01 SABERSF 30 08R0001Amend0001.doc

DOC document 235 KB Posted

Attached to
Simplified Base Engineering Requirements (SABER) Construction Services for Malmstrom AFB Federal contract opportunity
Solicitation number
FA4626-08-R-0001
Issued by
Department of the Air Force Global Strike Command

About this file

SABER SF 30 Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Base Engineering Requirements (SABER) Construction Services for Malmstrom AFB, newest first.
File Type Posted
Synopsis for Award B-5.doc DOC document
SABER08R0001Amend0002.doc DOC document
02 SABER RFP 08R0001Amend0001.doc DOC document
03 Spec INDEX.DOC DOC document
04 SABER Contract Specifications.doc DOC document
05 SABER SOW 8 Apr 08 Atch 2.docm DOCM document
Questions and Answers.doc DOC document
SiteVisitMtgMinutes.pdf PDF
1435 00-0000-a5Atch12.zip ZIP file
12BlankEstSheets_DemoProj_atch10.pdf PDF
10HistoricalData_Atch8.xls XLS spreadsheet
06WageDetMT070001_HeavyAtch4.doc DOC document
04SABERSOW_24Oct07_Atch2.doc DOC document
03REVISEDSABERSPECS1FEB08Atch1.pdf PDF
1435 DrawingSet_Atch12.zip ZIP file
13SubmittalSchedule_DemoProj_Atch11.doc DOC document
02SABER08R0001.doc DOC document
01TOC_Solicitation.docm DOCM document
05WageDetMT070005_Building_Atch3.doc DOC document
07WageDetMT070002_Highway_Atch5.doc DOC document
09PastPerformanceQuestionaire_Atch7.docm DOCM document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Purpose of this amendment is to correct/clarify the solicitation and corresponding document(s) as appropriate.

A. Remove and replace solicitation DD Form 1442 with same revised dated 8 April 2008 in it’s entirety.

B. Remove and replace solicitation specifications, attachment 1, with same revised dated 8 April 2008 in it’s entirety.

C. Remove and replace soliciation statement of work (SOW), attachment 2, with same revised dated 8 April 2008 in it’s entirety.

D. The proposal closing date has been changed to 21 April 2008 at 2:00 p.m. local time.

SECTION A - SOLICITATION/CONTRACT FORM

FROM:

The required performance has changed from Project Title: Simplified Acquisition of Base Engineering Requirements (SABER)Description of Work: Work consists of providing all labor, equipment, transporation, quality control and supervision necessary to perform SABER operations on Malmstrom AFB, as well as surrounding missile complexes and other remote areas under the control of Malmstrom AFB, MT. Payment in advance of installation for materials stored on site will not be considered under this contract or contracts.Special Award Provision: Any award(s) resulting from this solicitation will be made pursuant to the 8(a) Competitive Set-Aside Program. 1) NOTICE TO OFFERORS: Offerors must complete Blocks 14 through 20C on the reverse side of this Standard Form 1442, as well as all proposed coeffiecent and proposed pricing Sub CLINs 0001AA through 4000AH, located under Section B, Coefficient Schedule B.2) NOTICE TO OFFERORS: We anticipate the award of two contracts under this solicitation. The government reserves the right to award one, two, or no contract at all, depending on the technical acceptability of the proposals submitted.NAICS: 236220 SIZE STANDARD: $31 MILLION

TO:

Project Title: Simplified Acquisition of Base Engineering Requirements (SABER)Description of Work: Work consists of providing all labor, equipment, transporation, quality control and supervision necessary to perform SABER operations on Malmstrom AFB, as well as surrounding missile complexes and other remote areas under the control of Malmstrom AFB, MT. Payment in advance of installation for materials stored on site will not be considered under this contract or contracts.Special Award Provision: Any award(s) resulting from this solicitation will be made pursuant to the 8(a) Competitive Set-Aside Program. 1) NOTICE TO OFFERORS: Offerors must complete Blocks 14 through 20C on the reverse side of this Standard Form 1442, as well as all proposed coeffiecent at CLINS 0001-4001 and proposed pricing located under Section B, Coefficient Schedule B.2) NOTICE TO OFFERORS: We anticipate the award of two contracts under this solicitation. The government reserves the right to award one, two, or no contract at all, depending on the technical acceptability of the proposals submitted.NAICS: 236220 SIZE STANDARD: $31 MILLION.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

FROM:

The CLIN extended description has changed from The contractor shall perform maintenance, repair, and minor construction IAW attachment 1, Technical Specifications for SABER and as identifed by other specific specifications/work statements in each delivery order issued against this contract.COEFFICIENTS:Offer shall insert proposed coefficient rates for CLINs 0001 through 4001 (See notes following the Bid Schedule). Coefficients provided shall remain constant and in effect for the life of the contract (One base period and four option periods).Standard Work Hours (715 to 1615, excluding __________ weekends and holidays). Non-Standard Work Hours (other than the Standard __________Work Hours referred to above). Weapons Storage Area - On Base - Secure Area. __________Missile Field - Off Base - Secure Area. __________Non-Priced Item (NPI) Coefficient. __________

TO:

The contractor shall perform maintenance, repair, and minor construction IAW attachment 1, Technical Specifications for SABER and as identifed by other specific specifications/work statements in each delivery order issued against this contract.COEFFICIENTS:Offer shall insert proposed coefficient rates for CLINs 0001 through 4001 (See notes following the Bid Schedule). Coefficients provided shall remain constant and in effect for the life of the contract (One base period and four option periods).Standard Work Hours (0715 to 1615, excluding __________ weekends and holidays). Non-Standard Work Hours (other than the Standard __________Work Hours referred to above). Weapons Storage Area - On Base - Secure Area. __________Missile Field - Off Base - Secure Area. __________Non-Priced Item (NPI) Coefficient. __________.

CLIN 1001

FROM:

The CLIN extended description has changed from The contractor shall perform maintenance, repair, and minor construction IAW attachment 1, Technical Specifications for SABER and as identifed by other specific specifications/work statements in each delivery order issued against this contract.COEFFICIENTS:Offer shall insert proposed coefficient rates for CLINs 0001 through 4001 (See notes following Schedule B). Coefficients provided shall remain constant and in effect for the life of the contract (One base period and four option periods).Standard Work Hours (715 to 1615, excluding __________ weekends and holidays). Non-Standard Work Hours (other than the Standard __________Work Hours referred to above). Weapons Storage Area - On Base - Secure Area. __________Missile Field - Off Base - Secure Area. __________Non-Priced Item (NPI) Coefficient. __________

TO:

The contractor shall perform maintenance, repair, and minor construction IAW attachment 1, Technical Specifications for SABER and as identifed by other specific specifications/work statements in each delivery order issued against this contract.COEFFICIENTS:Offer shall insert proposed coefficient rates for CLINs 0001 through 4001 (See notes following Schedule B). Coefficients provided shall remain constant and in effect for the life of the contract (One base period and four option periods).Standard Work Hours (0715 to 1615, excluding __________ weekends and holidays). Non-Standard Work Hours (other than the Standard __________Work Hours referred to above). Weapons Storage Area - On Base - Secure Area. __________Missile Field - Off Base - Secure Area. __________Non-Priced Item (NPI) Coefficient. __________.

CLIN 2001

FROM:

The CLIN extended description has changed from The contractor shall perform maintenance, repair, and minor construction IAW attachment 1, Technical Specifications for SABER and as identifed by other specific specifications/work statements in each delivery order issued against this contract.COEFFICIENTS:Offer shall insert proposed coefficient rates for CLINs 0001 through 4001 (See notes following Schedule B). Coefficients provided shall remain constant and in effect for the life of the contract (One base period and four option periods).Standard Work Hours (715 to 1615, excluding __________ weekends and holidays). Non-Standard Work Hours (other than the Standard __________Work Hours referred to above). Weapons Storage Area - On Base - Secure Area. __________Missile Field - Off Base - Secure Area. __________Non-Priced Item (NPI) Coefficient. __________

TO:

The contractor shall perform maintenance, repair, and minor construction IAW attachment 1, Technical Specifications for SABER and as identifed by other specific specifications/work statements in each delivery order issued against this contract.COEFFICIENTS:Offer shall insert proposed coefficient rates for CLINs 0001 through 4001 (See notes following Schedule B). Coefficients provided shall remain constant and in effect for the life of the contract (One base period and four option periods).Standard Work Hours (0715 to 1615, excluding __________ weekends and holidays). Non-Standard Work Hours (other than the Standard __________Work Hours referred to above). Weapons Storage Area - On Base - Secure Area. __________Missile Field - Off Base - Secure Area. __________Non-Priced Item (NPI) Coefficient. __________.

CLIN 3001

FROM:

The CLIN extended description has changed from The contractor shall perform maintenance, repair, and minor construction IAW attachment 1, Technical Specifications for SABER and as identifed by other specific specifications/work statements in each delivery order issued against this contract.COEFFICIENTS:Offer shall insert proposed coefficient rates for CLINs 0001 through 4001 (See notes following the Schedule B). Coefficients provided shall remain constant and in effect for the life of the contract (One base period and four option periods).Standard Work Hours (715 to 1615, excluding __________ weekends and holidays). Non-Standard Work Hours (other than the Standard __________Work Hours referred to above). Weapons Storage Area - On Base - Secure Area. __________Missile Field - Off Base - Secure Area. __________Non-Priced Item (NPI) Coefficient. __________

TO:

The contractor shall perform maintenance, repair, and minor construction IAW attachment 1, Technical Specifications for SABER and as identifed by other specific specifications/work statements in each delivery order issued against this contract.COEFFICIENTS:Offer shall insert proposed coefficient rates for CLINs 0001 through 4001 (See notes following the Schedule B). Coefficients provided shall remain constant and in effect for the life of the contract (One base period and four option periods).Standard Work Hours (0715 to 1615, excluding __________ weekends and holidays). Non-Standard Work Hours (other than the Standard __________Work Hours referred to above). Weapons Storage Area - On Base - Secure Area. __________Missile Field - Off Base - Secure Area. __________Non-Priced Item (NPI) Coefficient. __________.

CLIN 4001

FROM:

The CLIN extended description has changed from The contractor shall perform maintenance, repair, and minor construction IAW attachment 1, Technical Specifications for SABER and as identifed by other specific specifications/work statements in each delivery order issued against this contract.COEFFICIENTS:Offer shall insert proposed coefficient rates for CLINs 0001 through 4001 (See notes following the Schedule B). Coefficients provided shall remain constant and in effect for the life of the contract (One base period and four option periods).Standard Work Hours (715 to 1615, excluding __________ weekends and holidays). Non-Standard Work Hours (other than the Standard __________Work Hours referred to above). Weapons Storage Area - On Base - Secure Area. __________Missile Field - Off Base - Secure Area. __________Non-Priced Item (NPI) Coefficient. __________

TO:

The contractor shall perform maintenance, repair, and minor construction IAW attachment 1, Technical Specifications for SABER and as identifed by other specific specifications/work statements in each delivery order issued against this contract.COEFFICIENTS:Offer shall insert proposed coefficient rates for CLINs 0001 through 4001 (See notes following the Schedule B). Coefficients provided shall remain constant and in effect for the life of the contract (One base period and four option periods).Standard Work Hours (0715 to 1615, excluding __________ weekends and holidays). Non-Standard Work Hours (other than the Standard __________Work Hours referred to above). Weapons Storage Area - On Base - Secure Area. __________Missile Field - Off Base - Secure Area. __________Non-Priced Item (NPI) Coefficient. __________.

The following have been modified:

SCHEDULE B CONTINUE

SUPPLIES AND SERVICES CONT.

COEFFICIENT SCHEDULE B

A. COEFFICIENT SCHEDULE B (continued) “ENTER COEFFICIENT PRICES BELOW”

COEFFICIENT PRICING IN THE TABLE BELOW IS FOR EVALUATION PURPOSES ONLY

DESCRIPTION
ESTIMATED* DOLLAR AMOUNT
PROPOSED**

COEFFICIENT

ESTIMATED*

PROPOSED PRICE

STANDARD WORK HOURS (0715 TO 1615, EXCLUDING WEEKENDS AND HOLIDAYS)
$600,000.00
______________
$_______________

NON-STANDARD WORK HOURS (other than the Standard Work Hours referred to above)

$40,000.00
______________
$_______________

WEAPONS STORAGE AREA – ON MALMSTROM AFB – SECURE AREA

$40,000.00
______________
$_______________

MISSILE FIELD – OFF MALMSTROM AFB –

SECURE AREA

$60,000.00
_______________
$________________

NPI COEFFICIENT

$10,000.00

_______________
$________________
ESTIMATED TOTAL BASED ON PROPOSED COEFFICIENTS
_______________
$________________

* The estimated dollar amounts are for proposal evaluation purposes only.

** The Contractor’s coefficient shall account for all allocable and allowable contract costs, i.e., profit, gross receipt taxes, payroll taxes (FICA, Workmen’s Compensations, Federal and State unemployment) superintendents’ salaries, builders risk insurance, mobilization and de-mobilization expenses, bond premiums, all design costs will be part of the contractors’ coefficient, based on the request to have a Project Engineer on staff, sub-contractor costs, clean-up costs, various over-head expenses (on-site office overhead, field office building, furniture, equipment, on-site office staff salaried, vehicle and construction equipment maintenance, office administrative expenses, proportional share of home office overhead), etc. There will be no allowance for any additional costs beyond the bare costs multiplied by the appropriate “city cost index” for Great Falls, Montana from Means and the coefficient; therefore, the coefficient must be all inclusive of costs incurred for each task order. The coefficient shall include costs for computer hardware, software, licenses, annual maintenance, R.S. Means Master file and all updates and Licenses for WINEST, R.S. Means, etc.)

See Attachment 8 for project history to aid in the development of these CLIN prices.

B-1 SCHEDULE DESCRIPTION

The contractor shall provide maintenance, repair, design and construction services during standard, non-standard working hours and in secure and non-secure areas both on Malmstrom AFB, surrounding missile complexes and other remote areas under the control of Malmstrom AFB, MT, IAW specifications, as well as the Coefficient Schedule B provided in Section B and RS Means/Unit Price Book/Software.

1. This is a firm fixed price indefinite delivery/indefinite quantity contract for the award of SABER construction services at Malmstrom AFB, MT.

2. Construction projects will be awarded by individual task orders on an as-needed basis. Projects will be in support of real property maintenance, repair, alteration and new construction. The contractor will receive requests for proposal from the government; reference clause 5352.216-9000 and Specification

Division 01010, General Requirements, for specific instructions and detail for proposal submittal.

