SABER Historical Data
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet3
| History of Current Saber Contract Awards | |||||
| FY 2002 | |||||
| PN | DO | Project Name | Base Amount | Mod Amount | Total |
| 01-7027A | 6001 | PCB Site Remediation | 63,568.84 | 11,826.26 | $75,395.10 |
| 01-4007 | 6002 | 901 Gumwood Closets | 4,213.35 | $4,213.35 | |
| 01-4005 | 6003 | 606 Aspen Wet Basement Repair | 3,359.26 | $3,359.26 | |
| 01-1014 | 6004 | Repair BX Gas Station Canopy | 6,446.46 | $6,446.46 | |
| 99-1002 | 6005 | Expand OSKE Vault, Bldg 500 | 336,107.00 | 43,536.00 | $379,643.00 |
| 86-0110 | 6006 | Renovate VOQ Parking Area | 59,296.96 | 12,627.30 | $71,924.26 |
| 98-1117 | 6007 | Construct Tacan Bldg | 32,052.00 | 6,743.00 | $38,795.00 |
| 94-0044 | 6008 | Construct Lift Pump House WSA | 34,493.40 | $34,493.40 | |
| 97-4210-6 | 6009 | Renovate Interiors, Lincoln Drive | 446,267.37 | $446,267.37 | |
| 99-1047 | 6010 | Install Touchless Carwash | 85,223.00 | 4,008.00 | $89,231.00 |
| 01-4009 | 6011 | Sealup Capehart Housing, Phase 3 | 24,993.51 | 31,323.21 | $56,316.72 |
| 01-1037 | 6012 | Correct Drainage, Bldg 1697 | 25,911.00 | $25,911.00 | |
| 01-8005 | 6013 | Renovate Clinic, Phase 3 | 87,117.80 | $87,117.80 | |
| 01-1006 | 6014 | Bldg 500 Sill Replacement | 12,572.27 | $12,572.27 | |
| 95-0024-3 | 6015 | HTHW Valve Screen Enclosure | 23,798.32 | 864.00 | $24,662.32 |
| 95-0024 | 6016 | Construct Dumpster Screen Enclosures | 43,837.45 | $43,837.45 | |
| 96-1167 | 6017 | Vehicle Maintenance Fence | 192,937.00 | 9,647.00 | $202,584.00 |
| 00-4019 | 6018 | Replace Canopies, Lincoln Drive | 282,278.79 | $282,278.79 | |
| 00-4002 | 6019 | Construct Sidewalks, Capehart Housing | 77,982.00 | 1,354.66 | $79,336.66 |
| 01-4002 | 6020 | Construct Playground | 75,178.56 | 1,651.07 | $76,829.63 |
| 02-4003A | 6021 | Gumwood 1/2 Bath | 10,998.00 | $10,998.00 | |
| 00-4023 | 6022 | Repair Water Service Lines Lincoln Drive | 115,000.00 | -22,279.06 | $92,720.94 |
| 02-4017 | 6023 | Water Leak 1108 Hawthorne | 3,636.09 | 506.91 | $4,143.00 |
| 00-1019 | 6024 | Replace Windows, Base Chapel | 33,811.98 | 60,001.88 | $93,813.86 |
| 99-1042 | 6025 | Install Block Heater Plug-Ins, Dormitories | 107,913.69 | -2,833.85 | $105,079.84 |
| 01-4008 | 6026 | Repair Capehart Kitchen Cabinets | 40,000.00 | 117,886.40 | $157,886.40 |
| 01-1026 | 6027 | Entertainment Center Remodel | 137,501.62 | 20,513.68 | $158,015.30 |
| 02-4016 | 6028 | Relocateable Housing Site Restoration | 86,373.00 | 71,876.00 | $158,249.00 |
| 00-4019-2 | 6029 | Replace Canopies/Stoops, Lincoln Drive | 345,000.00 | 8,032.93 | $353,032.93 |
| 02-1501 | 6030 | Repair Siding, Bldg 1439 | 48,594.00 | $48,594.00 | |
| 00-1006 | 6031 | Replace Perimeter Fence | 448,017.40 | 8,822.06 | $456,839.46 |
| 02-1031 | 6032 | Construct CMU Screen Fence, 10th Ave N | 89,483.22 | 6,646.85 | $96,130.07 |
| $3,383,963.34 | $392,754.30 | $3,776,717.64 | |||
| FY 2003 | |||||
| 02-1038A | 6101 | Softball 2 | 5,926.63 | 2,061.95 | $7,988.58 |
| 99-1037-1 | 6102 | LD Housing | 595,000.00 | -539,400.80 | $55,599.20 |
| Sequence | 55,599.18 | $55,599.18 | |||
| Model Unit | 10,938.03 | 0.00 | $10,938.03 | ||
| Phase 1 | 8,389.31 | 0.00 | $8,389.31 | ||
| Phase 1 | 9,224.37 | 0.00 | $9,224.37 | ||
| Phase 1 | 8,541.59 | 0.00 | $8,541.59 | ||
| Phase 1 | 9,282.57 | 0.00 | $9,282.57 | ||
| Phase 1 | 9,223.31 | 0.00 | $9,223.31 | ||
| $0.00 | |||||
| 97-4010-8 | 6103 | LD Housing | 400,000.00 | -3,943.83 | $396,056.17 |
| Sequence | 396,664.15 | $396,664.15 | |||
| Phase 1 | 17,625.28 | $17,625.28 | |||
| Phase 1 | 17,094.17 | $17,094.17 | |||
| Phase 1 | 17,694.78 | $17,694.78 | |||
| Phase 1 | 17,307.24 | $17,307.24 | |||
| Phase 1 | 14,820.24 | $14,820.24 | |||
| Phase 2 | 17,209.92 | $17,209.92 | |||
| Phase 2 | 17,815.05 | $17,815.05 | |||
| Phase 2 | 17,821.60 | $17,821.60 | |||
| Phase 2 | 12,885.64 | $12,885.64 | |||
| Phase 2 | 17,129.38 | $17,129.38 | |||
| Phase 3 | 16,095.44 | $16,095.44 | |||
| Phase 3 | 16,034.22 | $16,034.22 | |||
| Phase 3 | 14,104.77 | $14,104.77 | |||
| Phase 3 | 16,320.85 | $16,320.85 | |||
| Phase 3 | 14,252.31 | $14,252.31 | |||
| Phase 4 | 16,714.56 | $16,714.56 | |||
| Phase 4 | 16,118.49 | $16,118.49 | |||
| Phase 4 | 18,106.86 | $18,106.86 | |||
| Phase 4 | 17,366.17 | $17,366.17 | |||
| Phase 4 | 18,157.76 | $18,157.76 | |||
| Phase 5 | 17,259.18 | $17,259.18 | |||
| Phase 5 | 17,354.97 | $17,354.97 | |||
| Phase 5 | 17,040.67 | $17,040.67 | |||
| Phase 5 | 14,334.60 | $14,334.60 | |||
| $0.00 | |||||
| 02-4001 | 6104 | Capehart | 650,000.00 | 23,800.00 | $673,800.00 |
| Sequence | 462,282.53 | $462,282.53 | |||
| Model Unit | 16,075.91 | $16,075.91 | |||
| $0.00 | |||||
| Titan, Ph1 | 22,641.75 | $22,641.75 | |||
| Titan, Ph1 | 17,433.25 | $17,433.25 | |||
| Titan, Ph1 | 18,652.38 | $18,652.38 | |||
| Titan, Ph1 | 16,052.21 | $16,052.21 | |||
| Titan, Ph1 | 16,052.21 | $16,052.21 | |||
| $0.00 | |||||
| $0.00 | |||||
| Titan, Ph2 | 18,652.38 | $18,652.38 | |||
| Titan, Ph2 | 16,052.21 | $16,052.21 | |||
| Titan, Ph2 | 17,433.25 | $17,433.25 | |||
| Titan, Ph2 | 16,052.21 | $16,052.21 | |||
| Titan, Ph2 | 18,652.38 | $18,652.38 | |||
| $0.00 | |||||
| $0.00 | |||||
| Titan, Ph3 | 18,652.38 | $18,652.38 | |||
| Titan, Ph3 | 18,652.38 | $18,652.38 | |||
| Titan, Ph3 | 18,652.38 | $18,652.38 | |||
| Titan, Ph3 | 16,052.21 | $16,052.21 | |||
| Titan, Ph3 | 16,052.21 | $16,052.21 | |||
| Titan, Ph3 | 18,652.38 | $18,652.38 | |||
| Titan, Ph3 | 17,433.25 | $17,433.25 | |||
| $0.00 | |||||
| $0.00 | |||||
