Q&A_1.pdf

PDF 12 KB Posted

Attached to
Replace UST Spill Buckets Federal contract opportunity
Solicitation number
FA4626-19-R-A015
Issued by
Department of the Air Force Global Strike Command

About this file

Question & Answer Document 1

View the file

Other files for this federal contract opportunity

Other files attached to Replace UST Spill Buckets, newest first.
File Type Posted
Q&A_4.pdf PDF
Attch_10_Sections_L&M_Replace_UST_Spill_Buckets_-_Revised_23_Sep_19.pdf PDF
Amendment_4_--_FA462619RA015.pdf PDF
Summary_of_Changes_-_Amendment_4.pdf PDF
Q&A_3_-_FA462619RA015.pdf PDF
Amendment_03_-_FA462619RA015.pdf PDF
Q&A_2.pdf PDF
Summary_of_Changes_-_Amendment_3.pdf PDF
Attch_10_Sections_L&M_Replace_UST_Spill_Buckets_-_Revised_13_Sep_19.pdf PDF
Attch_10_Sections_L&M_Replace_UST_Spill_Buckets_-_Revised_5_Sep_19.pdf PDF
Summary_of_Changes_-_Amendment_2.pdf PDF
Amendment_02_--_FA462619RA015.pdf PDF
Attch_1,_Technical_Specification_Revised_9-3-19.pdf PDF
Attch_4,_Spill_Buckets_Drawing_Revised_9-3-19.pdf PDF
Attch_2,_Submittal_Schedule_Revised_9-3-19.pdf PDF
Summary_of_Changes_-_Amendment_1.pdf PDF
Amendment_01_--_FA462619RA015.pdf PDF
Solicitation_-_FA462619RA015.pdf PDF
Attch_2_Submittal_Schedule.pdf PDF
Attch_6_Installation_Perimeter_Access_Ctrl.pdf PDF
Attch_5_Special_Contract_Requirements.pdf PDF
Attch_11_Wage_Determinations_UST_Spill_Buckets.pdf PDF
Attch_1_Technical_Specification_Revised_8-22-19.pdf PDF
Attch_9_Subcontractor_Consent.doc DOC document
Attch_4_Spill_Bucket_Drawing_Revised_8-6-19.pdf PDF
Attch_10_Sections_L&M_Replace_UST_Spill_Buckets.pdf PDF
Attch_8_Past_Performance_Questionaire.docx DOCX document
Attch_3_Schedule_of_Drawings.pdf PDF
Attch_7_Bid_Schedule_Repl_UST_Spill_Buckets.xls XLS spreadsheet
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4626-19-R-A015: Replace UST Spill Buckets

Questions and Answers:

Q1: The Solicitation Cover Page indicates 2PM MT on 27-Sep, but Attachment 10 indicates 2PM MT on 28-Sep. Which date is correct the 27th or the 28th?

A1: 27 Sep 2019.

Reference: Amendment 02

Q2: Is a site visit possible prior to proposal submission?

A2: Due to the geographic separation of the sites and the standardized nature of the work requirements, a site visit will not be conducted.

Reference: Attachment 10, Section L, Page 2, Paragraph 2.1.6.

Q3: Is there an actual quantity of USTs being considered?

A3: The requirement is for replacing the spill buckets on existing Underground Storage Tanks at up to 150 Launch Facilities and 15 Missile Alert Facilities sites – a total of 165 potential sites.

Reference: AF Form 1442 Section B for minimum and maximum potential quantities.

Q4: Is there a date that after which questions will no longer be accepted?

A4: No later than 12:00 p.m. MST five (5) work days prior to the solicitation close date.

Q5: Attachment 10, Section L, Section 2.2, Table 2.2 indicates a Technical Sub-factor page limit of 5 pages and Attachment 10, Section M – I Basis of Award, Part I indicates a 10 page limit for the Technical Sub-factor. Is 5 or 10 pages correct?

A5: Submit IAW Section L, Table 2.2.

File details come from the government source that posted it.