3. Coefficients: (See Section 01000 of the specifications) a.

In order to be considered for award, the offeror must submit coefficients for CLINs 0001 through 4001 identified above. The purpose of applying the coefficients to direct pre-priced costs from RS MEANS is to compensate the contractor for all of their indirect costs and profit for performance. In order to be considered for award, the offeror must submit coefficients for all contract line items identified in the Coefficient Schedule B.

b. The offerors’ coefficients (in decimal format, no more than 2 decimal places) should contain applicable profit and all burden costs such as design fees, additional bond premiums, insurance, computer system and support costs, compliance with environmental and safety laws, taxes, protection or moving of government property, labor laws and any other associated costs required to perform the work.

c. Coefficients less than “1.00”, as an example, a coefficient of .97 would result in a decrease of (3%) to the pre-priced items in the proposal. The contractor should thoroughly consider all potential costs and proposal environment, before submitting a coefficient less than 1.00 for any item in the Coefficient Schedule B. Offerors submitting separate coefficients for individual tasks will be considered unacceptable and the offer will be rejected.

d.

The contractor’s coefficient will remain the same for the base year and subsequent option years. Individual line item changes will be considered through annual updates to the RS Means Facilities Construction Cost Data.

4. Standard Working Hours: See specification Section 01010, paragraph 3.0.

5. Non-Standard Working Hours: The term “non-standard work hours” is not to be interpreted as “overtime”. See specification Section 01010, paragraph 3.0.

6. Weapons Storage Area – On Malmstrom AFB – Secure Area: Additional costs for working in secure areas on base (additional labor hours, security delays) shall be included in the coefficient.

7. Missile – Off Malmstrom AFB – Secure Area: Additional costs for work at the missile sites (mobilization, mileage, additional labor hours) shall be included into the coefficient. The distance from Malmstrom AFB to the missile sites range approximately 18 miles to 158 miles.

8. The contractor shall furnish to the Government, when required, the supplies or services specified in the Schedule up to the amounts specified under paragraph 13 of this section. Contractor entries are required for contract line items 0001 through 4001 in the Proposal Schedule, Section B. Contractors shall use the Coefficient Schedule B area to enter their proposal coefficients and extended prices.

9. Concurrent with the exercise of any options, current Davis Bacon Wage Decisions will be incorporated and shall be effective for all task orders issued on the first day of the option and through the duration of the option period, (see FAR 52.222-30). The contractor shall compensate all covered employees at not less than the rates specified on the wage determination(s) specified per task order; however, no adjustment will be made relative to incorporation of any wage determination(s) at the inception of each exercised option year. Initial wage determinations specified in a task order, issued in one year where work carries over to a new year, will not change.

10. Non Pre-Priced Item (NPI): NPI coefficient shall be effective for the entire contract performance period including all option periods. For individual task orders, items of work not covered by the RS Means, but within the scope and general intent of the contract may be added by the Contracting Officer. These items may then be incorporated into and made part of the basic contract at the government’s option. For individual task orders, the items shall be provided at the negotiated price, multiplied by the applicable NPI coefficient listed in the contract schedule. The RS MEANS shall be used to the maximum extent. For each task order proposal, NPI items shall be supported by a minimum of three competitive quotes unless waived by the applicable contracting officer. Non-priced items will be renegotiated each year.

11. Work Areas shall be defined as follows:

(a) Non-Secured Area. The lowest level of security exists in general access areas. These areas are all of Malmstrom AFB outside of the USAF controlled areas.

(a) Secured Area. USAF Controlled access areas are the higher-level security areas. Presence within these controlled access areas is by escort; and the movement of authorized personnel in and out of these areas is limited. Contractor personnel are permitted access to these areas on a need basis only.

12. Clauses and provisions in this document will be numbered in sequence, but will not necessarily appear in consecutive order.

13. Sections K, L and M will be deemed incorporated in the resultant award, by reference.

B-2 CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

*MINIMUM GUARANTEED PER CONTRACT

AMOUNT

MAXIMUM PER CONTRACT

AMOUNT

MAXIMUM SABER PROGRAM

AMOUNT

$5,000.00
$20,000,000.00
$40,000,000.00

* Minimum guarantee per contract amount is applicable for the base year only

TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE

The minimum quantity and order value for each task order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each task order issued shall not exceed the maximum quantity and order value stated in the following table.

MINIMUM

AMOUNT

MAXIMUM

AMOUNT

$2,000.00
*$750,000.00 Statutory Cost Limit for minor construction only – $3,000,000.000 limit for repair and maintenance.

* Cost Limitations subject to change based on AFI 32-1032

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been added by reference:

52.236-21
Specifications and Drawings for Construction
FEB 1997

The following have been added by full text:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title File Drawing No.

Drawings will be provided/indentified per task order, as appropriate, and determined by the Contracting Officer. Not all task orders will have initial drawings

(End of clause)

The following have been modified:

DESCRIPTIONS AND SPECS

C-1 SPECIFICATION, STANDARDS AND DRAWINGS IAW FAR 11-201

SPECIFICATIONS: SIMPLIFIED ACQUISITON OF BASE ENGINEERING REQUIREMENTS CONTRACT

The contractor shall furnish all labor, materials, supervision, quality control, testing, equipment and transportation necessary to perform all Task Orders in accordance with drawings and specifications applicable to Malmstrom AFB, that are identified as attachments to this solicitation in Section J hereof.

Specifications, standards or drawings (as applicable) are furnished as Attachment 1, Specifications for Simplified Acquisition of Base Engineering Requirements (SABER), as listed in Section J.

