Summary of Changes -- Amendment 1

View the file

Other files for this federal contract opportunity

Other files attached to Replace UST Spill Buckets, newest first.
File Type Posted
Q&A_4.pdf PDF
Summary_of_Changes_-_Amendment_4.pdf PDF
Amendment_4_--_FA462619RA015.pdf PDF
Attch_10_Sections_L&M_Replace_UST_Spill_Buckets_-_Revised_23_Sep_19.pdf PDF
Q&A_3_-_FA462619RA015.pdf PDF
Attch_10_Sections_L&M_Replace_UST_Spill_Buckets_-_Revised_13_Sep_19.pdf PDF
Q&A_2.pdf PDF
Summary_of_Changes_-_Amendment_3.pdf PDF
Amendment_03_-_FA462619RA015.pdf PDF
Q&A_1.pdf PDF
Amendment_02_--_FA462619RA015.pdf PDF
Attch_10_Sections_L&M_Replace_UST_Spill_Buckets_-_Revised_5_Sep_19.pdf PDF
Summary_of_Changes_-_Amendment_2.pdf PDF
Attch_2,_Submittal_Schedule_Revised_9-3-19.pdf PDF
Amendment_01_--_FA462619RA015.pdf PDF
Attch_1,_Technical_Specification_Revised_9-3-19.pdf PDF
Attch_4,_Spill_Buckets_Drawing_Revised_9-3-19.pdf PDF
Attch_7_Bid_Schedule_Repl_UST_Spill_Buckets.xls XLS spreadsheet
Attch_5_Special_Contract_Requirements.pdf PDF
Attch_11_Wage_Determinations_UST_Spill_Buckets.pdf PDF
Attch_1_Technical_Specification_Revised_8-22-19.pdf PDF
Attch_9_Subcontractor_Consent.doc DOC document
Attch_4_Spill_Bucket_Drawing_Revised_8-6-19.pdf PDF
Attch_10_Sections_L&M_Replace_UST_Spill_Buckets.pdf PDF
Attch_8_Past_Performance_Questionaire.docx DOCX document
Attch_3_Schedule_of_Drawings.pdf PDF
Solicitation_-_FA462619RA015.pdf PDF
Attch_2_Submittal_Schedule.pdf PDF
Attch_6_Installation_Perimeter_Access_Ctrl.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4626-19-R-A015

Replace UST Spill Buckets

Amendment 01

Changes to specifications (Attch 1):

Added: 01 00 00-5, Paragraph 1.17:

“After the OPW 71SO overfill prevention has been installed, Contractor shall provide government with the manufacturer verification checklist that documents the 95% shut-off at the time of installation.”

Changes to submittal schedule (Attch 2):

Added: Division 01 - General Requirements:

Line # 1, 01 00 00, 1.1.7 OPW 71SO Manufacturer Install Verification Checklist.

Changes to project drawings (Attch 4):

Edited: Page 3, GENERAL NOTES:

2) LF’s have one (1) 4,000 gallon underground storage tank.*

*(4500 gallon changed to 4000 gallon)