etc., for all Contractor furnished electrical and mechanical equipment installed under this contract. A sample form showing minimum data required is provided at the end of this section.

2. Guarantees: Provide a list of all equipment items which are specified to be guaranteed, accomplished by a copy of each specified guarantee therefore. For each specific guaranteed item on the list shall include the name, address, and telephone numbers of the subcontractor who installed the item, the supplier, or distributor and the manufacturer. The completion data of the guarantee period shall correspond to the applicable specification requirements for each guarantee item.

3.9 RESERVED

3.10 SHOP DRAWINGS

A. Shop drawings will include specially prepared technical data for this project and will consist of drawings, diagrams, performance curves, schedules, calculations, measurements, and will expand the general application to this specific project.

Shop drawings show complete and accurate descriptions of specific equipment or

GENERAL REQUIREMENTS 01 00 00 - 8

systems to be installed. This will include detailed drawings showing routings, material types, installation and anchoring methods, component sizes, mounting methods, spacing, interface with existing systems, wiring and electrical systems, and all other details associated with the installation.

3.11 START OF WORK NOTIFICATION

A. The Contractor shall notify the Construction Management (CM) Office and the Contracting Officer 21 working days in advance of the start of all work. This shall include, but is not limited to, notifying CM when the initial work shall begin; notifying CM when work shall resume after a work stoppage of more than five work days; notifying CM when work shall begin following the end of all specified exclusion periods. The Contractor shall be aware that the Notice to Proceed is not sufficient notification to the CM when initial work will begin.

3.12 NOTICE OF PRE-FINAL AND FINAL INSPECTIONS

A. The Contractor shall, after notifying the Construction Contracting Officer's Representative 14 days prior, schedule a date with the Contracting Officer for a pre-final inspection. After all discrepancies found during the pre-final inspections have been corrected, the Contractor shall schedule a final inspection with the Contracting Officer 14 days prior to his projected completion of the project. The red line “As-Built” drawings shall be provided by the Contractor at the final inspection.

3.13 CONSTRUCTION NEAR UTILITY SYSTEMS

A. All contractors shall be responsible for processing their own Work Clearance Request (AF Form 103) and coordinating with Government Contracting Officer's Representatives as required. The contractor is responsible for obtaining all coordination signatures for the permit. The approved permit shall be valid for a period not to exceed 90 calendar days. To the maximum extent possible, eliminate permanent markings on pavement and curbs. The contractor shall be responsible for maintaining all utility markings. Location marks shall be removed after 14 calendar days if not used. All markings shall be accomplished with water-based chalk (Aervoe Pacific Inc. 1-800-227-0196 or equal). No paints will be used. Detailed permit procedures and guidelines shall be provided to the contractor during the Pre-performance Conference. Digging within three feet of buried communications cables, environmental monitoring wells, electrical cables, irrigation systems, and gas lines shall be performed by hand digging until the utility is exposed. The Project Contracting Officer's Representative shall be notified three days prior to digging within a three-foot area near this utility.

Request a representative from the Communications Office must be present during excavation of Communications Cables. The cable routes must be marked prior to excavation in the area. The Contractor shall be held responsible for any damage to

GENERAL REQUIREMENTS 01 00 00 - 9

a marked or identified utility by excavation procedures. Once the utility is exposed, mechanical excavation may be used if there is no chance of damage occurring to the cable or piping system. The contractor is responsible for marking all excavations he will do, five (5) work days prior to needing existing utilities marked by the government.

B. Reburial of Exposed Utilities: When existing utility lines are reburied, a tape, detectable by pipe detector systems, shall be installed above the uncovered length of the utility at a depth of 12 inches below grade. Tape shall be a minimum five mil plastic tape with metallic tracer, minimum six inches wide, lettering on tape continuously marked “BURIED UTILITY”, and brightly colored. If tape marked “BURIED UTILITY” is not readily available, special order tape with the correct lettering shall be acquired by the contractor.

C. Access to Communications Manhole or Handhole: No communications manhole or handhole shall be entered without first obtaining a fiber optic cable briefing.

Coordinate through Construction Management with the Base Communications Officer.

D. All repairs due to cable cuts on communications cables shall be the responsibility of the Contractor. Repair actions must be accomplished by the current communications contractor and paid for and coordinated under this contract at no additional cost to the Government if the contractor is deemed to be at fault by the Contracting Officer. Work to restore lost service must begin within one hour after the cut and must continue unceasingly until the job is completed, tested, and accepted. Work will be inspected by Communications Squadron and personnel.

E. All utilities or anticipated underground obstacle crossings must be located by manual and other non-destructive excavation (hydro-vac) prior to mechanical excavation. All non-destructive excavation shall be considered incidental to project completion.

3.14 UTILITY OUTAGES

A. All utilities programmed to be interrupted during construction shall be scheduled at least 21 working days in advance of the outage and at a time convenient for the government. The “Utility Outage Notice” will be completed by the Contractor and submitted to Construction Management for approval. No interruptions shall be made until the outage notice is approved and returned to the Contractor.

Notification forms that are to be filled out by the contractor, will be provided at the pre-construction conference. Utilities will include all overhead and underground utilities and road closures or partial closures.

3.15 SUBMITTALS

GENERAL REQUIREMENTS 01 00 00 - 10

A. Contractor shall submit three copies of all submittals, to be recorded on AF Form

66. Submittal items, including samples, shall be marked with a number corresponding to the item number on the AF Form 66, and the page and paragraph number of the specification requiring the submittal. Contractor shall hi-lite specifics when submitting catalogs, etc. It is the responsibility of the contractor to complete column 13, “Required Submission Date”, in the submittal form and insert dates for each submittal item not already designated by the Government as having a mandatory due date. The contractor shall schedule and submit all required items for major systems (such as HVAC, etc) at the same time to enhance review of interrelated components. It is the Contractor’s responsibility to ensure the dates provided on the form do not create any delays in construction.

Provide the completed form to the Contracting Officer at or prior to the Pre- Construction meeting. The completed form will then be used by the Government for tracking submittal progress. If the contractor is proposing to use an exact brand name or product identified, a submittal for that item is not required.

In lieu of a submittal, the contractor shall submit a letter to the Contracting Officer outlining each item that will be provided exactly as specified. These items will also be annotated as such on the AF Form 66. Even though a specified product is provided, in some circumstances a submittal may still be required for color selection, etc. If a recycle initiative product is specified and the contractor wishes to provide a substitute product, the Contractor shall request the substitution as indicated in paragraph 3.28 of this Section.

3.16 CONTRACTOR STORAGE AREA AND WORK SITE

A. Prior to notice to proceed, Contractor will be provided a storage area on the base within three miles of the project site or as designated on the site plan. All contractor equipment and materials shall be stored in this area except for materials that will be used on the job within a 48-hour period. The Contractor storage area may not be directly adjacent the work area, and work areas need to be minimized to the best extent possible. Contractor is responsible for the security of assigned storage area (3,000 S.F., more or less). Temporary storage buildings (excluding tractor trailers) sited in the storage area shall conform to the base color scheme (Antique Linen, Fed. No. 23578). Architectural and structural features of all temporary facilities (including tractor trailers) shall be maintained in good repair as required by the Contracting Officer. Storage areas shall be enclosed by 6’ chain link fence with access gates. Spare keys to any locked gates shall be provided to the base fire department dispatch office. Storage areas and job sites shall be clean, orderly, and free of debris, demolished/excess materials, etc. Job sites will be cleaned daily, and refuse and debris removed from the site. Fences will be maintained. Grass and weeds shall be cut weekly at the storage area and work site. All landscaping, trees and shrubs will be protected, irrigated, and maintained. If irrigation system to an existing area is interrupted due to construction activities, the Contractor shall provide a means of temporary irrigation until the permanent system is operational. If at any time during the life of the contract, the Contracting Officer determines that base standards are not

GENERAL REQUIREMENTS 01 00 00 - 11

being met, he/she may direct the Contractor to perform such actions as necessary to bring the area and/or facilities up to base standards at no additional cost to the Government. If the contractor fails to bring the area and/or facilities up to standards, the Contracting Officer may direct the Contractor to remove themselves and/or the facility/storage unit or materials from the base at no cost to the Government.

3.17 REPAIR OF ROAD CUTS

A. Asphaltic surface shall be completely in-place within 48 hours after placement of base gravel. Between placement of base gravel and pavement, road shall be kept in drivable and passable condition.