| Titan, Ph3 | 196.43 | $196.43 | |||
| $0.00 | |||||
| Titan, Ph4 | 18,652.38 | $18,652.38 | |||
| Titan, Ph4 | 16,052.21 | $16,052.21 | |||
| Titan, Ph4 | 16,052.21 | $16,052.21 | |||
| Titan, Ph4 | 18,652.38 | $18,652.38 | |||
| Titan, Ph4 | 17,433.25 | $17,433.25 | |||
| Titan, Ph4 | 22,641.75 | $22,641.75 | |||
| Titan, Ph4 | 18,652.38 | $18,652.38 | |||
| Titan, Ph4 | 16,052.21 | $16,052.21 | |||
| $0.00 | |||||
| $0.00 | |||||
| Peacekeeper | $0.00 | ||||
| Peacekeeper | $0.00 | ||||
| Peacekeeper | $0.00 | ||||
| Peacekeeper | $0.00 | ||||
| Peacekeeper | $0.00 | ||||
| Peacekeeper | $0.00 | ||||
| Peacekeeper | $0.00 | ||||
| Peacekeeper | $0.00 | ||||
| Peacekeeper | $0.00 | ||||
| Peacekeeper | $0.00 | ||||
| Peacekeeper | $0.00 | ||||
| Peacekeeper | $0.00 | ||||
| Peacekeeper | $0.00 | ||||
| Peacekeeper | $0.00 | ||||
| Peacekeeper | $0.00 | ||||
| Peacekeeper | $0.00 | ||||
| Peacekeeper | $0.00 | ||||
| $0.00 | |||||
| 95-9031E | 6105 | MFH | 200,000.00 | -62.69 | $199,937.31 |
| Sequence | 30,322.55 | $30,322.55 | |||
| Model 1 | 2,611.04 | 0.00 | $2,611.04 | ||
| Model 2 | 805.29 | $805.29 | |||
| $0.00 | |||||
| Negotiated | 26,906.22 | 0.00 | $26,906.22 | ||
| Actual | 19,302.36 | 0.00 | $19,302.36 | ||
| MMV 1 - 01 | 584.92 | $584.92 | |||
| MMV 1 - 02 | 584.92 | $584.92 | |||
| MMV 1 - 03 | 584.92 | $584.92 | |||
| MMV 1 - 04 | 584.92 | $584.92 | |||
| MMV 1 - 05 | 584.92 | $584.92 | |||
| MMV 1 - 06 | 584.92 | $584.92 | |||
| MMV 1 - 07 | 584.92 | $584.92 | |||
| MMV 1 - 08 | 584.92 | $584.92 | |||
| MMV 1 - 09 | 584.92 | $584.92 | |||
| MMV 1 - 10 | 584.92 | $584.92 | |||
| MMV 1 - 11 | 584.92 | $584.92 | |||
| MMV 1 - 12 | 584.92 | $584.92 | |||
| MMV 1 - 13 | 584.92 | $584.92 | |||
| MMV 1 - 14 | 584.92 | $584.92 | |||
| MMV 1 - 15 | 584.92 | $584.92 | |||
| MMV 1 - 16 | 584.92 | $584.92 | |||
| MMV 1 - 17 | 584.92 | $584.92 | |||
| MMV 1 - 18 | 584.92 | $584.92 | |||
| MMV 1 - 19 | 584.92 | $584.92 | |||
| MMV 1 - 20 | 584.92 | $584.92 | |||
| MMV 1 - 21 | 584.92 | $584.92 | |||
| MMV 1 - 22 | 584.92 | $584.92 | |||
| MMV 1 - 23 | 584.92 | $584.92 | |||
| MMV 1 - 24 | 584.92 | $584.92 | |||
| MMV 1 - 25 | 584.92 | $584.92 | |||
| MMV 1 - 26 | 584.92 | $584.92 | |||
| MMV 1 - 27 | 584.92 | $584.92 | |||
| MMV 1 - 28 | 584.92 | $584.92 | |||
| MMV 1 - 29 | 584.92 | $584.92 | |||
| MMV 1 - 30 | 584.92 | $584.92 | |||
| MMV 1 - 31 | 584.92 | $584.92 | |||
| MMV 1 - 32 | 584.92 | $584.92 | |||
| MMV 1 - 33 | 584.92 | $584.92 | |||
| MMV 1 - 34 | $0.00 | ||||
| MMV 1 - 35 | $0.00 | ||||
| MMV 1 - 36 | $0.00 | ||||
| MMV 1 - 37 | $0.00 | ||||
| MMV 1 - 38 | $0.00 | ||||
| MMV 1 - 39 | $0.00 | ||||
| MMV 1 - 40 | $0.00 | ||||
| MMV 1 - 41 | $0.00 | ||||
| MMV 1 - 42 | $0.00 | ||||
| MMV 1 - 43 | $0.00 | ||||
| MMV 1 - 44 | $0.00 | ||||
