07WageDetMT070002_Highway_Atch5.doc

DOC document 63 KB Posted

Attached to
Simplified Base Engineering Requirements (SABER) Construction Services for Malmstrom AFB Federal contract opportunity
Solicitation number
FA4626-08-R-0001
Issued by
Department of the Air Force Global Strike Command

About this file

SABER Wage Determination Hwy

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Base Engineering Requirements (SABER) Construction Services for Malmstrom AFB, newest first.
File Type Posted
Synopsis for Award B-5.doc DOC document
SABER08R0001Amend0002.doc DOC document
02 SABER RFP 08R0001Amend0001.doc DOC document
01 SABERSF 30 08R0001Amend0001.doc DOC document
03 Spec INDEX.DOC DOC document
04 SABER Contract Specifications.doc DOC document
05 SABER SOW 8 Apr 08 Atch 2.docm DOCM document
Questions and Answers.doc DOC document
SiteVisitMtgMinutes.pdf PDF
1435 00-0000-a5Atch12.zip ZIP file
04SABERSOW_24Oct07_Atch2.doc DOC document
03REVISEDSABERSPECS1FEB08Atch1.pdf PDF
1435 DrawingSet_Atch12.zip ZIP file
13SubmittalSchedule_DemoProj_Atch11.doc DOC document
12BlankEstSheets_DemoProj_atch10.pdf PDF
10HistoricalData_Atch8.xls XLS spreadsheet
06WageDetMT070001_HeavyAtch4.doc DOC document
02SABER08R0001.doc DOC document
01TOC_Solicitation.docm DOCM document
05WageDetMT070005_Building_Atch3.doc DOC document
09PastPerformanceQuestionaire_Atch7.docm DOCM document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5 FA4626-08-R-0001

General Decision Number: MT070002 03/30/2007 MT2

Superseded General Decision Number: MT20030002

State: Montana

Construction Type: Highway

Counties: Montana Statewide.

HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date

0 02/09/2007

1 02/23/2007

2 03/30/2007

* SUMT2001-001 01/12/2007

**ZONE PAY**

CARPENTERS, CEMENTS MASONS, IRON WORKERS, LABORERS, POWER

EQUIPMENT OPERATORS, TRUCK DRIVERS

The hourly wage rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the County Court House of the following towns to the center of the job:

BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HAVRE, HELENA,

KALISPELL, LEWISTOWN, MILES CITY, MISSOULA

ZONE 1: 0 to 30 miles - Free

ZONE 2: 30 to 60 miles - Base Pay +$2.50

ZONE 3: Over 60 miles - Base Pay + $4.00

Rates Fringes

Carpenters:

Carpenter, Piledriverman....$ 21.64 8.85

Millwright..................$ 23.64 8.85

Cement Mason.....................$ 20.36 8.50

Electricians:

Area 1......................$ 18.74 2.93+3.8%

Area 2......................$ 20.13 4.76+3.8%

Area 3......................$ 19.98 3.44+3.8%

Area 4......................$ 19.84 3.51+3.8%

Area 5......................$ 20.54 3.54+3.8%

Area 6......................$ 18.02 3.44+3.8%

ELECTRICIANS AREA DESCRIPTIONS

AREA 1: Beaverhead, Deer Lodge, Granite, Jefferson, Madison, Silver Bow, and Powell Counties

AREA 2: Big Horn, Carbon, Carter, Custer, Dawson, Fallon, Garfield, Golden Valley, Musselshell, Powder River, Prairie, Rosebud, Stillwater, Treasure, Wibaux, and Yellowstone counties

AREA 3: Blaine, Cascade, Chouteau, Daniels, Fergus, Glacier, Hill, Judith Basin, Liberty, McCone, Petroleum, Pondera, Phillips, Richland, Roosevelt, Sheridan, Teton, Toole, Valley, and Wheatland Counties

AREA 4: Broadwater, Lewis and Clark, and Meagher Counties

AREA 5: Flathead, Lake, Lincoln, Mineral, Missoula, Ravalli, and Sanders Counties

AREA 6: Gallatin, Park, and Sweet Grass Counties

Ironworker

Flathead, Glacier, Lake, Lincoln, Mineral, Missoula and Sanders Cos....$ 24.80 13.71

Remaining Counties..........$ 23.15 13.71

Laborers:

Group 1.....................$ 16.37 6.75

Group 2.....................$ 19.07 6.75

Group 3.....................$ 19.26 6.75

Group 4.....................$ 20.13 6.75

LABORERS CLASSIFICATIONS

GROUP 1: Flag person

GROUP 2: All General Labor work; Burning Bar; Bucket man;

Carpenter Tender; Caisson Worker; Cement Mason Tender; Cement

Handler (dry); Chuck Tender; Choker Setter; Concrete worker;

Curb Machine-Lay Down; Crusher and Batch Plant Worker; Fence

Erector; Form Setter; Form Stripper; Heater Tender;

Landscaper; Pipe Wrapper; Pot Tender; Powderman Tender; Rail and Truck Loaders and Unloaders; Riprapper; Sealants for