3.18 QUALITY CONTROL

A. General. THE CONTRACTOR IS RESPONSIBLE FOR QUALITY CONTROL

WHICH IS CONSIDERED BY THE GOVERNMENT TO BE A MAJOR

INSPECTABLE ITEM OF THIS CONTRACT. In addition to CONTRACT CLAUSE, INSPECTION OF CONSTRUCTION, the Contractor shall comply with the Quality Control Provisions as specified herein. The Contractor shall perform all Quality Control inspection and/or testing required by this contract unless specifically designated to be performed by the Government. The Quality Control system must consist of personnel, plans, procedures, and organization necessary to provide materials, equipment, workmanship, fabrication, construction, and operations which comply with contract requirements. The system shall cover construction operations, including fabrication both on-site and off-site, and shall be keyed to the proposed construction sequence. If the Contractor fails to submit an acceptable Quality Control Plan within the time herein prescribed, the Contracting Officer will refuse to allow construction to start.

B. Quality Control Plan: General: Prior to the start of construction, the Contractor’s

Quality Control Plan must be acceptable to the Government. Construction will be permitted to begin only after acceptance of the contractor’s Quality Control Plan.

The Contractor’s Quality Plan shall identify the personnel, procedures, instructions, records, forms, and as a minimum, shall include the following:

1. A description of the Quality Control management organization including an organizational chart.

2. The number, classifications, qualifications, duties, responsibilities, and authorities of personnel: A copy of a letter, signed by an authorized official of the firm, which describes the responsibilities and delegates the authorities of the Quality Control manager shall be furnished. The Quality Control manager must have a minimum of five years of documented

GENERAL REQUIREMENTS 01 00 00 - 12

experience in the primary areas of construction included in this contract.

Include qualifications in the submitted plan for Government approval.

This contract does not require a full time Quality Control Manager. The individual assigned may have other duties within the contractor’s organization but must commit, as a minimum, an average of two hours per day towards fulfilling the QC requirements of this section. Hours dedicated to this function will be annotated on the submitted QC records.

a) The Contractor’s Quality Control activities to be performed, include those of subcontractors, off-site fabricators, and suppliers.

A job specific detailed work item list for inspection purposes will be developed by the contractor. The list will be broken into sections identical to the contract specifications and will contain all inspection actions necessary to ensure full compliance with the contract. A sample from a simplified and generic project is included as Attachment 1 to indicate the level of detail expected in this checklist.

b) Quality Control testing procedures including corrective actions to be taken where non-compliance is noted by the Quality Control Manager.

c) Documentation format for Contractor’s Quality Control activities and testing. The attached form is to be used for documenting daily inspections, corrective actions, etc.

d) Procedures for ensuring As-Builts are accurate and updated daily.

e) Safety program that ensures complete compliance with OSHA and the U.S. Army Corps of Engineers manual EM 385-1-1, Safety Health Requirements Manual. Any non-compliance issues are the responsibility of the Contractor and not the Government.

f) Methods to ensure scheduled appointments are met and documentation to verify arrival and departure times at the work site.

g) A listing of all required electrical testing and operational tests.

C. Acceptance: The Quality Control Plan will be reviewed and approved, if acceptable, by the Contracting Officer. The Contractor shall make such changes and additions necessary for clarity and completeness as requested by the Contracting Officer. Acceptance is conditional and the Government reserves the right to require the Contractor to make changes in the Quality Control Plan, personnel, and operations to correct deficiencies found by the Government during

GENERAL REQUIREMENTS 01 00 00 - 13

performance of work. No change shall be implemented prior to acceptance in writing by the Contracting Officer. Non-compliance with the Quality Control Plan will result in one or more of the following actions at the Government’s discretion:

1. Directed removal and replacement of the QC Manager.

2. Cure notices and other applicable contracting actions up to and including possible contract termination for default.

3. Other contractual actions deemed appropriate by the Contracting Officer.

A. Quality Control Records: The Quality Control Records shall contain a record of daily inspections for all work accomplished. Specific items of work checked each day will be annotated. All work-in-place must be certified as complying with the contract plans and specifications. Non-compliance items must be clearly noted.

Corrective actions must be outlined and detailed for non-compliance items. The Contractor shall maintain daily records, which will be on-the-job site and available for review by the Contracting Officer or his technical representative.

Daily reports will be signed by the designated Quality Control Manager and will indicate hours spent on Quality Control that day. A copy of the QC daily reports shall be given to Construction Management by noon on the following day.