| MMV 1 - 45 | $0.00 | ||||
| MMV 1 - 46 | $0.00 | ||||
| $0.00 | |||||
| Capehart 1 | $0.00 | ||||
| Capehart 2 | $0.00 | ||||
| $0.00 | |||||
| 02-1034A | 6106 | Bldg 165 | 103,565.94 | 3,699.81 | $107,265.75 |
| 03-1011 | 6107 | Bldg 500 | 460,000.00 | 42,764.47 | $502,764.47 |
| 00-1019B | 6108 | Bldg 1199 | 38,300.82 | 0.00 | $38,300.82 |
| 03-1013 | 6109 | Bldg 450 | 56,871.90 | 0.00 | $56,871.90 |
| 02-1037A | 6110 | Rpr HTHW System Phase 1 | 240,236.68 | 3,886.61 | $244,123.29 |
| 98-3002 | 6111 | Bldg 1441 | 26,485.98 | 1,666.14 | $28,152.12 |
| 03-1052 | 6112 | Bldg 1010 | 122,380.41 | 4,275.67 | $126,656.08 |
| 02-1037B | 6113 | Rpr HTHW System Phase 2 | 583,699.08 | 10,854.32 | $594,553.40 |
| 02-1019 | 6114 | Bldg 1705 | 34,067.77 | 0.00 | $34,067.77 |
| 02-1014A | 6115 | Bldg 1240 | 26,014.03 | 1,969.56 | $27,983.59 |
| 03-1011 | 6116 | Bldg 500 | 276,707.56 | 65,713.22 | $342,420.78 |
| 87-6089A | 6117 | Missile Field | 200,000.00 | 0.00 | $200,000.00 |
| 00-1002 | 6118 | Construct FD Storage Bldg 347 | 244,919.81 | 0.00 | $244,919.81 |
| $2,413,834.90 | $134,829.80 | $2,548,664.70 | |||
| FY 2004 | |||||
| 03-1043 | 6201 | Install Fire Door, Youth Center | $9,071.17 | $1,420.11 | $10,491.28 |
| 95-9031-E | 6202 | IDIQ Wet Basements | $114,000.00 | $114,000.00 | |
| 04-1015 | 6203 | Resurface Running Track | $143,193.63 | $1,983.37 | $145,177.00 |
| 768897 | 6204 | Demolish 804/806 Gumwood Drive | $41,950.58 | $0.00 | $41,950.58 |
| 03-1011 | 6205 | Construct Offices, 341 MXG | $160,518.86 | $2,478.11 | $162,996.97 |
| 04-1019 | 6206 | New Entrance/ Window Latch 1152 | $29,570.26 | $6,870.48 | $36,440.74 |
| 02-0005-D | 6207 | Renovate Central Destruct Facility | $31,798.00 | $2,627.10 | $34,425.10 |
| 99-4006N | 6208 | Cap Gas Lines Dogwood | $6,540.82 | $0.00 | $6,540.82 |
| 03-1015 | 6209 | Bldg 165 parking | $200,000.00 | $24,226.30 | $224,226.30 |
| 64-0000 | 6210 | Diverter Valve at Fuel Tanks | $44,910.53 | $2,172.43 | $47,082.96 |
| 30-0036C | 6211 | secondary leak protection at MAFs | $85,700.00 | ($47,756.84) | $37,943.16 |
| 01-4001-B | 6212 | A/C for Capehart Housing | $192,000.00 | ($2,328.46) | $189,671.54 |
| 03-1011-B | 6213 | 741 command sec bldg 500 | $110,000.00 | $4,303.98 | $114,303.98 |
| 01-1022 | 6214 | VOQ parking log | $126,800.00 | $18,286.36 | $145,086.36 |
| 02-1501A | 6215 | Building 1439 siding | $471,869.19 | $14,871.82 | $486,741.01 |
| 02-2014 | 6216 | MAF Carpet Headliners | $80,000.00 | $115,592.80 | $195,592.80 |
| 03-1002 | 6217 | Bldg 500 Wing Conf Room | $201,843.63 | $4,726.17 | $206,569.80 |
| 98-1138 | 6218 | Bldg. 500 Common Areas | $528,000.00 | ($32,023.46) | $495,976.54 |
| 86-0001DQ-1 | 6219 | Insulation Matador Manor | $25,966.44 | $25,966.44 | |