A. Design Drawings

Contractor shall submit Design Drawings with each proposal for each Task Order. The complexity of these drawings will be driven by the complexity of the task. Drawings included with the proposal must be thorough enough to allow the government and contractor to estimate prepriced and non-prepriced items, for the government to monitor the work, and the contractor to execute the work. Refer to Specification Division 01000, for specific details. Once the Task Order is awarded, the design drawings shall become the basis for the record drawings.

B. Record Drawings (As Builts)

During the progress of the work, the Contractor shall keep a stamped SABER office approved set of drawings on the job site. If the Contractor fails to maintain the stamped drawings as required herein, the Contracting Officer will consider that satisfactory progress has not been achieved for the period in question. Final payment will be withheld until As-Built record drawings are submitted to and approved by the applicable Contracting Officer.

The following included by reference have been revised:

52.236-21 Alt I
Specifications and Drawings for Construction (Feb 97) - Alternate I
APR 1984

SECTION E - INSPECTION AND ACCEPTANCE

The following have been modified:

INSPECTION AND ACCEPTANCE

E-1 INSPECTION AND ACCEPTANCE

A. Pre-Final and Final Inspection (Task Orders):

1. Reference Specification Section 01000.

2. The final inspection will be at the project location with the Contractor, the Project Inspector and Contracting Officer and/or administrator on site.

B. Designation of Government Inspector:

The Civil Engineer or authorized representative is designated as the representative of the Contracting Officer for the purpose of serving as the government’s inspector. The designation will be provided to the contractor in writing following contract award. The inspector will perform duties including technical surveillance, ensuring compliance with workmanship and with the plans and specifications of this contract. This provision does not authorize anyone other than the applicable Contracting Officer to commit the government to changes in the terms of a Task Order.

SECTION F - DELIVERIES OR PERFORMANCE

The following have been modified:

DELIVERIES OR PERFORMANCE

I. CONSTRUCTION START UP PERIOD

A. The first 90 days of the performance period of the contract will be designated as a start up period, after which the contractor shall have all equipment and personnel in place to fully execute the requirements of this contract. The contractor will be allowed the first 20 calendar days of the start up period to mobilize without being notified by the applicable Contracting Officer of a performance requirement. During the remainder of the start-up period, the contractor shall have the required capability to accept a volume of government requirements in accordance with the following schedule.

Calendar Days

Required Capability

After Award

(Cumulative Value of Work)

20-29 days after performance period begins

$ 750 Thousand

30-60 days after performance period begins

$ 1.2 Million

61-90 days after performance period begins

$ 2 Million

Contractor shall reach full performance capability by 121 days after performance period begins and meet requirements under contract clause 52.216-19, Order Limitations.

B. During these periods the government may request work over and above the stated capability. The contractor may decline additional work without penalty.

C. Exclusion Periods in Computing Completion Schedules: No work will be required during the exclusion period. Such a period shall not be considered in computing the time allowed for completion. The contractor may, however, perform work during all or any part of this period upon receiving written approval by the applicable Contracting Officer. The contractor shall provide written request to work during the exclusion periods to the applicable contracting officer. Exclusion periods shall be determined for each individual Task Order. This paragraph shall apply to all Task Orders through out the contract performance period and any extension of performance.

II. PERFORMANCE REQUIREMENTS

1. TASK ORDER/TASK ORDER AWARD PROCESS (REF AFFARS Clause 5352.216-9000)

(a) Individual firm fixed priced Task Orders will be issued for requirements covered by the awarded SABER contract.

(b) Project requirements will be issued to each contractor awarded a contract as a result of this solicitation. After receipt of the requirement, Contractors are required to provide a proposal on each project. A scope validation visit will be scheduled and identified in each requirement for the purpose of answering questions and providing clarification of project content. Only one site visit will be held per task order.

(c) The Government intends to evaluate proposals and award task orders without discussions and offerors should initially submit their most competitive proposals in response to project requirements, however, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. Upon receipt of the contractor’s proposal, the Government will review the proposal for completeness. The Government reserves the right to negotiate non-prepriced items and performance times at the time of award.

(d) Contractor’s proposal. Time for submittal of the Contractor’s proposal for each individual requirement will be determined by the Government, but will normally be:

(a) 15 working days for complex task orders

(b) 10 working days for routine task orders

(c) 5 working days for quick response task orders

NOTE: The government reserves the right to request proposal submittals outside the timelines stated above. This will typically be during end of the fiscal year, usually a two month period during the months of August and September, but is not exclusive to this timeframe.

It shall be the mutual goal of the contracting parties to finalize negotiations within 10 working days after submittal of a proposal to the government. A Task Order/Task Order will be issued by the Contracting Officer after negotiations are completed and both parties agree on a price and performance time for the work to be performed.

The following included by reference have been revised:

252.247-7024
Notification Of Transportation Of Supplies By Sea
MAR 2000

SECTION G - CONTRACT ADMINISTRATION DATA

ACCOUNTING & APPRORIATION DATA

At time of task order award, the government will identify accounting and appropriation data. Each Task Order will contain individual accounting and appropriation data.

The following included by full text have been revised:

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (MAR 2008)

(a) Definitions. As used in this clause--

(1) Contract financing payment and invoice payment have the meanings given in section 32.001 of the Federal Acquisition Regulation.

(2) Electronic form means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area WorkFlow (WAWF) or another electronic form authorized by the Contracting Officer.

(3) Payment request means any request for contract financing payment or invoice payment submitted by the Contractor under this contract.

(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/.

(c) The Contractor may submit a payment request and receiving report using other than WAWF only when--

(1) The Contracting Officer authorizes use of another electronic form. With such an authorization, the Contractor and the Contracting Officer shall agree to a plan, which shall include a timeline, specifying when the Contractor will transfer to WAWF;

(2) DoD is unable to receive a payment request or provide acceptance in electronic form;

(3) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer's determination with each request for payment; or

(4) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System).

(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract.

(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payments requests.

(End of clause)

SECTION H - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

SPECIAL CONTRACT REQUIREMENTS

DESIGNATION OF CONTRACTING OFFICER REPRESENTATIVE (COR)

The Base Civil Engineer or his/her authorized representative is designated as the representative of the Contracting Officer (COR) for the purpose of technical surveillance of workmanship and inspection of materials for work being performed under this contract. This designation in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in the terms of the contract. The COR performs quality assurance for the government and is not authorized or required to perform the quality control for the contractor.

NORMAL HOURS OF WORK

(a) Normal work hours for Base Engineering personnel are from 7:00 a.m. to 4:30 p.m., Monday through Friday, excluding Federal holidays. Access to work sites will be restricted to these hours and days, unless otherwise specified in the Statement of Work Section of the Specifications. Work that requires quality assurance during its accomplishment or that cannot be fully inspected after its completion will normally not be allowed to be done during other than normal work hours/days without written Contracting Officer approval or as otherwise specified in the contract.

(b) Normal work hours for Contracting personnel are from 7:30 a.m. to 4:30 p.m., Monday through Friday, excluding Federal holidays. In order to ensure availability of personnel, please schedule your meetings and visits at least 24 hours in advance.

Federal Holidays

New Year’s Day

1 January

Martin Luther King’s Birthday

3rd Monday in January

Presidents Day

3rd Monday in February

Memorial Day

Last Monday in May

Independence Day

4 July

Labor Day

1st Monday in September

Columbus Day

2nd Monday in October

Veterans Day

11 November

Thanksgiving Day

4th Thursday in November

Christmas Day

25 December

Any holiday falling on a Saturday will be observed the preceding Friday. Any holiday falling on a Sunday will be observed the following Monday. The Government anticipates similar days to be granted in subsequent years. “Family Days” are also considered holidays.

WEATHER CONDITIONS

(a) Weather Hazards: The Contractor shall satisfy himself as to the hazards likely to arise from weather conditions. Complete weather records and reports may be obtained from any U.S. Weather Bureau office

(b) High Winds: When warnings of winds of gale force or stronger are issued, Contractor shall take every practicable precaution to minimize damage (including overspray) to persons, work, and adjacent property. These precautions may include removing all stored materials, tools, and/or equipment from exposed locations and removing or securing any temporary structures.

NOTICE OF COMPLETION OF PROJECT / FINAL INSPECTION

(a) Reference Specification Section 01000 for pre-final/final inspection requirements.

TELEPHONE AND INFORMATION TECHNOLOGY COMMUNICATIONS SECURITY MONITORING

Civilian contractor personnel are advised that all telephone and information technology communications are for “Official Use Only.” All communications within DoD organizations and on DoD property are subject to communications security (COMSEC) review. All contractor personnel must be aware that telephone and information technology communication networks are continually subject to intercept by unfriendly intelligence organizations. Any time they use information technology or place/receive a call from or to a USAF organization, they are subject to COMSEC procedures and the communication may be monitored by government personnel. The contractor, therefore, will assume the responsibility for ensuring wide and frequent dissemination of the above information to all employees working on this contract.

SECTION I - CONTRACT CLAUSES

The following have been added by full text:

5352.216-9000 AWARDING ORDERS UNDER MULTIPLE AWARD CONTRACTS (MAR 2007)

(a) All multiple award contractors shall be provided a fair opportunity to be considered for each order in excess of the micro-purchase threshold as defined in FAR 2.101 pursuant to the procedures established in this clause, unless the contracting officer determines that:

(1) The agency’s need for the services or supplies is of such urgency that providing such opportunity to all such contractors would result in unacceptable delays;

(2) Only one such contractor is capable of providing the services or supplies at the level of quality required because the services or supplies ordered are unique or highly specialized;

(3) The task or delivery order should be issued on a sole source basis in the interest of economy or efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity pursuant to the procedures in this clause to be considered for the original order; or

(4) It is necessary to place an order to satisfy a minimum guarantee.

(b) Unless the procedures in paragraph (a) are used for awarding individual orders, multiple award contractors will be provided a fair opportunity to be considered for each order using the following procedures:

[insert Alternate I, Alternate II, or both, as applicable]

(c) Under the provisions of the Federal Acquisition Streamlining Act of 1994, 10 U.S.C. 2304c (Public Law 103-355), a protest is not authorized in connection with the issuance or proposed issuance of an individual task or delivery order except for a protest on the grounds that the order increases the scope, period, or maximum value of the contract under which the order is issued.

(d) This clause does not guarantee the contractor issuance of any task order or delivery order above the minimum guarantee(s) stated in B-2 CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE of this contract.

(End of clause)

5352.216-9000 ALT II AWARDING ORDERS UNDER MULTIPLE AWARD CONTRACTS (JUN 2002)

ALTERNATE II (JUN 2002). When the task or delivery order contract is for services or supplies where the basic contract statement of work is broad and the pricing is less precise, e.g., a list of labor rates, some contact with multiple awardees will be required to ensure fair opportunity and achieve a clear meeting of the minds as to the price and scope of the order. In this case, insert the following paragraph (b), substantially as written, into paragraph (b) of the basic clause:

(1) The Government will request that each multiple award contractor submit their technical and/or managerial approach, if necessary, and cost/price estimate in response to the Government’s work statement.

(2) The response may be presented to the Government either orally or in writing.

(3) The Government will issue orders based on an assessment of technical approach, estimated total cost/price, and/or past performance in making awards under this paragraph. Assessment will be stated in each task order request for proposal (TORFP)

(End of clause)

5352.242-9000 CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (AUGUST 2007)

(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or security police for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, valid vehicle insurance certificate to obtain a vehicle pass.

(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with [insert any additional requirements to comply with AFI 31-101, Volume 1, The Air Force Installation Security Program, and AFI 31-501, Personnel Security Program Management,] citing the appropriate paragraphs as applicable.

(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

(f) Failure to comply with these requirements may result in withholding of final payment.

(End of clause)

The following have been modified:

52.252-4 ALTERATIONS IN CONTRACT (APR 1984)

Portions of this contract are altered as follows:

None

(End of clause)

5352.223-9000

ELIMINATION OF USE OF CLASS I OZONE DEPLETING SUBSTANCES (ODS) (APR 2003)

(a) Unless the requiring activity has obtained prior Senior Acquisition Official (SAO) approval, contractors may not:

(1) Provide any service or product with any specification, standard, drawing, or other document that requires the use of a Class I ODS in the test, operation, or maintenance of any system, subsystem, item, component, or process; or

(2) Provide any specification, standard, drawing, or other document that establishes a test, operation, or maintenance requirement that can only be met by use of a Class I ODS.

[Note: This prohibition does not apply to manufacturing.]

(b) For the purposes of Air Force policy, the following products that are pure (i.e., they meet the relevant product specification identified in AFI 32-7086) are Class I ODSs:

(1) Halons: 1011, 1202, 1211, 1301, and 2402;

(2) Chlorofluorocarbons (CFCs): CFC-11, CFC-12, CFC-13, CFC-111, CFC-112, CFC-113, CFC-114, CFC-115, CFC-211, CFC-212, CFC-213, CFC-214, CFC-215, CFC-216, and CFC-217, and the blends R-500, R-501, R-502, and R-503; and

(3) Carbon Tetrachloride, Methyl Chloroform, and Methyl Bromide.

[NOTE: Material that use one or more of these Class I ODSs as minor constituents do not meet the Air Force definition of a Class I ODS.]

(c) The requiring activity has obtained SAO approval to permit the contractor to use the following Class I ODS(s):

Class I ODS/ Application or Use/Quantity (lbs.) per contract period of performance

NONE, exceptions will be noted on applicable task orders.

(d) The offeror/contractor is required to notify the contracting officer if any Class I ODS that is not specifically listed above is required in the test, operation, or maintenance of any system, subsystem, item, component, or process.

(End of clause)

The following have been deleted:

52.233-2
Service Of Protest
AUG 1996
52.236-21
Specifications and Drawings for Construction
FEB 1997
52.236-21 Alt I
Specifications and Drawings for Construction (Feb 97) - Alternate I
APR 1984
252.236-7001
Contract Drawings, and Specifications
AUG 2000
252.245-7001
Reports Of Government Property
MAY 1994
5352.216-9000
Awarding Orders Under Multiple Award Contracts (AFFARS)
AUG 2004
5352.216-9000 ALT 2
Awarding orders under multiple award contracts (AFFARS)
NOV 2004
5352.228-9500
Insurance Requirements (AFSPCFARS)
NOV 2002
5352.242-9000
Contractor access to Air Force installations (AFFARS)
OCT 2004

The following included by reference have been revised:

52.203-6
Restrictions On Subcontractor Sales To The Government
JUL 1995
52.203-12
Limitation On Payments To Influence Certain Federal Transactions
SEP 2005
52.204-7
Central Contractor Registration
OCT 2003
52.209-6
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
JAN 2005
52.219-9
Small Business Subcontracting Plan
JUL 2005
52.222-26
Equal Opportunity
APR 2002
52.222-35
Equal Opportunity For Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans
DEC 2001
52.222-37
Employment Reports On Special Disabled Veterans, Veterans Of The Vietnam Era, and Other Eligible Veterans
DEC 2001
52.225-11
Buy American Act--Construction Materials Under Trade Agreements
JAN 2006
52.225-13
Restrictions on Certain Foreign Purchases
FEB 2006
52.227-1
Authorization and Consent
JUL 1995
52.227-2
Notice And Assistance Regarding Patent And Copyright Infringement
AUG 1996
52.227-4
Patent Indemnity-Construction Contracts
APR 1984
52.228-15
Performance and Payment Bonds--Construction
SEP 2005
52.232-17
Interest
JUN 1996
52.236-2
Differing Site Conditions
APR 1984
52.242-13
Bankruptcy
JUL 1995
52.243-4
Changes
AUG 1987
52.245-1
Property Records
APR 1984
52.245-2
Government Property (Fixed Price Contracts)
MAY 2004
52.248-3
Value Engineering-Construction
FEB 2000
252.204-7004 Alt A
Central Contractor Registration (52.204-7) Alternate A
NOV 2003
252.209-7001
Disclosure of Ownership or Control by the Government of a Terrorist Country
SEP 2004
252.209-7004
Subcontracting With Firms That Are Owned or Controlled By The Government of a Terrorist Country
MAR 1998
252.219-7003
Small, Small Disadvantaged and Women-Owned Small Business Subcontracting Plan (DOD Contracts)
APR 1996
252.247-7022
Representation Of Extent Of Transportation Of Supplies By Sea
AUG 1992
252.247-7023
Transportation of Supplies by Sea
MAY 2002
252.247-7023 Alt III
Transportation of Supplies by Sea (May 2002) Alternate III
MAY 2002

52.223-14 TOXIC CHEMICAL RELEASE REPORTING (AUG 2003)

(a) Unless otherwise exempt, the Contractor, as owner or operator of a facility used in the performance of this contract, shall file by July 1 for the prior calendar year an annual Toxic Chemical Release Inventory Form (Form R) as described in sections 313(a) and (g) of the Emergency Planning and Community Right-to-Know Act of 1986 (EPCRA) (42 U.S.C. 11023(a) and (g)), and section 6607 of the Pollution Prevention Act of 1990 (PPA) (42 U.S.C. 13106). The Contractor shall file, for each facility subject to the Form R filing and reporting requirements, the annual Form R throughout the life of the contract.

(b) A Contractor-owned or -operated facility used in the performance of this contract is exempt from the requirement to file an annual Form R if--

(1) The facility does not manufacture, process, or otherwise use any toxic chemicals listed in 40 CFR 372.65;

(2) The facility does not have 10 or more full-time employees as specified in section 313(b)(1)(A) of EPCRA, 42 U.S.C. 11023(b)(1)(A);

(3) The facility does not meet the reporting thresholds of toxic chemicals established under of EPCRA, 42 U.S.C. 11023(f) (including the alternate thresholds at 40 CFR 372.27, provided an appropriate certification form has been filed with EPA);

(4) The facility does not fall within the following Standard Industrial Classification (SIC) codes or their corresponding North American Industry Classification System sectors:

(i) Major group code 10 (except 1011, 1081, and 1094.

(ii) Major group code 12 (except 1241).

(iii) Major group codes 20 through 39.

(iv) Industry code 4911, 4931, or 4939 (limited to facilities that combust coal and/or oil for the purpose of generating power for distribution in commerce).

(v) Industry code 4953 (limited to facilities regulated under the Resource Conservation and Recovery Act, Subtitle C (42 U.S.C. 6921, et seq.)), 5169, 5171, or 7389 (limited to facilities primarily engaged in solvent recovery services on a contract or fee basis); or

(5) The facility is not located in the United States or its outlying areas.

(c) If the Contractor has certified to an exemption in accordance with one or more of the criteria in paragraph (b) of this clause, and after award of the contract circumstances change so that any of its owned or operated facilities used in the performance of this contract is no longer exempt--

(1) The Contractor shall notify the Contracting Officer; and

(2) The Contractor, as owner or operator of a facility used in the performance of this contract that is no longer exempt, shall (i) submit a Toxic Chemical Release Inventory Form (Form R) on or before July 1 for the prior calendar year during which the facility becomes eligible; and (ii) continue to file the annual Form R for the life of the contract for such facility.

(d) The Contracting Officer may terminate this contract or take other action as appropriate, if the Contractor fails to comply accurately and fully with the EPCRA and PPA toxic chemical release filing and reporting requirements.

(e) Except for acquisitions of commercial items, as defined in FAR Part 2, the Contractor shall--

(1) For competitive subcontracts expected to exceed $100,000 (including all options), include a solicitation provision substantially the same as the provision at FAR 52.223-13, Certification of Toxic Chemical Release Reporting; and

(2) Include in any resultant subcontract exceeding $100,000 (including all options), the substance of this clause, except this paragraph (e).

(End of clause)

52.233-1 Disputes. (JUL 2002)

(a) This contract is subject to the Contract Disputes Act of 1978, as amended (41 U.S.C. 601-613).

(b) Except as provided in the Act, all disputes arising under or relating to this contract shall be resolved under this clause.

(c) Claim, as used in this clause, means a written demand or written assertion by one of the contracting parties seeking, as a matter of…