B. Submittals: The contractor will submit three copies of the proposed Quality

Control Plan for acceptance not more than 10 days after Award. No work will start until acceptance is made by the Contracting Officer. No exceptions will be provided to this requirement.

3.19 CONTRACT PROGRESS SCHEDULE AND REPORT

A. Contractor shall complete Project Schedule Form 3064 the 1st and 15th of each month, starting after the Notice to Proceed until Final Acceptance. The project schedule is required to be delivered to the Contracting Officer for review and approval prior to the start of work. Work may not commence until the project schedule is approved unless the Contracting Officer waives the requirement.

B. Contractor shall complete Progress Report Form 3065 and submit to the

Contracting Officer every two weeks, starting at the Notice to Proceed until Final Acceptance. The Progress Report shall mirror the intervals approved on the Project Schedule.

3.20 1354 CHECKLIST

A. Contractor shall complete the Property Inventory checklist and submit it to the Contracting Officer 10 days prior to final inspection. Prior to completing the Form 1354 checklist, the Contractor shall request assistance from the Resource

GENERAL REQUIREMENTS 01 00 00 - 14

Management Flight. The checklist will be delivered to the Contractor at the Preconstruction conference.

3.21 WORK SCHEDULE

A. Working hours for the Contractor will normally be between the hours of 7:45 a.m.

and 4:15 p.m. excluding Saturdays, Sundays, and Federal Holidays. With prior government approval, the Contractor may work 4-10 hour days per week, Monday through Thursday or Tuesday through Friday. If the Contractor desires to work during periods other than above, additional government inspection forces may be required. The Contractor must notify the Contracting Officer three days in advance of his/her intention to work during other periods to allow assignment of additional inspection forces when the Contracting Officer determines that they are reasonably available. If such force is reasonably available, the Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days.

B. Weekly construction meetings may be held throughout the duration of the project at a time and place specified in the Pre-construction Conference.

C. Note: 72 hours notice must be given for material deliveries, when a government representative is required for escort.

3.22 NUCLEAR DENSOMETERS

A. The use of nuclear densometers or other devices containing radioactive elements on Malmstrom AFB is controlled for safety and management purposes. The contractor must have proof of a Nuclear Regulatory Committee (NRC) permit for its use. The Contractor must also keep all radioactive equipment locked up when not in use and remove it from the base at completion of the work day. All projects requiring use of radioactive devices will be required to submit, for approval 30 days prior to use, the following information for review by the Base Radiation Safety Officer in (341 MDOS/SGOAB, Fax 406 731-2469):

1. Brief description of proposed activity.

2. Copy of current NRC or Agreement State License with NRC form 241

3. Name, address, phone number of responsible local representative and

Radiation Safety officer (RSO) named on their license.

4. Copy of part of the Air Force Contract describing work to be done and inclusive dates of the work.

5. An acknowledgement that the installation RSO can make periodic checks on use of the equipment.

GENERAL REQUIREMENTS 01 00 00 - 15

3.23 REFERENCES

A. All references listed in these specifications are intended to be the current version or edition.

3.24 ENERGY EFFICIENT PRODUCTS

A. All equipment supplied under this contract that requires energy usage shall be ENERGY STAR compliant.

B.

3.25 ANTI-TERRORISM (AT) AWARENESS TRAINING

A. Anti-Terrorism (AT) Awareness Training: In accordance with DoDI O-2000.16v1_DAFI 31-145-O, Antiterrorism (AT) Program Implementation, ensure Level I – AT Awareness Training is completed by all personnel within 30 days of requiring access, and annually thereafter. The training will be provided by the Government. The objective of the training is to provide personnel with requisite knowledge necessary to remain vigilant and enable employment of AT tactics, techniques, and procedures. This training will be conducted by Malmstrom AFB 341st Contracting Squadron, by providing a written pamphlet for review.

3.26 FORCE PROTECTION

A. Contractor personnel are required to abide by all real world Force Protection Condition

(FPCON) measures, random anti-terrorism measures (RAMs), shelter-in-place orders, evacuations and lock-down notices as directed. Examples include mandatory badge or ID checks, facility single points-of-entry and searches of hand carried items.

