This solicitation is for a Simplified Acquisition of Base Engineering Requirements (SABER) contract to provide real property maintenance, repair, remodel, alteration and minor construction projects at Fort Riley, KS and McConnell AFB, KS. The Department of the Air Force Air Mobility Command intends to award a firm-fixed-price ID/IQ contract for a base year and four option years, not to exceed $75 million over five years. Work will consist of task orders from $2,000 to $2,000,000 for a variety of construction trades. Competition is limited to 8(a) firms in SBA Regions VI and VII with NAICS code 236220. Proposals are due by 3:00 p.m. CST on 6 February 2020. The pre-proposal conference and site visit will take place on 12-13 February 2020. Evaluation criteria include technical, past performance, and price coefficient factors. Award will be made using trade-off procedures resulting in best value. The initial task order is identified and an estimated $70 million is for work at Fort Riley and $5 million at McConnell AFB.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1861A
1881A
S
S
W
W
W
W
W
W
W
W
W
W
W
W
W
1ST ST
S
S
S
S
W
W
W
W
W
W
W
W
W
W
W
W
W
S
S
S
S
W
W
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
S
S
S
S
S
S
S
S
S
S
6" PVC W
6" PVC W
6" PVC W
EX 12" UNK SS
EX 6" PVC SS
EX 15" PVC SS
EX 18" PVC SS
EX 12" PVC SS
EX 21" PVC SS
EX 15" PVC SS
EX 8" UNK SS
EX 6" DIP W
EX 10" DIP W
H ST
2ND ST
3RD ST
4TH ST
8" PVC SS
8" PVC SS
EX UNK G
EX UNK G
EX UNK G
EX UNK G
EX UNK G
EX UNK G
EX UNK G
EX UNK G
EX UNK G
EX UNK G
EX UNK G
EX UNK G
EX UNK G
EX UNK SD
EX UNK SD
EX UNK SD
EX UNK SD
EX UNK SD
EX UNK SD
EX UNK SD
EX UNK SD
I ST
6"
56"
EX UNK SD
EX UNK SD
10" X 6" 6" 10"
S
8" PVC SS
EX MH 1559
RIM 1049.87
INV IN 1045.51 (W-8")
INV OUT 1044.88 (SE-15")
NEW INV IN 1045.00(NW-8")
1,520 LF OF 6" PVC W
64 LF OF 8" PVC S
355 LF OF 8" PVC S
350 LF OF 8" PVC S
10' MIN
RELOCATE FIRE
HYDRANT AND
CONNECT TO EXISTING
6" GATE VALE
H Y
D
RELOCATED FIRE HYDRANT
6" X 6" TEE
6" GV
56"
NEW 4' ID MANHOLE
RIM:1048.8 (MIN COVER REQUIRED)
INV IN:1045.42
INV OUT:1045.32
NEW 4' ID MANHOLE
RIM:1050.7 (MIN COVER REQUIRED)
INV IN:1047.30
INV OUT:1047.20
NEW 4' ID MANHOLE
RIM:1052.55 (MIN COVER REQUIRED)
INV OUT:1049.05
( IN FEET )
50 0 25 100 200
1 inch = 50 ft.
GRAPHIC SCALE
PL
OT
TE
D:
2/
/20
4:
:49 P
M
CALL BEFORE YOU DIG
(SEE SHT. N-01)
Scale: None Construction Key Sheet
N
WARNING:
CONTRACTOR SHALL NOTE THAT ALL OF THE EXISTING UTILITIES MIGHT NOT BE
SHOWN HEREON AND THAT ANY EXISTING UTILITIES THAT ARE SHOWN ARE IN
APPROXIMATE LOCATION HORIZONTALLY AND VERTICALLY. IT SHALL BE THE
SOLE RESPONSIBILITY OF THE CONTRACTOR TO CONDUCT ALL NECESSARY
FIELD INVESTIGATIONS PRIOR TO ANY EXCAVATION TO DETERMINE THE ACTUAL
LOCATION HORIZONTALLY AS WELL AS VERTICALLY OF ALL UTILITIES.
NOTES
KEY NOTES
N
C-01
C-01
UT
ILI
TY
P
LA
N
- B
1. ASUS MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES
SHOWN INCLUDE ALL UNDERGROUND UTILITIES IN THE AREA, EITHER
IN SERVICE OR ABANDONED. ASUS FURTHER DOES NOT WARRANT
THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT
LOCATION INDICATED. ASUS DOES CERTIFY THAT THEY ARE
LOCATED AS ACCURATELY AS POSSIBLE FROM AVAILABLE
INFORMATION. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING
DEPTH AND LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION.
2. CONTRACTOR TO SCHEDULE SHUTDOWN OF EXISTING WATER LINES
AND SEWER LINES WITH ASUS PERSONNEL PRIOR TO CONNECTION
TO ALL EXISTING WATER LINES AND SEWER LINES.
3. EXISTING UNDERGROUND WATER LINES AND FORCE MAINS ARE
ASSUMED TO BE 3-FEET BELOW GRADE TO TOP OF PIPE.
CONTRACTOR IS RESPONSIBLE FOR VERIFYING LOCATION AND
DEPTH PRIOR TO EXCAVATION OR CONNECTION.
4. EXISTING GRAVITY MAINS ARE ASSUMED TO BE AT THE DEPTHS
SHOWN ON THE PLANS. CONTRACTOR IS RESPONSIBLE FOR
VERIFYING LOCATION AND DEPTH PRIOR TO EXCAVATION OR
CONNECTION.
5. EXISTING UNDERGROUND UTILITIES BY OTHERS ARE ASSUMED TO
BE 3-FEET BELOW GRADE TO TOP OF THE UTILITY LINE. DIAMETER
OF UTILITY LINE, UNLESS NOTED, IS UNKNOWN. CONTRACTOR IS
RESPONSIBLE FOR VERIFYING LOCATION AND DEPTH OF ALL
UTILITIES PRIOR TO STARTING CONSTRUCTION.
3. CONTRACTOR SHALL PROVIDE MINIMUM DEPTH OF COVER OF FOUR
FEET FOR BURIED LINES.
PR
EL
IM
INA
RY
No
By Da te
Project No.:
Date:
Drawn:
Designed:
Reviewed:
Approved:
Scale:
GWO No.:
Sheet:
FEBRUARY 28, 2020
MAR
272000139
CA
MP
F
UN
ST
ON
S
AB
ER
C
ON
ST
RU
CT
IO
N
LO
TS
AS NOTED
N/A
Am er ica n S tat es
U tili ty Se rvi ce s, Inc
F or t R ile y
1s t D ivi sio n R oa d Fo rt Ri ley , K an sa s 6
P ho ne (7
) 7
-3
3 W eb sit e:
ww w.
as us inc
.co m
CUI//FEDCON - PROPRIETARY AND CONFIDENTIAL - DO NOT DUPLICATE OR REDISTRIBUTE WITHOUT THE EXPLICIT CONSENT OF ASUS
1. MAINTAIN CLEARANCE WHERE NEW UTILITY LINE CROSSES OR PARALLELS
AN EXISTING UTILITY. CONTRACTOR SHALL BE RESPONSIBLE FOR
INSTALLING BENDS AND DUCTILE IRON PIPE AS NECESSARY TO MAINTAIN
CLEARANCES. SEE DETAIL, SHEET DET-03.
2. INSTALL CUT-IN TEE
3. INSTALL MJ TEE
4. INSTALL GATE VALVE
5. INSTALL 45° HORIZONTAL BEND
6. INSTALL 22.5° HORIZONTAL BEND
7. CONNECT TO EXISTING WATER
8. CONNECT TO EXISTING MANHOLE
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
| Sheets and Views |
| Camp_Funston_SABER_WORKING_Exhibit B-C-01 |
File details come from the government source that posted it. Updated .