Concrete and other materials; Sign Erection, Guard Rail and

Jersey Rail; Stake Jumper; Spike Driver; Signalman; Tail

Hoseman; Tool Checker and Houseman; Traffic Control worker

GROUP 3: Concrete Vibrator; Dumpman (Grademan); Equipment

Handler; Geotextile and Liners; High-Pressure Nozzlemen;

Jackhammer (Pavement Breaker); Laser equipment; Non-riding

Rollers; Pipelayer; Posthole Digger (power); Power Driven

Wheelbarrow; Rigger; Sandblaster; Sod Cutter-power; Tampers

GROUP 4: Ashpalt Raker; Cutting Torch; Grade Setter; High-

Scaler; Power Saws (Faller & Concrete); Powderman ($1.00 per hour above Group 4 rate); Rock & Core Drill; Track or Truck mounted Wagon Drill; Welder including Air Arc

Line Construction

Equipment Operator..........$ 19.16 5.05

Groundman...................$ 15.40 5.05

Painters:........................$ 23.00 8.00

Pavement Marking/Milling and related work. Includes operating marking and all other equipment and all work involved in traffic marking including removal, surface preparation and application of pavement markings including epoxies, paints, tape, buttons, thermo- plastics and any other products applied for traffic marking purposes and for directing and regulating traffic, and cutting Rumble Strips..

Power Equipment Operator

Group 1.....................$ 20.52 8.00

Group 2.....................$ 22.48 8.00

Group 3.....................$ 23.31 8.00

Group 4.....................$ 23.98 8.00

Group 5.....................$ 25.28 8.00

Group 6.....................$ 25.94 8.00

Group 7.....................$ 27.97 8.00

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: A-Frame Truck Crane; Air Compressor; Auto Fine

Grader; Belt Finishing Machine; Boring Machine (small);

Cement Silo, Crane; Crusher Conveyor, DW-10, 15, and 20

Tractor Roller; Farm Tractor; Forklift; Form-Grader; Front-end Loader under 1 cu yd;Oiler, Heavy Duty Drills; Pumpman;

Oiler (All, except Cranes and Shovels)

GROUP 2: Air Doctor; Backhoe/Excavator/Shovel to & incl 3 cu yd Bit Grinder; Bitunimous Paving Travel Plant; Boring

Machine, large: Broom, Self-Propelled; Concrete Bucket

Dispatcher; Concrete Conveyor; Concrete Finish Machine;

Concrete Float and Spreader; Concrete Travel Batcher;

Distributor; Dozer, Rubber tired, Push, and Side Boom; Drills, Heavy Duty (all types); Elevating Grader/Gradall; Field

Equipment Serviceman; Front-end Loader 1 cu yd to and incl. 5 cu yd; Grade Setter; Hoist/Tugger (All Hydralift & Similar);

Industrial Locomotive; Motor Patrol (Except Finish);

Mountain Skidder; Oiler, Cranes & Shovels; Pavement Breaker, EMSCO; Power Saw, Self-Propelled; Pugmill; Pumpcrete/ Grout

Machine; Punch Truck; Rollers (All except Asphalt Finish and

Breakdown); Ross Carrier; Rotomill under 6 ft; Trenching

Machine; Washing/Screening Plant

GROUP 3: Asphalt Finish Roller; Asphalt Breakdown Roller;

Asphalt Paving Machine; Backhoe/Excavator/Shovel larger than 3 cu yd; Asphalt Screed; Concrete Batch Plant; Cableway

Highline; Concrete Curing Machine; Cranes, 24 tons & under;

Cranes, Creter; Cranes, Electric Overhead; Concrete Pump; Curb

Machine/Slip Form Paver; Finish Dozer; Mechanic/Welder;

Pioneer Dozer; Rotomill 6 ft and over; Scraper, Single

Engine; Scraper Twin or pulling Belly Dump; Yo Yo Cat Front-end Loader over 5 cu yd;

GROUP 4: Asphalt/Hot Plant Operator; Cranes, 25 tons to 44 tons; Crusher Operator; Finish Motor Patrol; Finish Scraper

SPECIAL OPERATORS:

GROUP 5: Cranes, 45 tons to and including 74 tons

GROUP 6: Cranes, 75 tons to and including 149 tons

GROUP 7: Cranes, 150 tons to and including 250 tons; Cranes over 250 tons: add $1.00 for every 100 tons over 250 tons;

Crane, Stiff-Leg or Derrick; Crane, Tower all); Crane, Whirley

(all); Helicopter Hoist

Truck drivers:

Group 1.....................$ 17.76 7.75

Group 2.....................$ 22.73 7.75

GROUP 1: Pilot Car

GROUP 2: Combination Truck and Concrete Mixer and Transit

Mixer; Dry Batch Trucks; Distributor Driver; Dumpman; Dump

Trucks and similar equipment; Dumpster; Flat Trucks; Lumber

Carriers; Lowboys; Pickup; Powder Truck Driver; Power Boom;

Serviceman; Service Truck/Fuel Truck/Tireperson; Truck

Mechanic; Trucks with Power Equipment; Warehouseman, Partsman, Cardex and Warehouse Expeditor; Water Trucks

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .