07WageDetMT070002_Highway_Atch5.doc
DOC document 63 KB Posted
- Attached to
- Simplified Base Engineering Requirements (SABER) Construction Services for Malmstrom AFB Federal contract opportunity
- Solicitation number
- FA4626-08-R-0001
About this file
SABER Wage Determination Hwy
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5 FA4626-08-R-0001
General Decision Number: MT070002 03/30/2007 MT2
Superseded General Decision Number: MT20030002
State: Montana
Construction Type: Highway
Counties: Montana Statewide.
HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date
0 02/09/2007
1 02/23/2007
2 03/30/2007
* SUMT2001-001 01/12/2007
**ZONE PAY**
CARPENTERS, CEMENTS MASONS, IRON WORKERS, LABORERS, POWER
EQUIPMENT OPERATORS, TRUCK DRIVERS
The hourly wage rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the County Court House of the following towns to the center of the job:
BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HAVRE, HELENA,
KALISPELL, LEWISTOWN, MILES CITY, MISSOULA
ZONE 1: 0 to 30 miles - Free
ZONE 2: 30 to 60 miles - Base Pay +$2.50
ZONE 3: Over 60 miles - Base Pay + $4.00
Rates Fringes
Carpenters:
Carpenter, Piledriverman....$ 21.64 8.85
Millwright..................$ 23.64 8.85
Cement Mason.....................$ 20.36 8.50
Electricians:
Area 1......................$ 18.74 2.93+3.8%
Area 2......................$ 20.13 4.76+3.8%
Area 3......................$ 19.98 3.44+3.8%
Area 4......................$ 19.84 3.51+3.8%
Area 5......................$ 20.54 3.54+3.8%
Area 6......................$ 18.02 3.44+3.8%
ELECTRICIANS AREA DESCRIPTIONS
AREA 1: Beaverhead, Deer Lodge, Granite, Jefferson, Madison, Silver Bow, and Powell Counties
AREA 2: Big Horn, Carbon, Carter, Custer, Dawson, Fallon, Garfield, Golden Valley, Musselshell, Powder River, Prairie, Rosebud, Stillwater, Treasure, Wibaux, and Yellowstone counties
AREA 3: Blaine, Cascade, Chouteau, Daniels, Fergus, Glacier, Hill, Judith Basin, Liberty, McCone, Petroleum, Pondera, Phillips, Richland, Roosevelt, Sheridan, Teton, Toole, Valley, and Wheatland Counties
AREA 4: Broadwater, Lewis and Clark, and Meagher Counties
AREA 5: Flathead, Lake, Lincoln, Mineral, Missoula, Ravalli, and Sanders Counties
AREA 6: Gallatin, Park, and Sweet Grass Counties
Ironworker
Flathead, Glacier, Lake, Lincoln, Mineral, Missoula and Sanders Cos....$ 24.80 13.71
Remaining Counties..........$ 23.15 13.71
Laborers:
Group 1.....................$ 16.37 6.75
Group 2.....................$ 19.07 6.75
Group 3.....................$ 19.26 6.75
Group 4.....................$ 20.13 6.75
LABORERS CLASSIFICATIONS
GROUP 1: Flag person
GROUP 2: All General Labor work; Burning Bar; Bucket man;
Carpenter Tender; Caisson Worker; Cement Mason Tender; Cement
Handler (dry); Chuck Tender; Choker Setter; Concrete worker;
Curb Machine-Lay Down; Crusher and Batch Plant Worker; Fence
Erector; Form Setter; Form Stripper; Heater Tender;
Landscaper; Pipe Wrapper; Pot Tender; Powderman Tender; Rail and Truck Loaders and Unloaders; Riprapper; Sealants for
Concrete and other materials; Sign Erection, Guard Rail and
Jersey Rail; Stake Jumper; Spike Driver; Signalman; Tail
Hoseman; Tool Checker and Houseman; Traffic Control worker
GROUP 3: Concrete Vibrator; Dumpman (Grademan); Equipment
Handler; Geotextile and Liners; High-Pressure Nozzlemen;
Jackhammer (Pavement Breaker); Laser equipment; Non-riding
Rollers; Pipelayer; Posthole Digger (power); Power Driven
Wheelbarrow; Rigger; Sandblaster; Sod Cutter-power; Tampers
GROUP 4: Ashpalt Raker; Cutting Torch; Grade Setter; High-
Scaler; Power Saws (Faller & Concrete); Powderman ($1.00 per hour above Group 4 rate); Rock & Core Drill; Track or Truck mounted Wagon Drill; Welder including Air Arc
Line Construction
Equipment Operator..........$ 19.16 5.05
Groundman...................$ 15.40 5.05
Painters:........................$ 23.00 8.00
Pavement Marking/Milling and related work. Includes operating marking and all other equipment and all work involved in traffic marking including removal, surface preparation and application of pavement markings including epoxies, paints, tape, buttons, thermo- plastics and any other products applied for traffic marking purposes and for directing and regulating traffic, and cutting Rumble Strips..
Power Equipment Operator
Group 1.....................$ 20.52 8.00
Group 2.....................$ 22.48 8.00
Group 3.....................$ 23.31 8.00
Group 4.....................$ 23.98 8.00
Group 5.....................$ 25.28 8.00
Group 6.....................$ 25.94 8.00
Group 7.....................$ 27.97 8.00
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: A-Frame Truck Crane; Air Compressor; Auto Fine
Grader; Belt Finishing Machine; Boring Machine (small);
Cement Silo, Crane; Crusher Conveyor, DW-10, 15, and 20
Tractor Roller; Farm Tractor; Forklift; Form-Grader; Front-end Loader under 1 cu yd;Oiler, Heavy Duty Drills; Pumpman;
Oiler (All, except Cranes and Shovels)
GROUP 2: Air Doctor; Backhoe/Excavator/Shovel to & incl 3 cu yd Bit Grinder; Bitunimous Paving Travel Plant; Boring
Machine, large: Broom, Self-Propelled; Concrete Bucket
Dispatcher; Concrete Conveyor; Concrete Finish Machine;
Concrete Float and Spreader; Concrete Travel Batcher;
Distributor; Dozer, Rubber tired, Push, and Side Boom; Drills, Heavy Duty (all types); Elevating Grader/Gradall; Field
Equipment Serviceman; Front-end Loader 1 cu yd to and incl. 5 cu yd; Grade Setter; Hoist/Tugger (All Hydralift & Similar);
Industrial Locomotive; Motor Patrol (Except Finish);
Mountain Skidder; Oiler, Cranes & Shovels; Pavement Breaker, EMSCO; Power Saw, Self-Propelled; Pugmill; Pumpcrete/ Grout
Machine; Punch Truck; Rollers (All except Asphalt Finish and
Breakdown); Ross Carrier; Rotomill under 6 ft; Trenching
Machine; Washing/Screening Plant
GROUP 3: Asphalt Finish Roller; Asphalt Breakdown Roller;
Asphalt Paving Machine; Backhoe/Excavator/Shovel larger than 3 cu yd; Asphalt Screed; Concrete Batch Plant; Cableway
Highline; Concrete Curing Machine; Cranes, 24 tons & under;
Cranes, Creter; Cranes, Electric Overhead; Concrete Pump; Curb
Machine/Slip Form Paver; Finish Dozer; Mechanic/Welder;
Pioneer Dozer; Rotomill 6 ft and over; Scraper, Single
Engine; Scraper Twin or pulling Belly Dump; Yo Yo Cat Front-end Loader over 5 cu yd;
GROUP 4: Asphalt/Hot Plant Operator; Cranes, 25 tons to 44 tons; Crusher Operator; Finish Motor Patrol; Finish Scraper
SPECIAL OPERATORS:
GROUP 5: Cranes, 45 tons to and including 74 tons
GROUP 6: Cranes, 75 tons to and including 149 tons
GROUP 7: Cranes, 150 tons to and including 250 tons; Cranes over 250 tons: add $1.00 for every 100 tons over 250 tons;
Crane, Stiff-Leg or Derrick; Crane, Tower all); Crane, Whirley
(all); Helicopter Hoist
Truck drivers:
Group 1.....................$ 17.76 7.75
Group 2.....................$ 22.73 7.75
GROUP 1: Pilot Car
GROUP 2: Combination Truck and Concrete Mixer and Transit
Mixer; Dry Batch Trucks; Distributor Driver; Dumpman; Dump
Trucks and similar equipment; Dumpster; Flat Trucks; Lumber
Carriers; Lowboys; Pickup; Powder Truck Driver; Power Boom;
Serviceman; Service Truck/Fuel Truck/Tireperson; Truck
Mechanic; Trucks with Power Equipment; Warehouseman, Partsman, Cardex and Warehouse Expeditor; Water Trucks
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .