SABER Statement of Work Amendment 0001
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2 FA4626-08-R-0001
SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS
SABER
341 CIVIL ENGINEER SQUADRON
MALMSTROM AFB, MT
STATEMENT OF WORK
24 October 2007
1. - Summary of Expectations This is a contract for construction efforts at Malmstrom AFB, MT.
The government will define the scope of individual projects with anywhere from a 35% to a 95% design. From this design the contractor must complete the design and develop a cost estimate to meet customer requirements for each identified project. The contractors will have set delivery periods to provide completed cost estimates determined by the government. Typical timelines are as follows:
| Date RFP Received by Contractor: | |
| Proposal Due within: |
| 21-30 September |
| 1 calendar day |
| 1-21 September |
| 3 calendar days |
| 1-30 August |
| 7 calendar days |
| 1 October – 31 July |
| 10 working days |
| Projects deemed as complicated |
| 15 working days |
Initial design drawings are also required within this timeframe. These drawings do not have to be 100% design quality but they must be complete enough to be able to quantify items and negotiate the Task Order (TO).
Each construction project will be awarded by an individual TO issued against the basic contract and specifying work in support of real property maintenance, repair, alteration, and new construction. The Base Civil Engineer (BCE) will identify construction tasks required to complete each specific job and the Contracting Office (CO) will issue request for proposals (RFPs) and award individual TO’s.
There are no fiscal caps on individual task orders other than those provided within Air Force Instructions (AFIs 32-1032, 32-1022, and 32-6002). The service provider shall furnish all construction equipment, supplies and material needed to perform the work unless otherwise stipulated in the TO specific statement of work (SOW).
2. - Services To Be Provided
2.1 Technical Design Support Services
Each service provider shall provide project design services. Areas of required design competence shall include, but are not limited to: architectural, structural, mechanical, electrical, and drafting/surveying capabilities. Individual projects will vary in size and scope, with the majority expected to be of a small to medium size. Minimal design effort is defined as the capability to provide builder’s plans of the type routinely developed in commercial practice and/or as provided and supplemented by industry such as pre-engineered building manufactures, major heating ventilation and air conditioning equipment suppliers, fire suppression system suppliers and similar industry standards. The Contractor’s staff shall include at least one registered Professional Engineer (PE) who is well versed in multi-discipline design and construction.
The Contractor must demonstrate design capabilities of providing quality, cost effective small scale design efforts for multiple task orders simultaneously and within the time constraints established in the SABER specifications. Designs shall comply with current applicable building codes, and with applicable Air Force Instructions, Design Guides and Engineering Technical Letters as well as all applicable Federal and State Regulations. The contractor will be provided with the Government’s initial concept design and Statement of Work (SOW) for each TO. The Contractor shall then be responsible for further development of the government’s concept design to a point where his designs/drawings clearly indicate the proposed method of accomplishing the work, as well as the description, size, and location of all proposed elements of work. The Contractor’s design must comply with the government’s concept design requirements as well as all governing codes and SABER Technical Specifications.
Project estimates will be prepared accurately and timely using the R.S. Means Facilities Construction Cost Data Book to calculate the material and labor portion of projects. Proposals will be submitted using the WinEstimator program. Total project costs will be a combination of RS Means labor, equipment and material plus application of the Great Falls city cost index. This is then multiplied by a standard coefficient supplied by the service providers.
The offerors proposed coefficient is to cover cost elements such as overhead, profit, design costs, G&A expenses, bond premiums, gross receipts taxes and all the sections in division 1, General requirements, of RS Means as specified within section 01000 of the SABER specifications.
The Contractor shall be capable of limited surveying to layout the project work sites. Where grading or drainage is involved, drawings shall clearly indicate both existing and new spot elevations.
2.2 Construction Services
The contractor is to execute approved and funded construction projects. The contractor is to perform construction within facilities in support of Real Property Installed Equipment (RPIE) and non-RPIE equipment to meet customer needs and expectations. The service provider shall work closely with the in-house civil engineering SABER section to plan, schedule and complete all work as an integrated team. Completed work shall provide cost effective, functional, serviceable facilities that foster a safe and productive work or living environment. All work shall be in strict compliance with project and contract documents to provide quality products in compliance with plans and specifications.
2.3 Project Management
As a minimum, the Contractor(s) shall maintain the following management and technical support capabilities at Malmstrom AFB, SABER office throughout the duration of this contract:
1. Contractor’s Project Manager (CPM) – Provide overall contract management of the prime contract to include subcontract purchasing and administration, contractor review of material submittals and shop drawings, full authority to develop cost proposals, negotiated and sign delivery orders, supervise individual project superintendents, and attend all joint Government/Contractor status meetings as well as site visits, pre-performance conferences, pre-finals, and final inspections. CPM must have a minimum of 5 years of project management experience
2. Drafting – Drafting support must be capable of producing accurate and complete proposal and construction drawings for several task orders simultaneously within the time constraints specified in the SABER specifications. CADD operator(s) shall be located at the local office.
3. Cost Estimating/Negotiating – Provide estimating and negotiating support with experience in development of detailed quantity take-off and cost estimates for multi-discipline commercial construction projects.
4. Site Superintendence – Provide on-site superintendence for multiple, simultaneous delivery orders. Site supervision shall include a minimum of twice daily visits to each active project site, submission of detailed weekly progress reports for each task order, and coordination of subcontractors and material suppliers, and attendance at all site visits, pre-performance conferences, pre-final, and final inspections. Site superintendent must have at least three (3) years of experience as a superintendent for similar type work.
5. Quality Control and Safety Management: The Contractor shall provide a Quality Control Manager (QCM) to provide quality control and safety management for multiple, simultaneous delivery orders. The QCM shall perform a minimum of twice daily visits to each active project site to ensure full compliance with all safety requirements, verification that the work and materials in place and stored on site are in accordance with the approved construction drawings, shop drawings, and material submittals. The QCM shall take daily field notes recording activities at each project site, prepare and coordinate material submittal sheets and shop drawings submittals, prepare quality control reports, attend all pre-final and final inspections, and schedule and coordinate testing procedures. Quality control and safety management shall be carried out by someone other than the CPM or site superintendent and shall have a minimum of three (3) years of experience as a quality control manager..
6. Design – Design support must be capable of producing accurate and complete proposal and construction drawings for several task orders simultaneously within the time constraints specified in the SABER specifications. Design support must have previous experience in building design and basic knowledge of architectural, civil, structural, mechanical, and electrical design and cost estimating. A registered PE shall be on staff and available to support work requiring their knowledge, skills, and abilities.
7. Required experience and skill levels shall be maintained throughout the duration of the contract. When personnel changes are required, resumes and a revised organization chart shall be submitted to the CO for approval.
3. – Quality Control:
4.1. The Contractor(s) bears full responsibility for quality control, safety and environmental stewardship on all project sites.
4.2. The successful contractors will be required to institute an individual comprehensive Quality Control Program to assure himself and the Government that all materials and workmanship are in strict accordance with the provisions of the specifications and drawings and the job sites are safe and environmentally sound.
4.3. The Quality Control Program specifically and exclusively relates to the acceptable completion of work and subsequent government inspections and approvals. It is the Contractor’s responsibility to provide, inspect, and document the level of quality that has been established by the minimum standards of the SOW and the individual TOs.
4.4. The Contractor(s) shall submit a Quality Control Plan acceptable to the government prior to commencement of work. This Quality Control Plan shall address all phases of the construction process to ensure all components of construction meet industry standards.
4.5. Quality Control Manager: The Quality Control Manager shall direct the execution of the Contractor’s Quality Control Plan with responsibility for administration of the plan and inspection of work. The Quality Control Manager shall be available during normal duty hours.
4. – Local Office:
4.1. The contractor(s) shall have a local office within the City of Great Falls. Any equipment such as communications and material handling equipment, and administrative supplies necessary for contractor operation will be furnished by the Contractor(s) at their own expense.
5. – Contractor Storage Location:
5.1. The Contractors will be provided with a storage area for staging materials, storage of equipment and tools, and maintain miscellaneous items. These areas shall be secured by the Contractors, and any losses to the contained equipment/materials shall not be the fault of the government.
5.2. The areas shall be maintained in a neat and orderly appearance. The CO may instruct the Contractors to clean the storage area if it is deemed necessary. The Contractor shall respond within two (2) hours of being notified by the CO, and immediately clean the area to the government’s satisfaction. The cleanup is considered fulfillment of the basic contract and charges shall not be applied to the government.
6. – Computer Requirements:
6.1. The Contractors shall provide, install, and maintain their own computer hardware for operating the SABER TO estimating/proposal process.
6.2. The Contractor(s) are responsible for procuring and maintaining a current version of their own Winestimator software. Each contractor is to provide the government with three (3) copies of this software and updates each year of the contract along with two hard copies and three (3) licenses for the electronic databases of RSMeans Facilities Construction Cost Data.
6.3 All drawings submitted by the Contractor shall be created using CADD software. These drawing files shall be compatible with the latest version of AutoCAD, without any need for translation or modification by the government.
7. - Performance Objectives There are five primary metrics in the SABER contract. They are project quality, punch list items, project timeliness, design deficiency modifications, and proposal/design drawing timeliness. These metrics will be measured on a TO by TO specific basis using the grading criteria listed below. These scores will be used to grade the contractors on each TO within the Past Performance Information Retrieval System (PPIRS).
7.1. - Project Quality – The SABER Section will grade the construction based upon the overall craftsmanship, and number of punch list items.
| 7.1.1 | Overall craftsmanship is a subjective determination made by members of the SABER section and will be graded from 1 to 5. One (1) being average craftsmanship, three (3) being good craftsmanship, and five (5) being exceptional craftsmanship. This evaluation will be based on the quality of the work and materials used. |
| 7.1.2 | Punch list items will receive a 1 through 5 grade based upon the following breakdown. Punch list items are discrepancies recorded during a pre-final, final, or a Beneficial Occupancy Date (BOD) inspection. If more than one pre-final and/or BOD are conducted the punch list items will be added up cumulatively. |
A score of one (1) means the project received more than 10 punch list items.
A score of two (2) means the project received 7 to 10 punch list items.
A score of three (3) means the project received 4 to 6 punch list items.
A score of four (4) means the project received 1 to 3 punch list items A score of five (5) means the project received no write-ups.
If there are any carry over punch list items from a pre-final inspection on the final inspection the best the contractor can receive for this portion of the evaluation is a one (1) regardless of the number of punch list items on the pre-final.
7.3. - Project Timeliness - Project timeliness will be based upon the contractor’s ability to meet established project deadlines. This is to include any intermediate timelines established for a phased project. The government will provide the timeline with the RFP. The contractor(s) have the right to accept this timeline or counter with a different timeline as part of their individual proposal. The government reserves the right to reject the counter proposal or make a compromise prior to the award of the TO. Project timeliness will be graded from one to five.
A score of one (1) means the project deadline was missed by over 5% of the TO performance period.
A score of two (2) means the project deadline was missed by up to 5% of the TO performance period.
A score of three (3) means the project deadline was met or beat by up to 5% of the TO performance period.
A score of four (4) means the project deadline was beat by 5% to 10% of the TO performance period A score of five (5) means the project deadline was beat by more than 10% of the TO performance period.
Note – The amount of weight placed on these three criteria will be TO specific and will be specified during the project negotiations.
7.4. – Proposal/Design Drawing Timeliness - timeliness will be based upon the contractor’s ability to meet established deadlines established in the contract. This is to include the submission of completed proposals and providing approved 100% design drawings. Proposal/Design Drawing timeliness will be graded from one to five.
A score of one (1) means the timeline for the completed proposal was missed or the TO specific timeline established for 100% design drawings was missed by over 5% of the established timeline.
A score of two (2) means the TO specific timeline established for 100% design drawings was missed by up to 5% of the TO performance period.
A score of three (3) means the TO specific timeline established for 100% design drawings for the design drawings was met or beat by up to 5%.
A score of four (4) means the TO specific timeline established for 100% design drawings was beat by 5% to 10% of the TO performance period A score of five (5) means the TO specific timeline established for 100% design drawings was beat by more than 10% of the TO performance period.
Note – The standing weight placed on these criteria will be 20%.
7.5. –Design Deficiency Modifications – Design deficiency modifications are those modification made by the contractor after award of the TO that are due to oversights in the contractors design and are necessary to meet the intent and requirements of the governments TO specific SOW. Modifications due to unforeseen sight conditions and government directed changes to the SOW will not be counted against the contractor.
A score of one (1) means the total amount of modifications exceeded the original agreed upon TO price by more than 20%.
A score of two (2) means the total amount of modifications exceeded the original agreed upon TO price by 10 to 20%.
A score of three (3) means the total amount of modifications exceeded the original agreed upon TO price by 5 to 10% A score of four (4) means the total amount of modifications exceeded the original agreed upon TO price by up to 5% A score of five (5) means there are no modification(s) due to design deficiencies.