13SubmittalSchedule_DemoProj_Atch11.doc
DOC document 140 KB Posted
- Attached to
- Simplified Base Engineering Requirements (SABER) Construction Services for Malmstrom AFB Federal contract opportunity
- Solicitation number
- FA4626-08-R-0001
About this file
SABER Submittal Schedule
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 11 FA4626-08-R-0001
SUBMITTAL SCHEDULE
PROJ / W.O. #: _NZAS 00-0000________ DESC: __Construct Housing Management Office_________________________________ D.O. #: 1000_
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| 11 |
| SUB NO. |
| SUB ID. NO. |
| SPEC PARA. or DRWG.NO. |
| TYPE |
OF
SUBMITTAL
| DESCRIPTION OF MATERIAL |
| NO. OF SUB DAYS |
| DATE |
REC FR
CONTR
DATE
TO
CECS
DATE
RET TO
LGCK
APRV’D
or
DISAPRV’D
DATE RETURNED
TO CECS
REMARKS
| 1 |
| 01010 |
22.0 Drawings &
Diskettes
| Contractor Design Drawings |
| PTSW |
| 2 |
| 01010 |
23.0
| Drawings |
| Shop Drawings |
| PTSW |
| 3 |
| 01010 |
24.0
| Drawings |
| As-built Field Data |
(Red Lined Drawings)
5 CD
PTFI
| 4 |
| 01010 |
24.0
| Drawings & Diskettes |
| Final As-built |
| PTFP |
| 5 |
| 01010 |
25.0
| Manuals |
| O & M Manuals |
| 5 WD |
| 6 |
| 01010 |
28.0
| DD 1354 Form |
| Transfer & Acceptance of Military Real Property Form |
| PTFP |
| 7 |
| 01010 |
4.0
| AF 103 Form |
| Work Clearance Request |
(Dig Permit)
5 WD PTSW
| NA |
| 8 |
| 01010 |
6.0
| Letter |
| D.O. Specific Quality Control Plan |
| PTSW |
| 9 |
| 01010 |
7.0
| Telephone Notification |
| Start/Stop Work |
| 5 WD PTSW |
Does not require a AF Form 3000
| 10 |
| 01010 |
13.0
| Telephone Notification |
| Environmental Spills |
| Immediate |
Does not require a AF Form 3000
| 11 |
| 01010 |
16.0
| Letter |
| Utility Outage |
| 7 WD |
PTO
| NA |
| 12 |
| 01010 |
30.0
| List |
| Itemized List of Salvage Items for Turn-in to DRMO |
| 3 WD prior to turn-in |
| NA |
| 13 |
| 01010 |
37.0
| List |
| Secured Entry Area Employee List |
| 10 CD |
PTSW
| 14 |
| 01010 |
27.0 Letter
Notification
| Maintenance Training for Installed Equipment |
| 10 WD |
| 15 |
| 01010 |
8.0
| Notification |
| Notice of Final Inspection |
| 14 CD PTCW |
ACA
After contract award
BMD
Before material delivery
PTFA
Prior to final acceptance
AEO
After each occurrence
CD
Calendar days
PTFI
Prior to final inspection
AFA
After final acceptance
EWD
Each work day
PTFP
Prior to final payment
AN
Advance notification
PTCA
Prior to contract award
PTND
Prior to notice date
ANTP
After notice to proceed
PTCW
Prior to completing work
PTO
Prior to outage
AWC
After work completed
PTD
Prior to delivery
PTSW
Prior to starting work
PTDA
Prior to Delivery order Award
WD
Work days
SUBMITTAL SCHEDULE
PROJ / W.O. #: _NZAS 00-0000________ DESC: __ Construct Housing Management Office _________________________________ D.O. #: 1000_
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| 11 |
| SUB NO |
| SUB ID. NO. |
| SPEC PARA. or DRWG.NO. |
| TYPE |
OF
SUBMITTAL
| DESCRIPTION OF MATERIAL |
| NO. OF SUB DAYS |
| DATE |
REC FR
CONTR
DATE
TO
CECS
DATE
RET TO
LGCK
APRV’D
or
DISAPRV’D
DATE RETURNED
REMARKS
| Mfg Lit |
| Metal studs |
| PTSW |
| Mfg Lit |
| Insulation |
| PTSW |
| Mix Design |
| Concrete Mix Design |
| PTSW |
| Mix Design |
| Asphalt Mix Design |
PTSW
| Mfg Lit |
| Doors |
| PTSW |
| Mfg Lit |
| Door hardware |
| PTSW |
| Mg Lit |
| Thresholds |
| PTSW |
| Color Sample |
| Flashing & soffet |
| PTSW |
| Color Sample |
| Paint |
| PTSW |
| Mfg Lit |
| Roof Shingles |
| PTSW |
| Mfg lit |
| Air conditioning unit |
| PTSW |
| Mfg Lit |
| Heating unit |
| PTSW |
| Mfg Lit |
| Electrical Panels |
| PTSW |
| Mfg Lit |
| Conduit |
PTSW
| Mfg Lit |
| Breakers |
| PTSW |
| Mfg Lit |
| Light fixtures |
| PTSW |
| Mfg Lit |
| Water Heater |
PTSW
| Mfg Lit |
| Duct |
| PTSW |
| Mfg Lit |
| Mechanical vents |
| PTSW |
SUBMITTAL SCHEDULE
PROJ / W.O. #: _NZAS 00-0000________ DESC: __ Construct Housing Management Office _________________________________ D.O. #: 1000_
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| 11 |
| SUB NO. |
| SUB ID. NO. |
| SPEC PARA. or DRWG.NO. |
| TYPE |
OF
SUBMITTAL
| DESCRIPTION OF MATERIAL |
| NO. OF SUB DAYS |
| DATE |
REC FR
CONTR
DATE
TO
CECS
DATE
RET TO
LGCK
APRV’D
or
DISAPRV’D
DATE RETURNED
REMARKS
| Mfg Lit |
| Brick Veneer |
| PTSW |
| Mfg Lit |
| Transformer |
| PTSW |
| Mfg Lit |
| Cable Tray |
| PTSW |
| Mfg Lit |
| Structural Steel |
| PTSW |
| Mfg Lit |
| CMU Block |
| PTSW |
| Mfg Lit |
| Carpet |
| PTSW |
| Mfg Lit |
| Floor Tile |
| PTSW |
| Mfg Lit |
| Gypsum board |
| PTSW |
| Mfg Lit |
| Windows |
| PTSW |
| Mfg Lit |
| Water Closets |
| PTSW |
| Mfg Lit |
| Sinks |
| PTSW |
| Mfg Lit |
| Cabinets |
| PTSW |
| Mfg Lit |
| Ceiling system and tile |
| PTSW |
| Mfg Lit |
| Skylight |
PTSW
| Mfg Lit |
| Pipe |
| PTSW |
MALMSTROM FORM 124, OCT 92 PREVIOUS EDITION WILL BE USED
Submittal Schedule_Demo Proj_Atch 11