Summary of Changes -- Amendment 1
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4626-19-R-A015
Replace UST Spill Buckets
Amendment 01
Changes to specifications (Attch 1):
Added: 01 00 00-5, Paragraph 1.17:
“After the OPW 71SO overfill prevention has been installed, Contractor shall provide government with the manufacturer verification checklist that documents the 95% shut-off at the time of installation.”
Changes to submittal schedule (Attch 2):
Added: Division 01 - General Requirements:
Line # 1, 01 00 00, 1.1.7 OPW 71SO Manufacturer Install Verification Checklist.
Changes to project drawings (Attch 4):
Edited: Page 3, GENERAL NOTES:
2) LF’s have one (1) 4,000 gallon underground storage tank.*
*(4500 gallon changed to 4000 gallon)