Attch_4,_Spill_Buckets_Drawing_Revised_9-3-19.pdf
PDF 1 MB Posted
- Attached to
- Replace UST Spill Buckets Federal contract opportunity
- Solicitation number
- FA4626-19-R-A015
About this file
Amended Attachment 4
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GREATFALLS, MT
LEWISTOWN
LIMA
MIKE
OSCAR
KILO
K-07
K-05
K-04
K-06
K-08
K-01
K-03
K-11
K10
K-09
K-02
L-10
L-09
L-08
L-07
L-03
L-04
L-05
L-06
L-11
L-02
L-01
M-03
M-02
M-04
M-05
M-11
M-10
M-09
M-07
M-01
M-06M-08
N-08
N-07
N-06
N-05
N-10
N-04
N-03
N-02
N-09
N-11
N-01
O-07
O-05
O-06
O-04
O-10
O-09
O-08
O-03
O-02
O-11
O-01
C-07
C-08
C-09
C-10
C-06
C-05
C-01
C-11
C-02
C-03
C-04
E-08
E-09
E-07
E-06
E-10
E-01
E-03
E-05
E-11
E-04
E-02
D-06
D-07
D-08
D-09
D-10
D-11
D-05
D-04
D-02
D-03
D-01
B-08
B-01
B-09
B-10
B-11
B-02
B-07
B-06
B-05
B-04
B-03
A-06
A-05
A-07
A-04
A-08
A-09
A-10
A-01
A-03
A-02
A-11
I-04
I-05
I-03
I-02
I-06
I-07
I-01
I-08
I-09
I-11
I-10
J-10
J-09
J-08
J-06
J-01
J-11
J-02
J-03
J-04
J-07
J-05
H-06
H-07
H-08
H-09
H-05
H-04
H-01
H-03
H-10
H-11
H-02
G-08
G-07
G-06
G-05
G-04
G-03
G-02
G-11
G-01
G-09
G-10
F-07
F-06
F-05
F-01
F-04
F-08
F-03
F-09 F-11
F-10
F-02
CHARLIE
DELTA
BRAVO
ECHO
ALPHA
INDIA
GOLF
JULIET
HOTEL
FOXTROT
12TH
10TH
490TH
NOVEMBER
MAF LOCATIONS
LF LOCATIONS
LEGEND
DRAWN BY
DESIGNED BY
REVIEWED BY
SCALE DATE PLATE
PAGE OF
RECORD FILE NUMBER
ACAD DRAWING NUMBER
PROJECT NUMBERS
REV. DATE DESCRIPTION DRAWN APPR'D
AIR FORCE GLOBA L STRIKE COM MAND
10/29/2018
NZAS 19-6009A
ATTACHMENT 4
XXX
XXX
XXX
REPLACE UST SPILL BUCKETS
REPLACE UST SPILL BUCKETS
MAFs & LFs
PROJECT NZAS 19-6009A
NN
SITE MAP
GRAPHIC N.T.S.
NOTES:
1. PHASE I 490th
2. PHASE II 10th
3. PHASE III 12th
AutoCAD SHX Text
GLOBAL STRIKE COMMAND
AutoCAD SHX Text
MALMSTROM AIR FORCE BASE, MONTANA
X
X
X
X
EXISTING
UST LOCATION
BUILDING
EQUIPMENT
LAUNCHER
SECURITY FENCE
LAUNCHER
ROAD
ACCESS
WEST
ROAD
ACCESS
NORTH
ACCESS
ROAD
EAST
13'-3
6'-6"
SOUTH
ROAD
ACCESS
EXISTING UST LOCATION
DRAWN BY
DESIGNED BY
REVIEWED BY
SCALE DATE PLATE
PAGE OF
RECORD FILE NUMBER
ACAD DRAWING NUMBER
PROJECT NUMBERS
REV. DATE DESCRIPTION DRAWN APPR'D
AIR FORCE GLOBA L STRIKE COM MAND
10/29/2018
NZAS 19-6009A
ATTACHMENT 4
XXX
XXX
XXX
TYPICAL MAF & LF SITE PLAN
TYPICAL MAF SITE PLAN
TYPICAL LF SITE PLAN
NOTES:
1. ACCESS ROADS ARE IN GENERAL LOCATIONS EACH SITE HAS ONLY ONE ACCESS ROAD.
2. DIMENSIONS FOR FUEL TANK ARE FOR REFERENCE ONLY. VERIFY BEFORE EXCAVATION.
3. ACCESS ROAD TO REMAIN CLEAR AT ALL TIMES DURING CONSTRUCTION.
4. CONTRACTOR MUST OBTAIN A BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST BEFORE COMMENCING WORK, AF 103.
5. EXCAVATING THAT BLOCKS AN ACCESS ROAD SHALL BE COMPLETED THE SAME DAY.
AutoCAD SHX Text
GLOBAL STRIKE COMMAND
REMOVE EXISTING
5 GALLON
SPILL BUCKET
REMOVE EXISTING
DROP TUBE & OVERFILL
PROTECTION VALVE
REMOVE EXISTING 16.8"
RIGID POLYETHYLENE PIPE
REMOVE
EXISTING
SOIL
EXISTING CUSHION
MATERIAL
EXISTING GEOTEXTILE
FABRIC
EXISTING SOIL
RI
GI
D
PO
LY
ET
H
YL
EN
E
PI
PE
(F
IE
LD
V
ER
IF
Y
ID
DR
IL
L /2
HO
LE
S
AT
A
NG
LE
SP
AC
E
EV
EN
LY
4"
3"
1/ 2"
FIELD VERIFY
ALL DIMENSIONS
" MIN. THICKNESS
SD
R .5 M
IN
M
IN
M
AY
V
AR
Y
AS
R
EQ
UI
RE
D
CONCRETE PEDASTAL
TYP. FUEL TANK
AUDIBLE ALARM
BOLLARD POST.
6'X8'X10' TREATED
VENT PIPE
SPILL BUCKET
VENT PIPE
STANCHION POST
POST
18"
24"
NEW 4" NOM DIA TWO STAGE MECHANICAL OVERFILL PROTECTION
SHUT OFF VALVE WITH DROP TUBE AND CABLE-BASED MECHANISM TO
ALLOW TESTING FROM SURFACE WITHOUT REMOVAL, SUCH AS OPW
71SO-400C OR APPROVED EQUAL. CONTRACTOR SHALL TEST AFTER
INSTALLATION TO PROVE PROPER FUNCTION OF FLOAT AND SHALL
TEST TO ENSURE COMPLIANCE AFTER INSTALLATION.
NEW GEOTEXTILE FABRIC
NEW CUSHION MATERIAL
NEW 15 GAL HS-20 RATED SPILL BUCKET WITH CAST IRON LID, DRAIN PLUG
SPILL RETURN MECHANISM, AND REMOVABLE PRIMARY AND SECONDARY
CONTAINMENTS, SUCH AS OPW EDGE PART NO. 1C-31512D OR APPROVED EQUAL.
NEW 4" SCHEDULE 40 SS PIPE WITH 4" MALE NPT. TOTAL LENGTH
SHALL BE CUT TO MATCH THE SPACE ON SITE. JOIN TWO SEGMENTS
TOGETHER WITH 4" FEMALE TO FEMALE NPT FITTING TO ALLOW
EASIER REMOVAL AFTER INSTALLATION.
NEW COMPACTED ENGINEERED
FILL AFTER PLACING NEW RIGID
POLYETHYLENE PIPE
NEW RIGID POLYETHYLENE
PIPE. SEE DETAIL1.
DRAWN BY
DESIGNED BY
REVIEWED BY
SCALE DATE PLATE
PAGE OF
RECORD FILE NUMBER
ACAD DRAWING NUMBER
PROJECT NUMBERS
REV. DATE DESCRIPTION DRAWN APPR'D
AIR FORCE GLOBA L S TRIKE COM MAND
10/29/2018
NZAS 19-6009A
ATTACHMENT 4
XXX
XXX
XXX
INSTALLATION DETAILS
TYPICAL EXISTING FUEL STORAGE TANK
TYPICAL NEW SPILL BUCKET
NOTE:
NEW GEOTEXTILE FABRIC TO BE
POLYMETRIC NON-WOVEN
WITH MINIMUM WEIGHT OF 4
OUNCES PER SQUARE YARD
AND MINIMUM THICKNESS OF
17 MILS. THE FABRIC SHALL BE
INSTALLED
PER MANUFACTURERS
INSTRUCTIONS.
TYPICAL EXISTING TANK & BOLLARD POSTS PLAN
GENERAL NOTES:
1) MAF's HAVE ONE (1) - 12,000 GALLON UNDERGROUND STORAGE TANK.
2) LF's HAVE ONE (1) - 4,000 GALLON UNDERGROUND STORAGE TANK.
N.T.S
N.T.S
N.T.S
N.T.S
CONTAINMENT PIPE
NOTE:
CONTRACTOR SHALL COORDINATE INSTALLATION
INSTRUCTIONS WITH SPILL BUCKET MANUFACTURER
AND SIZE ID AS NECESSARY. SUBMIT SHOP
DRAWINGS.
AutoCAD SHX Text
GLOBAL STRIKE COMMAND
EXISTING CUSHION
MATERIAL
REMOVE EXISTING
5 GALLON
SPILL BUCKET.
REMOVE
EXISTING
SOIL
EXISTING THICK 6" CONCRETE PAD
WITH #4 @12" EACH WAY (CENTER PAD)
EXISTING GEOTEXTILE
FABRIC
EXISTING SOIL
REMOVE EXISTING
DROP TUBE & OVERFILL
PROTECTIVE VALVE
4"
REMOVE EXISTING PIPE CONTAINMENT
4"
FENCE
CONCRETE PAD ABOVE
UNDERGROUND FUEL
MAF SUPPORT BUILDING
ROOM 101
ROOM 102
GATE
ACCESS
SPILL BUCKET
MONITOR WELL
CP TEST
FUEL TANK
MAN HOLE
UST FUEL TANK
12'
24'-6"
ROAD
OIL TANK
NEW 4" NOM DIA TWO STAGE MECHANICAL OVERFILL PROTECTION
SHUT OFF VALVE WITH DROP TUBE AND CABLE-BASED MECHANISM TO
ALLOW TESTING FROM SURFACE WITHOUT REMOVAL, SUCH AS OPW
71SO-400C OR APPROVED EQUAL. CONTRACTOR SHALL TEST AFTER
INSTALLATION TO PROVE PROPER FUNCTION OF FLOAT AND SHALL
TEST TO ENSURE COMPLIANCE AFTER INSTALLATION.
NEW GEOTEXTILE FABRIC
NEW CUSHION MATERIAL
NEW 15 GAL HS-20 RATED SPILL BUCKET WITH CAST IRON LID, DRAIN PLUG
SPILL RETURN MECHANISM, AND REMOVABLE PRIMARY AND SECONDARY
CONTAINMENTS, SUCH AS OPW EDGE PART NO. 1C-31512D OR APPROVED EQUAL.
NEW 4" SCHEDULE 40 SS PIPE WITH 4" MALE NPT. TOTAL LENGTH
SHALL BE CUT TO MATCH THE SPACE ON SITE. JOIN TWO SEGMENTS
TOGETHER WITH 4" FEMALE TO FEMALE NPT FITTING TO ALLOW
EASIER REMOVAL AFTER INSTALLATION.
NEW COMPACTED ENGINEERED
FILL AFTER PLACING NEW RIGID
POLYETHYLENE PIPE
NEW RIGID POLYETHYLENE
PIPE. SEE TYPICAL CONTAINMENT
RIGID POLYETHYLENE PIPE
DETAIL
NEW MIN 6" THICK REINFORCED
CONCRETE PAD SHALL BE SLOPED (MIN. 1")
AWAY FROM SURROUNDING AREA
4" 4"
18"
24"
ANCHOR CONTAINMENT PIPE IN CONCRETE
AND PROVIDE SEAL AROUND PIPE
DOWEL INTO EXISTING CONCRETE A MIN. OF
EVERY 18" WITH
" BAR EMBEDDED MIN. 4"
DRAWN BY
DESIGNED BY
REVIEWED BY
SCALE DATE PLATE
PAGE OF
RECORD FILE NUMBER
ACAD DRAWING NUMBER
PROJECT NUMBERS
REV. DATE DESCRIPTION DRAWN APPR'D
AIR FORCE GLOBA L S TRIKE COM MAND
10/29/2018
NZAS 19-6009A
ATTACHMENT 4
XXX
XXX
XXX
MAF H-1 INSTALLATION DETAILS
MAF H-1 EXISTING FUEL STORAGE TANK
MAF H-1 NEW SPILL BUCKET
NOTE:
NEW GEOTEXTILE FABRIC TO BE
POLYMETRIC NON-WOVEN
WITH MINIMUM WEIGHT OF 4
OUNCES PER SQUARE YARD
AND MINIMUM THICKNESS OF
17 MILS. THE FABRIC SHALL BE
INSTALLED
PER MANUFACTURERS
INSTRUCTIONS.
MAF H-01 SITE PLAN WITH TANK CONCRETE PAD
GENERAL NOTES:
1) MAF's HAVE ONE (1) - 12,000 GALLON
UNDERGROUND STORAGE TANK.
2) MAY ENCOUNTER UNDERGROUND UTILITIES NOT SHOWN,
HYDROVAC OR "SOFT DIG".
N.T.S
N.T.S
N.T.S
AutoCAD SHX Text
GLOBAL STRIKE COMMAND
| Sheets and Views |
| Spill Buckets-Layout1 |
| Spill Buckets-Layout2 |
| Spill Buckets-Layout3 |
| Spill Buckets-Layout4 |
File details come from the government source that posted it.