Amended Attachment 2

View the file

Other files for this federal contract opportunity

Other files attached to Replace UST Spill Buckets, newest first.
File Type Posted
Q&A_4.pdf PDF
Summary_of_Changes_-_Amendment_4.pdf PDF
Attch_10_Sections_L&M_Replace_UST_Spill_Buckets_-_Revised_23_Sep_19.pdf PDF
Amendment_4_--_FA462619RA015.pdf PDF
Q&A_3_-_FA462619RA015.pdf PDF
Q&A_2.pdf PDF
Summary_of_Changes_-_Amendment_3.pdf PDF
Attch_10_Sections_L&M_Replace_UST_Spill_Buckets_-_Revised_13_Sep_19.pdf PDF
Amendment_03_-_FA462619RA015.pdf PDF
Q&A_1.pdf PDF
Attch_10_Sections_L&M_Replace_UST_Spill_Buckets_-_Revised_5_Sep_19.pdf PDF
Amendment_02_--_FA462619RA015.pdf PDF
Summary_of_Changes_-_Amendment_2.pdf PDF
Summary_of_Changes_-_Amendment_1.pdf PDF
Amendment_01_--_FA462619RA015.pdf PDF
Attch_1,_Technical_Specification_Revised_9-3-19.pdf PDF
Attch_4,_Spill_Buckets_Drawing_Revised_9-3-19.pdf PDF
Attch_5_Special_Contract_Requirements.pdf PDF
Attch_11_Wage_Determinations_UST_Spill_Buckets.pdf PDF
Attch_1_Technical_Specification_Revised_8-22-19.pdf PDF
Attch_7_Bid_Schedule_Repl_UST_Spill_Buckets.xls XLS spreadsheet
Solicitation_-_FA462619RA015.pdf PDF
Attch_2_Submittal_Schedule.pdf PDF
Attch_6_Installation_Perimeter_Access_Ctrl.pdf PDF
Attch_9_Subcontractor_Consent.doc DOC document
Attch_4_Spill_Bucket_Drawing_Revised_8-6-19.pdf PDF
Attch_10_Sections_L&M_Replace_UST_Spill_Buckets.pdf PDF
Attch_8_Past_Performance_Questionaire.docx DOCX document
Attch_3_Schedule_of_Drawings.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2 FA4626-19-R-A015

AF Form 66

02: 000510_AC01_00_90-

Replace UST Spill Buckets Submittal Schedule 9/3/19 SS-1 of 2

SCHEDULE OF MATERIALS SUBMITTALS

Project Number

NZAS 19-6009

Project Title:

Replace UST Spill Buckets

Solicitation/Contract No.

FA4626-19-R-A015

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

LI

N E

N U

M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

Number of Copies Required

E Q

U

IR

D

SU

B M

IS

SI

O N

D

AT

(B Y

C O

N T

R

AC

TO

R

D

AT

E R

E C

E

IV

E D

I

CO

T

R

AC

T

IN

G

E

T O

C

IV

IL

G

IN

E E

R

T U

R N

S U

SP

E

SE

BM

IT

TA

L N

U M

B E

S

DATE CONTRACTOR NOTIFIED

T

R

AC

T O

SU

B

M

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

REMARKS

CE

R

TI

FI

CA

T

IO

N

O F

CO

M

PL

IA

N C

SH

P D

R

AW

IN

G

S

SA

M

PL

E

S

CO

LO

R S

E

LE

C T

IO

M

AN

U

FA

CT

U

R E

'S

C

O M

M E

N D

AT

I

O N

S

M

AN

U

FA

CT

U

R E

W

AR

R

AN

T

CA

AL

O

G D

AT

A

O

PE

R

AT

ST

R

U C

T

IO

N S

N O

T

IF

IC

AT

H

APPROVED

DIS-

DIVISION 01-GENERAL REQUIREMENTS

1 01 00 00 1.1.7 OPW 71SO Manufacturer Install Verification Checklist SRO

2 01 00 00 3.8.1 Work Notification/ Weekly Schedule 1 Tues

PSW

Shall be submitted EVERY Tuesday of the week prior to the scheduled work week

3 01 00 00 3.13.2 Quality Control Plan 4 10-days

ANTP

4 01 00 00 3.16.1 As-Built Field Data 1 3-days

AFI

5 01 00 00 3.16.5 As-Built Contract Drawings/AutoCad 3 PTFP

6 01 00 00 3.22 Work Clearance Request (AF Form 103) 4

7 01 00 00 3.25 Nuclear Densometers 1

8 01 00 00 3.3.1 Schedule of Material Submittals 4

9 01 00 00 1.5 Missile Field Entry Authority List (EAL) 1 21-days

PSW

10 01 36 00 1.2 Environmental Permits 1 5-days

11 01 36 00 1.7 Hazardous Materials (Attachment 5) 1 30-days

12 01 36 00 1.11.6 Waste Management Plan (Attachment 1) 1

PTFA

13 01 36 00 1.12.5 Recycled Material Use Report (Attachment 4) 1

PTFA

14 01 36 00 Monthly Report of Solid Waste Disposal and Diversion (Attachment 5) 1 Monthly

DIVISION 03 - CONCRETE

15 03 30 00 1.3 - Cast in place concrete - Product Data 4 PSW

16 03 30 00 2.3 - Mix Design 4 15-days

17 03 30 00 2.4.3 - Grout 4

18 03 30 00 2.8 - Fasteners - Product Data 4

DIVISION 7 - THERMAL and MOISTURE PROTECTION 19 07 90 00 1.3 Joint Sealers Product Data 4 15-days

20 07 90 00 1.3 Joint Sealers Installation Instructions 4 15-days

Attachment 2 FA4626-19-R-A015

AF Form 66

02: 000510_AC01_00_90-

Replace UST Spill Buckets Submittal Schedule 9/3/19 SS-2 of 2

SCHEDULE OF MATERIALS SUBMITTALS

Project Number

NZAS 19-6009

Project Title:

Replace UST Spill Buckets

Solicitation/Contract No.

FA4626-19-R-A015

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

LI

E

N U

M

BE

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

Number of Copies Required

Q

U

IR

B M

IS

SI

O N

D

(B

C O

N T

R

AC

TO

R

D

AT

E R

E C

E

IV

E D

I

T

R

AC

T

E

T O

C

IV

IL

G

IN

E E

R

T U

R N

S U

SP

E

SE

BM

IT

TA

L N

U M

B E

S

DATE CONTRACTOR NOTIFIED

T

R

AC

T

SU

B

M

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

REMARKS

CE

R

TI

FI

CA

T

IO

N

O F

CO

M

PL

IA

N C

SH

P D

R

AW

IN

G

S

SA

M

PL

E

S

CO

LO

R S

E

LE

C T

M

AN

U

FA

CT

U

R E

C

O M

M E

N D

AT

I

O N

S

M

AN

U

FA

CT

U

R E

W

AR

R

AN

CA

AL

O

G D

AT

A

O

PE

R

AT

ST

R

U C

T

IO

N S

N O

T

IF

IC

AT

H

DIS-

DIVISION 31 - EARTHWORK

21 31 00 00 1.4 Test Reports 4 ATT

22 03 00 00 2.3 Filter Fabric 4 10-days

DIVISION 33 – SPILL BUCKET, DROP TUBE, & VAVLE

23 33 52 10 1.3 Contractor Qualifications 4 10-days

PSW

24 33 52 10 1.3 Personnel License 4 10-days

PSW

25 33 52 10 2.2 Spill Bucket 4 10-days

PSW

26 33 52 10 2.3 Overfill Prevention Valve 4 10-days

PSW

27 33 52 10 2.4 Stainless Steel Pipe 4 10-days

PSW

28 33 52 10 2.5 Piping Components 4 10-days

PSW

29 33 52 10 2.6 Rigid Polyethylene Pipe, clip angles, bolts, nuts, & washers. 4 4 10-days

D - Days PBC - Prior to Beginning Construction PFI - Prior to Final Inspection

AFI - After Final Inspection PTFP- Prior to Final Payment PPC - Prior to Project Completion

ANTP - After Notice to Proceed PSW - Prior to Start Work PT - Prior to Testing

ATT - After Test is Taken PTFA - Prior to Final Acceptance SRO- After Each Occurrence