10HistoricalData_Atch8.xls

XLS spreadsheet 60 KB Posted

Attached to
Simplified Base Engineering Requirements (SABER) Construction Services for Malmstrom AFB Federal contract opportunity
Solicitation number
FA4626-08-R-0001
Issued by
Department of the Air Force Global Strike Command

About this file

SABER Historical Data

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Base Engineering Requirements (SABER) Construction Services for Malmstrom AFB, newest first.
File Type Posted
Synopsis for Award B-5.doc DOC document
SABER08R0001Amend0002.doc DOC document
02 SABER RFP 08R0001Amend0001.doc DOC document
03 Spec INDEX.DOC DOC document
04 SABER Contract Specifications.doc DOC document
01 SABERSF 30 08R0001Amend0001.doc DOC document
05 SABER SOW 8 Apr 08 Atch 2.docm DOCM document
Questions and Answers.doc DOC document
SiteVisitMtgMinutes.pdf PDF
1435 00-0000-a5Atch12.zip ZIP file
04SABERSOW_24Oct07_Atch2.doc DOC document
03REVISEDSABERSPECS1FEB08Atch1.pdf PDF
1435 DrawingSet_Atch12.zip ZIP file
13SubmittalSchedule_DemoProj_Atch11.doc DOC document
02SABER08R0001.doc DOC document
01TOC_Solicitation.docm DOCM document
05WageDetMT070005_Building_Atch3.doc DOC document
07WageDetMT070002_Highway_Atch5.doc DOC document
12BlankEstSheets_DemoProj_atch10.pdf PDF
06WageDetMT070001_HeavyAtch4.doc DOC document
09PastPerformanceQuestionaire_Atch7.docm DOCM document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet3

History of Current Saber Contract Awards
FY 2002
PNDOProject NameBase AmountMod AmountTotal
01-7027A6001PCB Site Remediation63,568.8411,826.26$75,395.10
01-40076002901 Gumwood Closets4,213.35$4,213.35
01-40056003606 Aspen Wet Basement Repair3,359.26$3,359.26
01-10146004Repair BX Gas Station Canopy6,446.46$6,446.46
99-10026005Expand OSKE Vault, Bldg 500336,107.0043,536.00$379,643.00
86-01106006Renovate VOQ Parking Area59,296.9612,627.30$71,924.26
98-11176007Construct Tacan Bldg32,052.006,743.00$38,795.00
94-00446008Construct Lift Pump House WSA34,493.40$34,493.40
97-4210-66009Renovate Interiors, Lincoln Drive446,267.37$446,267.37
99-10476010Install Touchless Carwash85,223.004,008.00$89,231.00
01-40096011Sealup Capehart Housing, Phase 324,993.5131,323.21$56,316.72
01-10376012Correct Drainage, Bldg 169725,911.00$25,911.00
01-80056013Renovate Clinic, Phase 387,117.80$87,117.80
01-10066014Bldg 500 Sill Replacement12,572.27$12,572.27
95-0024-36015HTHW Valve Screen Enclosure23,798.32864.00$24,662.32
95-00246016Construct Dumpster Screen Enclosures43,837.45$43,837.45
96-11676017Vehicle Maintenance Fence192,937.009,647.00$202,584.00
00-40196018Replace Canopies, Lincoln Drive282,278.79$282,278.79
00-40026019Construct Sidewalks, Capehart Housing77,982.001,354.66$79,336.66
01-40026020Construct Playground75,178.561,651.07$76,829.63
02-4003A6021Gumwood 1/2 Bath10,998.00$10,998.00
00-40236022Repair Water Service Lines Lincoln Drive115,000.00-22,279.06$92,720.94
02-40176023Water Leak 1108 Hawthorne3,636.09506.91$4,143.00
00-10196024Replace Windows, Base Chapel33,811.9860,001.88$93,813.86
99-10426025Install Block Heater Plug-Ins, Dormitories107,913.69-2,833.85$105,079.84
01-40086026Repair Capehart Kitchen Cabinets40,000.00117,886.40$157,886.40
01-10266027Entertainment Center Remodel137,501.6220,513.68$158,015.30
02-40166028Relocateable Housing Site Restoration86,373.0071,876.00$158,249.00
00-4019-26029Replace Canopies/Stoops, Lincoln Drive345,000.008,032.93$353,032.93
02-15016030Repair Siding, Bldg 143948,594.00$48,594.00
00-10066031Replace Perimeter Fence448,017.408,822.06$456,839.46
02-10316032Construct CMU Screen Fence, 10th Ave N89,483.226,646.85$96,130.07
$3,383,963.34$392,754.30$3,776,717.64
FY 2003
02-1038A6101Softball 25,926.632,061.95$7,988.58
99-1037-16102LD Housing595,000.00-539,400.80$55,599.20
Sequence55,599.18$55,599.18
Model Unit10,938.030.00$10,938.03
Phase 18,389.310.00$8,389.31
Phase 19,224.370.00$9,224.37
Phase 18,541.590.00$8,541.59
Phase 19,282.570.00$9,282.57
Phase 19,223.310.00$9,223.31
$0.00
97-4010-86103LD Housing400,000.00-3,943.83$396,056.17
Sequence396,664.15$396,664.15
Phase 117,625.28$17,625.28
Phase 117,094.17$17,094.17
Phase 117,694.78$17,694.78
Phase 117,307.24$17,307.24
Phase 114,820.24$14,820.24
Phase 217,209.92$17,209.92
Phase 217,815.05$17,815.05
Phase 217,821.60$17,821.60
Phase 212,885.64$12,885.64
Phase 217,129.38$17,129.38
Phase 316,095.44$16,095.44
Phase 316,034.22$16,034.22
Phase 314,104.77$14,104.77
Phase 316,320.85$16,320.85
Phase 314,252.31$14,252.31
Phase 416,714.56$16,714.56
Phase 416,118.49$16,118.49
Phase 418,106.86$18,106.86
Phase 417,366.17$17,366.17
Phase 418,157.76$18,157.76
Phase 517,259.18$17,259.18
Phase 517,354.97$17,354.97
Phase 517,040.67$17,040.67
Phase 514,334.60$14,334.60
$0.00
02-40016104Capehart650,000.0023,800.00$673,800.00
Sequence462,282.53$462,282.53
Model Unit16,075.91$16,075.91
$0.00
Titan, Ph122,641.75$22,641.75
Titan, Ph117,433.25$17,433.25
Titan, Ph118,652.38$18,652.38
Titan, Ph116,052.21$16,052.21
Titan, Ph116,052.21$16,052.21
$0.00
$0.00
Titan, Ph218,652.38$18,652.38
Titan, Ph216,052.21$16,052.21
Titan, Ph217,433.25$17,433.25
Titan, Ph216,052.21$16,052.21
Titan, Ph218,652.38$18,652.38
$0.00
$0.00
Titan, Ph318,652.38$18,652.38
Titan, Ph318,652.38$18,652.38
Titan, Ph318,652.38$18,652.38
Titan, Ph316,052.21$16,052.21
Titan, Ph316,052.21$16,052.21
Titan, Ph318,652.38$18,652.38
Titan, Ph317,433.25$17,433.25
$0.00
$0.00
Titan, Ph3196.43$196.43
$0.00
Titan, Ph418,652.38$18,652.38
Titan, Ph416,052.21$16,052.21
Titan, Ph416,052.21$16,052.21
Titan, Ph418,652.38$18,652.38
Titan, Ph417,433.25$17,433.25
Titan, Ph422,641.75$22,641.75
Titan, Ph418,652.38$18,652.38
Titan, Ph416,052.21$16,052.21
$0.00
$0.00
Peacekeeper$0.00
Peacekeeper$0.00
Peacekeeper$0.00
Peacekeeper$0.00
Peacekeeper$0.00
Peacekeeper$0.00
Peacekeeper$0.00
Peacekeeper$0.00
Peacekeeper$0.00
Peacekeeper$0.00
Peacekeeper$0.00
Peacekeeper$0.00
Peacekeeper$0.00
Peacekeeper$0.00
Peacekeeper$0.00
Peacekeeper$0.00
Peacekeeper$0.00
$0.00
95-9031E6105MFH200,000.00-62.69$199,937.31
Sequence30,322.55$30,322.55
Model 12,611.040.00$2,611.04
Model 2805.29$805.29
$0.00
Negotiated26,906.220.00$26,906.22
Actual19,302.360.00$19,302.36
MMV 1 - 01584.92$584.92
MMV 1 - 02584.92$584.92
MMV 1 - 03584.92$584.92
MMV 1 - 04584.92$584.92
MMV 1 - 05584.92$584.92
MMV 1 - 06584.92$584.92
MMV 1 - 07584.92$584.92
MMV 1 - 08584.92$584.92
MMV 1 - 09584.92$584.92
MMV 1 - 10584.92$584.92
MMV 1 - 11584.92$584.92
MMV 1 - 12584.92$584.92
MMV 1 - 13584.92$584.92
MMV 1 - 14584.92$584.92
MMV 1 - 15584.92$584.92
MMV 1 - 16584.92$584.92
MMV 1 - 17584.92$584.92
MMV 1 - 18584.92$584.92
MMV 1 - 19584.92$584.92
MMV 1 - 20584.92$584.92
MMV 1 - 21584.92$584.92
MMV 1 - 22584.92$584.92
MMV 1 - 23584.92$584.92
MMV 1 - 24584.92$584.92
MMV 1 - 25584.92$584.92
MMV 1 - 26584.92$584.92
MMV 1 - 27584.92$584.92
MMV 1 - 28584.92$584.92
MMV 1 - 29584.92$584.92
MMV 1 - 30584.92$584.92
MMV 1 - 31584.92$584.92
MMV 1 - 32584.92$584.92
MMV 1 - 33584.92$584.92
MMV 1 - 34$0.00
MMV 1 - 35$0.00
MMV 1 - 36$0.00
MMV 1 - 37$0.00
MMV 1 - 38$0.00
MMV 1 - 39$0.00
MMV 1 - 40$0.00
MMV 1 - 41$0.00
MMV 1 - 42$0.00
MMV 1 - 43$0.00
MMV 1 - 44$0.00
MMV 1 - 45$0.00
MMV 1 - 46$0.00
$0.00
Capehart 1$0.00
Capehart 2$0.00
$0.00
02-1034A6106Bldg 165103,565.943,699.81$107,265.75
03-10116107Bldg 500460,000.0042,764.47$502,764.47
00-1019B6108Bldg 119938,300.820.00$38,300.82
03-10136109Bldg 45056,871.900.00$56,871.90
02-1037A6110Rpr HTHW System Phase 1240,236.683,886.61$244,123.29
98-30026111Bldg 144126,485.981,666.14$28,152.12
03-10526112Bldg 1010122,380.414,275.67$126,656.08
02-1037B6113Rpr HTHW System Phase 2583,699.0810,854.32$594,553.40
02-10196114Bldg 170534,067.770.00$34,067.77
02-1014A6115Bldg 124026,014.031,969.56$27,983.59
03-10116116Bldg 500276,707.5665,713.22$342,420.78
87-6089A6117Missile Field200,000.000.00$200,000.00
00-10026118Construct FD Storage Bldg 347244,919.810.00$244,919.81
$2,413,834.90$134,829.80$2,548,664.70
FY 2004
03-10436201Install Fire Door, Youth Center$9,071.17$1,420.11$10,491.28
95-9031-E6202IDIQ Wet Basements$114,000.00$114,000.00
04-10156203Resurface Running Track$143,193.63$1,983.37$145,177.00
7688976204Demolish 804/806 Gumwood Drive$41,950.58$0.00$41,950.58
03-10116205Construct Offices, 341 MXG$160,518.86$2,478.11$162,996.97
04-10196206New Entrance/ Window Latch 1152$29,570.26$6,870.48$36,440.74
02-0005-D6207Renovate Central Destruct Facility$31,798.00$2,627.10$34,425.10
99-4006N6208Cap Gas Lines Dogwood$6,540.82$0.00$6,540.82
03-10156209Bldg 165 parking$200,000.00$24,226.30$224,226.30
64-00006210Diverter Valve at Fuel Tanks$44,910.53$2,172.43$47,082.96
30-0036C6211secondary leak protection at MAFs$85,700.00($47,756.84)$37,943.16
01-4001-B6212A/C for Capehart Housing$192,000.00($2,328.46)$189,671.54
03-1011-B6213741 command sec bldg 500$110,000.00$4,303.98$114,303.98
01-10226214VOQ parking log$126,800.00$18,286.36$145,086.36
02-1501A6215Building 1439 siding$471,869.19$14,871.82$486,741.01
02-20146216MAF Carpet Headliners$80,000.00$115,592.80$195,592.80
03-10026217Bldg 500 Wing Conf Room$201,843.63$4,726.17$206,569.80
98-11386218Bldg. 500 Common Areas$528,000.00($32,023.46)$495,976.54
86-0001DQ-16219Insulation Matador Manor$25,966.44$25,966.44
02-20316220Paint Heli Pads$35,495.80$35,495.80
03-1015P6221Harden Perimeter Fence$258,295.97$258,295.97
01-10186222Library Drainage at entrance$4,214.69$4,214.69
02-1049D6223Landscape Chip$26,937.05$1,417.00$28,354.05
00-4021B6224Various Fence Hardening$100,000.00$100,000.00
04-10696225Ed Center Bathrooms$72,941.35$7,701.10$80,642.45
04-10506226CORS Station$11,631.91$11,631.91
03-10176227UBM Sprinkler System$65,500.00($63,906.43)$1,593.57
03-1015P6228Harden Perimeter Fence, Site B$50,000.00$45,931.84$95,931.84
$3,228,749.88$108,593.78$3,337,343.66
FY 2005
05-10196301Video Teleconference Room Renovation$43,535.51$1,621.95$45,157.46
04-10076302Replace Lift Station Pumps, Bldg 1450$66,088.73$1,539.04$67,627.77
05-10326303Barrier Power, 5 Sites$54,806.63$54,806.63
04-4001C6304Capehart A/C Phase III$193,703.92$193,703.92
05-10606305Chapel Marquee Roof$2,105.67$2,105.67
05-10156306Ed Center Break Room$28,343.80$28,343.80
04-4001D6307Capehart A/C Phase IV$297,473.87$6,918.00$304,391.87
05-10306308Maintain Dorm 640 Bathrooms$61,218.04$277.11$61,495.15
02-10186309Install M203 Firing Platform$55,793.24$55,793.24
98-11276310Renov K-9 Training Area$145,836.00$145,836.00
02-10306311M-9 Range Ventilation$177,230.46$3,591.12$180,821.58
05-40046312CMU Screen Minuteman Village$499,856.21$499,856.21
04-10686313Maintain 500 (3rd Floor and Stairwells)$201,619.97($23,369.73)$178,250.24
03-1015Q6314Harden Perimeter Fence$241,253.00$51,967.94$293,220.94
05-08006315Supply New Liebert Unit IT Room$92,571.38$92,571.38
05-08006316Renovate Darkroom$4,722.79$127.51$4,850.30
05-08006317Command Area Renovation$57,356.52$1,497.66$58,854.18
05-08006318Group Assembly Area$50,132.65$2,370.61$52,503.26
05-8006319Physical Therapy & MCC Corridor Remodel$29,776.27$1,441.71$31,217.98
$2,303,424.66$47,982.92$2,351,407.58
FY 2006
06-10076401South Gate Repair$435,900.00$13,788.23$449,688.23
06-10066402Renovate CEC Office$19,256.00$3,619.65$22,875.65
06-40016403Repair 714 Gumwood Garage$3,184.42$3,184.42
04-10016404Water Utility System Security$300,000.00-$736.69$299,263.31
02-1049C6405Base Landscaping$205,503.43$243.31$205,746.74
06-1006A6406Renovate CS/SABER$43,873.78$1,897.87$45,771.65
06-40006407Replace Gumwood Roofing$177,024.92$177,024.92
06-10036408Maintain Bldg 500 Restrooms$0.00$0.00
05-10236409Renovate Bldg 160, Red Horse$234,594.88$52,199.13$286,794.01
06-40046410Repair Basements Locust/Briarwood$19,302.65$4,867.22$24,169.87
05-10236411Renovate Wing Commanders Suite$361,291.00$28,557.68$389,848.68
368836412Install Vauld Door, Bldg 165$2,861.45$2,042.88$4,904.33
06-1006B6413Renovate Engineering Offices$64,643.96$2,042.88$66,686.84
06-10456414Repair Culvert, Outfall #4$0.00$0.00
2000456415Install Barbed Wire at Rubble Pile$7,634.24$7,634.24
05-4004A6416Install CMU Fence South Side of 10th Ave No.$378,866.32$15,206.24$394,072.56
200045A6417Install Chain Link Fence at Wood Pile$26,498.34$26,498.34
$1,867,436.49$18,812.37$1,886,248.86
FY 2007
07-10096501Install Sidewalk at Base Pool$3,578.36$3,578.36
07-10046502Install Chainlink Fence on Coal Plant Road$178,660.89-$64.03$178,596.86
96-20026503Renovate Bldg 20, TRF Facility$121,176.28$121,176.28
96-20026504Construct Garage at I-1 Maf$189,122.29$189,122.29
05-10146505Renovate Bldg 349 Kitchen/Dinning Area$80,917.33$118.97$81,036.30
06-4004A6506Repair Roof at 908/910 Ironwood$17,280.57$17,280.57
06-40036507Repair Walking Trails$118,567.64$118,567.64
06-10356508Construct Comm Switch Facility$117,118.69$117,118.69
06-1036509Maintain Bldg 500, Restrooms$267,712.66$267,712.66
07-40006510Correct Drainage in Matador Manor$19,398.29$19,398.29
07-10196511Repair Wet Basement MFH$18,486.04$18,486.04
07-10206512Install Vinyl Fence RV Parking Lot$62,792.75$62,792.75
07-10216513Install Sump Alarms Bldg 631$4,966.35$4,966.35
06-1004A6514Repair Wet Basement Bldg 500$158,792.48$158,792.48
07-10226515Repair Sink Drain, Bldg 470$9,797.92$9,797.92
07-20016516Renovate MAF Bathrooms$402,375.33$402,375.33
98-11086517Repair TMO Parking Lot, Rear$490,566.53$490,566.53
06-40026518Construct Playground MFH$111,866.11$111,866.11
05-4004B6519CMU Screen Fence Phase IV$491,968.94$491,968.94
07-40026520Install Sidewalk on 10th Ave No.$114,056.54$114,056.54
07-10246521Install Irrigation/Sod at Bowling Alley$14,074.71$14,074.71
$2,993,276.70$54.94$2,993,331.64

&L&"Times New Roman,Regular"&12Attachment 8&C&"Times New Roman,Regular"&12Historical Data&R&"Times New Roman,Regular"&12FA4626-08-R-0001

File details come from the government source that posted it. Updated .