| 02-2031 | 6220 | Paint Heli Pads | $35,495.80 | $35,495.80 | |
| 03-1015P | 6221 | Harden Perimeter Fence | $258,295.97 | $258,295.97 | |
| 01-1018 | 6222 | Library Drainage at entrance | $4,214.69 | $4,214.69 | |
| 02-1049D | 6223 | Landscape Chip | $26,937.05 | $1,417.00 | $28,354.05 |
| 00-4021B | 6224 | Various Fence Hardening | $100,000.00 | $100,000.00 | |
| 04-1069 | 6225 | Ed Center Bathrooms | $72,941.35 | $7,701.10 | $80,642.45 |
| 04-1050 | 6226 | CORS Station | $11,631.91 | $11,631.91 | |
| 03-1017 | 6227 | UBM Sprinkler System | $65,500.00 | ($63,906.43) | $1,593.57 |
| 03-1015P | 6228 | Harden Perimeter Fence, Site B | $50,000.00 | $45,931.84 | $95,931.84 |
| $3,228,749.88 | $108,593.78 | $3,337,343.66 | |||
| FY 2005 | |||||
| 05-1019 | 6301 | Video Teleconference Room Renovation | $43,535.51 | $1,621.95 | $45,157.46 |
| 04-1007 | 6302 | Replace Lift Station Pumps, Bldg 1450 | $66,088.73 | $1,539.04 | $67,627.77 |
| 05-1032 | 6303 | Barrier Power, 5 Sites | $54,806.63 | $54,806.63 | |
| 04-4001C | 6304 | Capehart A/C Phase III | $193,703.92 | $193,703.92 | |
| 05-1060 | 6305 | Chapel Marquee Roof | $2,105.67 | $2,105.67 | |
| 05-1015 | 6306 | Ed Center Break Room | $28,343.80 | $28,343.80 | |
| 04-4001D | 6307 | Capehart A/C Phase IV | $297,473.87 | $6,918.00 | $304,391.87 |
| 05-1030 | 6308 | Maintain Dorm 640 Bathrooms | $61,218.04 | $277.11 | $61,495.15 |
| 02-1018 | 6309 | Install M203 Firing Platform | $55,793.24 | $55,793.24 | |
| 98-1127 | 6310 | Renov K-9 Training Area | $145,836.00 | $145,836.00 | |
| 02-1030 | 6311 | M-9 Range Ventilation | $177,230.46 | $3,591.12 | $180,821.58 |
| 05-4004 | 6312 | CMU Screen Minuteman Village | $499,856.21 | $499,856.21 | |
| 04-1068 | 6313 | Maintain 500 (3rd Floor and Stairwells) | $201,619.97 | ($23,369.73) | $178,250.24 |
| 03-1015Q | 6314 | Harden Perimeter Fence | $241,253.00 | $51,967.94 | $293,220.94 |
| 05-0800 | 6315 | Supply New Liebert Unit IT Room | $92,571.38 | $92,571.38 | |
| 05-0800 | 6316 | Renovate Darkroom | $4,722.79 | $127.51 | $4,850.30 |
| 05-0800 | 6317 | Command Area Renovation | $57,356.52 | $1,497.66 | $58,854.18 |
| 05-0800 | 6318 | Group Assembly Area | $50,132.65 | $2,370.61 | $52,503.26 |
| 05-800 | 6319 | Physical Therapy & MCC Corridor Remodel | $29,776.27 | $1,441.71 | $31,217.98 |
| $2,303,424.66 | $47,982.92 | $2,351,407.58 | |||
| FY 2006 | |||||
| 06-1007 | 6401 | South Gate Repair | $435,900.00 | $13,788.23 | $449,688.23 |
| 06-1006 | 6402 | Renovate CEC Office | $19,256.00 | $3,619.65 | $22,875.65 |
| 06-4001 | 6403 | Repair 714 Gumwood Garage | $3,184.42 | $3,184.42 | |
| 04-1001 | 6404 | Water Utility System Security | $300,000.00 | -$736.69 | $299,263.31 |
| 02-1049C | 6405 | Base Landscaping | $205,503.43 | $243.31 | $205,746.74 |
| 06-1006A | 6406 | Renovate CS/SABER | $43,873.78 | $1,897.87 | $45,771.65 |
| 06-4000 | 6407 | Replace Gumwood Roofing | $177,024.92 | $177,024.92 | |
| 06-1003 | 6408 | Maintain Bldg 500 Restrooms | $0.00 | $0.00 | |
| 05-1023 | 6409 | Renovate Bldg 160, Red Horse | $234,594.88 | $52,199.13 | $286,794.01 |
| 06-4004 | 6410 | Repair Basements Locust/Briarwood | $19,302.65 | $4,867.22 | $24,169.87 |
| 05-1023 | 6411 | Renovate Wing Commanders Suite | $361,291.00 | $28,557.68 | $389,848.68 |
| 36883 | 6412 | Install Vauld Door, Bldg 165 | $2,861.45 | $2,042.88 | $4,904.33 |
| 06-1006B | 6413 | Renovate Engineering Offices | $64,643.96 | $2,042.88 | $66,686.84 |
| 06-1045 | 6414 | Repair Culvert, Outfall #4 | $0.00 | $0.00 | |
| 200045 | 6415 | Install Barbed Wire at Rubble Pile | $7,634.24 | $7,634.24 | |
| 05-4004A | 6416 | Install CMU Fence South Side of 10th Ave No. | $378,866.32 | $15,206.24 | $394,072.56 |
| 200045A | 6417 | Install Chain Link Fence at Wood Pile | $26,498.34 | $26,498.34 | |
| $1,867,436.49 | $18,812.37 | $1,886,248.86 | |||
| FY 2007 | |||||
| 07-1009 | 6501 | Install Sidewalk at Base Pool | $3,578.36 | $3,578.36 | |
| 07-1004 | 6502 | Install Chainlink Fence on Coal Plant Road | $178,660.89 | -$64.03 | $178,596.86 |
| 96-2002 | 6503 | Renovate Bldg 20, TRF Facility | $121,176.28 | $121,176.28 | |
| 96-2002 | 6504 | Construct Garage at I-1 Maf | $189,122.29 | $189,122.29 | |
| 05-1014 | 6505 | Renovate Bldg 349 Kitchen/Dinning Area | $80,917.33 | $118.97 | $81,036.30 |
| 06-4004A | 6506 | Repair Roof at 908/910 Ironwood | $17,280.57 | $17,280.57 | |
| 06-4003 | 6507 | Repair Walking Trails | $118,567.64 | $118,567.64 | |
| 06-1035 | 6508 | Construct Comm Switch Facility | $117,118.69 | $117,118.69 | |
| 06-103 | 6509 | Maintain Bldg 500, Restrooms | $267,712.66 | $267,712.66 | |
| 07-4000 | 6510 | Correct Drainage in Matador Manor | $19,398.29 | $19,398.29 | |
| 07-1019 | 6511 | Repair Wet Basement MFH | $18,486.04 | $18,486.04 | |
| 07-1020 | 6512 | Install Vinyl Fence RV Parking Lot | $62,792.75 | $62,792.75 | |
| 07-1021 | 6513 | Install Sump Alarms Bldg 631 | $4,966.35 | $4,966.35 | |
| 06-1004A | 6514 | Repair Wet Basement Bldg 500 | $158,792.48 | $158,792.48 | |
| 07-1022 | 6515 | Repair Sink Drain, Bldg 470 | $9,797.92 | $9,797.92 | |
| 07-2001 | 6516 | Renovate MAF Bathrooms | $402,375.33 | $402,375.33 | |
| 98-1108 | 6517 | Repair TMO Parking Lot, Rear | $490,566.53 | $490,566.53 | |
| 06-4002 | 6518 | Construct Playground MFH | $111,866.11 | $111,866.11 | |
| 05-4004B | 6519 | CMU Screen Fence Phase IV | $491,968.94 | $491,968.94 | |
| 07-4002 | 6520 | Install Sidewalk on 10th Ave No. | $114,056.54 | $114,056.54 | |
| 07-1024 | 6521 | Install Irrigation/Sod at Bowling Alley | $14,074.71 | $14,074.71 | |
| $2,993,276.70 | $54.94 | $2,993,331.64 |