3.27 PICTURES ON ANY DoD FACILITY

A. No pictures shall be allowed of any government property or component, which includes pictures of government property, from non-government property (EX: pictures of buildings physically on Malmstrom AFB, from exterior private property adjacent base perimeter), without prior consent from Malmstrom 341st Contracting Squadron. Any photograph, sketch, picture, drawing, map, or graphical representation of US Government property to include: facilities, aircraft, components, equipment, or other resources, is prohibited without first obtaining permission from the government (e.g. Security Forces convoys, Helicopters, Entry Control Points, etc.)

END OF SECTION 01 00 00

SECURITY REQUIREMENTS 01 10 00-1

SECTION 01 10 00

SECURITY REQUIREMENTS

PART 1 – CONDUCT OF WORK

1.1 COORDINATION AND ACCESS TO SITE

Coordination with using agencies shall be made through the Contracting Officer to assist the Contractor in completing the work with a minimum of interference and inconvenience.

1.2 FIRE REGULATIONS

Contractor shall comply with base fire regulations and NFPA 241 Building Construction and Demolition requirements. Contractor shall provide adequate fire extinguishers for the construction site and remove them upon acceptance of the facility.

1.3 GENERAL AREA REQUIREMENTS

Security requirements and procedures shall be coordinated with the 341 Security Forces Squadron, Resource Protection (telephone 406-731-4344), Malmstrom AFB. Activities of the Contractor and Contractor's employees and subcontractors and their employees while on the base, will be conducted in accordance with base regulations, including those of the fire marshal, as well as security directives. This includes, but is not limited to, obtaining a Work Clearance Request (AF Form 103) before any digging and yielding to alert vehicles during alerts if located on a marked alert route. Security directives include Antiterrorism Force Protection (paragraph 1.3.5 below) and the GENERAL CONTRACTING ENTRY AUTHORITY LIST attached the end of this Section. This list shall include all Contractor personnel working on the base.

1.3.1 Not used.

1.3.2 Identification Credentials: The Contractor shall furnish an Entry Authority List

(EAL), attached, of employees needing access on base to the Base Contracting Officer. Employees without a badge and identification in their possession will be denied access to the base and work areas. All security issues will be discussed during the preconstruction conference. Note that it may take up to 14 calendar days after submitting EAL to be cleared to receive badge. In order to obtain a badge the contractor shall provide a driver's license or state identification card issued by a Real ID Act compliant state, a passport, or a passport card. For information regarding Real ID Act compliant states for driver's licenses and state identification cards, refer to the Department of Homeland Security information site at dhs.gov/current-status-states-territories. Current vehicle registration, proof of insurance, and Driver's License are required for vehicle passes. The Contractor shall notify the Contracting Officer of all losses of passes, within 48 hours after the

SECURITY REQUIREMENTS 01 10 00-2

loss, by name and address. Employees who have terminated employment or who have been dismissed must surrender their personnel and vehicle passes to the Contracting Officer immediately. Employees without a personnel or vehicle pass in their possession will be denied access to the base and work areas and may be subject to detainment until proper identification is made. The passes shall not be worn or displayed off the military base.

1.3.3 Commercial or company vehicles will be allowed access to the base provided company emblems are attached to the sides of the vehicles.

1.3.4 Equipment and storage areas: See specification Section 01 00 00 GENERAL

REQUIREMENTS, 3.16 Contractor Storage Area.

1.3.5 Antiterrorism Force Protection all personnel are required to abide by all real world

FPCON measures, RAMs, shelter-in-place, evacuations, lock-down notices as directed (i.e. mandatory badge / ID check, hand carried items will be searched, etc). During the course of this contract, the Base may be under Force Protection Conditions (FPCONS). FPCONS are as follows:

FPCON NORMAL: FPCON NORMAL applies at all times as a general threat of terrorist attacks, hostile acts, or other security threats always exists in the world.

FPCON ALPHA: FPCON ALPHA applies to a non-specific threat of a terrorist attack or hostile act directed against DoD elements and personnel.

FPCON BRAVO: FPCON BRAVO applies when an increased or more predictable threat of a terrorist attack or hostile act exists and is directed against DoD elements and personnel.

FPCON CHARLIE: FPCON CHARLIE applies when a terrorist or hostile act incident occurs within the commander's area of interest (AOI), or intelligence is received indicating a hostile act or some form of terrorist action or targeting against DoD elements, personnel, or facilities is likely. FPCON CHARLIE measures will very likely affect missions and base support.

FPCON DELTA: FPCON DELTA applies when a terrorist attack or hostile act has occurred or is anticipated against specific installations or operating areas.

If the Contractor should notice anything suspicious during the course of his work, the Contractor should contact the 911 Dispatch Center at 406-731-3895 as soon as possible.

Point of Contact for FPCON conditions/actions is 341st Missile Wing AT/FP Section, phone 406-731-2634/4930.

SECURITY REQUIREMENTS 01 10 00-3

1.4 CONSTRUCTION AND STAGING AREA FENCE

Not used.

1.5 MOTORIZED EQUIPMENT

1.5.1 Truck Load Limits

Not used.

1.6 PROTECTION OF GOVERNMENT PROPERTY

In addition to requirements of the CONTRACT CLAUSES, Contractor shall protect all Government property within the buildings in which he is working, except for such property as is required to be demolished. Property that is to be demolished shall be protected until its scheduled demolition time. Protection shall include, but not be limited to, protection from construction generated dust, debris, water, and vibration.

PARTS 2 AND 3 (NOT USED)

Attachment follows: General Contracting Entry Authority List

END OF SECTION 01 10 00

SECURITY REQUIREMENTS 01 10 00-4

EXECUTION AND CLOSEOUT

REQUIREMENTS

01 70 00 - 1

SECTION 01 70 00

EXECUTION AND CLOSEOUT REQUIREMENTS

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Examination, preparation, and general installation procedures.

B. Pre-installation meetings.

C. Cutting and patching.

D. Cleaning and protection.

E. Starting of systems and equipment.

1.2 RELATED REQUIREMENTS

A. Section 02 41 00 - Demolition: Demolition of whole structures and parts thereof;

site utility demolition.

1.3 SUBMITTALS

A. Demolition Plan: Submit demolition plan as specified by OSHA and local authorities.

1. Indicate extent of demolition, removal sequence, bracing and shoring, and location and construction of barricades and fences. Include design drawings and calculations for bracing and shoring.

2. Identify demolition firm and submit qualifications.

3. Include a summary of safety procedures.

B. Cutting and Patching: Submit written request in advance of cutting or alteration that affects:

1. Structural integrity of any element of Project.

2. Integrity of weather exposed or moisture resistant element.

3. Efficiency, maintenance, or safety of any operational element.

01 70 00 - 2

4. Visual qualities of sight exposed elements.

5. Work of Government or separate Contractor.

C. Project Record Documents: Accurately record actual locations of capped and active utilities.

1.4 PROJECT CONDITIONS

A. Grade site to drain. Maintain excavations free of water. Provide, operate, and maintain pumping equipment.

B. Protect site from puddling or running water. Provide water barriers as required to protect site from soil erosion.

C. Perform dewatering activities, as required, for the duration of the project.

D. Ventilate enclosed areas to assist cure of materials, to dissipate humidity, and to prevent accumulation of dust, fumes, vapors, or gases.

E. Erosion and Sediment Control: Plan and execute work by methods to control surface drainage from cuts and fills, from borrow and waste disposal areas. Prevent erosion and sedimentation.

1. Minimize amount of bare soil exposed at one time.

2. Provide temporary measures such as berms, dikes, and drains, to prevent water flow.

3. Construct fill and waste areas by selective placement to avoid erosive surface silts or clays.

4. Periodically inspect earthwork to detect evidence of erosion and sedimentation; promptly apply corrective measures.

1.5 COORDINATION

A. Coordinate scheduling, submittals, and work of the various sections of the Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements, with provisions for accommodating items installed later.

B. Notify affected utility companies and comply with their requirements.

01 70 00 - 3

C. Verify that utility requirements and characteristics of new operating equipment are compatible with building utilities. Coordinate work of various sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment.

D. Coordinate space requirements, supports, and installation of mechanical and electrical work that are indicated diagrammatically on drawings. Follow routing indicated for pipes, ducts, and conduit, as closely as practicable; place runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.

E. Coordinate completion and clean-up of work of separate sections.

PART 2 PRODUCTS

2.1 PATCHING MATERIALS

A. New Materials: As specified in product sections; match existing products and work for patching and extending work.

B. Type and Quality of Existing Products: Determine by inspecting and testing products where necessary, referring to existing work as a standard.

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work. Start of work means acceptance of existing conditions.

B. Verify that existing substrate is capable of structural…