Attachment 11 - ASUS PROPOSAL.PDF
PDF 179 KB Posted
- Attached to
- Fort Riley, KS & McConnell AFB, KS Simplified Acquisition of Base Engineering Requirements (SABER) - 2020
- Solicitation number
- FA4621-20-R-0001
About this file
This solicitation is for a firm-fixed-price, indefinite-delivery/indefinite-quantity contract to provide real property maintenance, repair, remodel, alteration and minor construction projects at Fort Riley, KS and McConnell Air Force Base, KS. The contract will have a one year base period and four one-year option periods, with a minimum value of $250,000 and maximum value of $75 million over five years. Task orders issued under this contract will range from $2,000 to $2 million for a variety of construction trades. Competition is limited to 8(a) small businesses in SBA Regions VI and VII with a NAICS code of 236220 and size standard of $39.5 million. Questions are due by February 6, 2020 and proposals by a date not specified in the document. The pre-proposal conference and site visit will take place on February 12-13, 2020. The successful offeror will be selected using a subjective tradeoff process evaluating technical, past performance, and price/coefficient factors.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This quote/design and any attachments contain informaitno from American States Utility Services. This submittal contains proprietary information considered the intellectual property of American States Utility Services, Inc.
2/24/2020
Ft. Riley, FRUS
Project Line No Project Description Project Cost
(a) (b) (c) (d) 1 Construction Cost 161,359.17$ 3 Sub-total, Adjusted 161,359.17$
4 Engineering Design Center Cost 4,590.00$ 5 Outside Engineering Costs 3,000.00$ 6 Sub-total 168,949.17$
7 Project Management & Inspections 6,055.00$ 8 Other Internal ASUS Costs 0% -$ 9 Sub-total 175,004.17$
10 Field Office Overhead 5.30% 9,275.22$ 11 Sub-total 184,279.39$
12 G&A Adder 13.10% 24,140.60$ 13 Cost Plus G&A Adder 208,420.00$
14 Revenue Adder 12.22% 25,468.92$
15 ESTIMATED TOTAL PROJECT COST 233,889.00$
American States Utility Services, Inc.
American States Utility Services, Inc. Proprietary and Confidential – Subject to the Restrictions Set Forth on the Title Page of this Document
Utilities Privatization Contract - SP0600-17-C-8328 Government Project - Cost Proposal
ASUS Example Project
This quote/design and any attachments contain information from American States Utility Services. This submittal contains proprietary information considered the intellectual property of American States Utility Services, Inc.
GWO: 272000139
RFP: N/A
Proj: N/A
Line Item # Description Unit Notes 1 Survey 0 Direct quote - Site topo and utility survey 2 Engineering Design and Permitting 0 Direct quote - Outside engineering services 3 Geotech 0 Direct quote - Soil samples and compaction tests 4 Total Third Party Design Costs $3,000.00
EDC Labor Subsidiary Direct Labor
Line Item # Description Unit Capital
Construction Manager
Senior Engineering
Project Engineer
Project Engineering
Tech CAD Tech Senior
CPS CPS Project Coordinator
Inspector/ Safety GIS
Subsidiary Support Admin
Notes
1 Project Management and Coordination
Design Coordination with Customer HRS 2.0 Includes coordination of all design elements with USACE, and DPW.
Project management HRS 2.0 2.0 Pay Applications for engineering and construction.
2 Design Review
Site Visit HRS 2.0 2.0 Site visits to determine conditions and take field measurements
Preliminary Design HRS 4.0 16.0 16.0 2.0 Includes preliminary review of utility design Final Design Review HRS 2.0 8.0 8.0 1.0 Includes final review of utility design
3 Proposals and Bidding Construction Request for Proposals and Bidding HRS 4.0 2.0 Construction RFP preparation, including bid tab, scope, schedule, and review bids.
4 Construction Phase Services
Field Inspection & Coordination HRS 24.0 Construction inspection and observation Safety Inspections, Reporting HRS 16.0 Conduct safety inspections, report, etc
Project Meetings HRS 2.0 1.0 Internal and external design and construction progress meetings
Project Closeout HRS 2.0 Project Close-out
5 TOTAL ENGINEERING SERVICES HRS 0.0 6.0 0.0 24.0 24.0 15.0 7.0 2.0 40.0 0.0 0.0
Total
Estimate Status: PRELIMINARY Checked:
Approved:
$0.00 $1,500.00 $1,500.00
Project: ASUS Example Project Location: Ft. Riley, FRUS
Engineering, Construction Management, Inspection Cost to Prime
This quote/design and any attachments contain informaitno from American States Utility Services. This submittal contains proprietary information considered the intellectual property of American States Utility Services, Inc.
CATALOG PRICE ESTIMATE Estimate Status: PRELIMINARY GWO: 272000139 Project: ASUS Example Project Checked: RFP: N/A Location: Ft. Riley, FRUS Approved: Proj: N/A
LABOR MATERIAL EQUIPMENT DIRECT
Units UM COST COST COST Cost
29,952.86$ 18,165.57$ 29,889.03$ 5,528.41$ 83,535.87$ Handy Whitman Index 2018-2018 0.000% 29,952.86$ 18,165.57$ 29,889.03$ 5,528.41$
83,535.87$
5% 4,176.79$ Sub-Total 87,712.67$
Regional Cost Adjustment Factor 101.96% Adjusted Sub-Total 89,432.52$
7.75% 1,407.83$ 1,407.83$ 2.00% 599.06$ 599.06$
91,439.41$
11.00% 10,058.34$ 101,497.75$
0.00% -$ 101,497.75$
0.00% -$ 101,497.75$
0.00% -$ 101,497.75$
TOTAL COST TO ASUS FOR WATER SERVICE 101,497.75$
10,712.11$ 21,982.90$ 11,913.44$ 3,973.54$ 48,581.98$ Handy Whitman Index 2018-2018 0.000% 10,712.11$ 21,982.90$ 11,913.44$ 3,973.54$
48,581.98$
5% 2,429.10$ Sub-Total 51,011.08$
Regional Cost Adjustment Factor 101.96% Adjusted Sub-Total 52,011.30$
7.75% 1,703.67$ 1,703.67$ 2.00% 214.24$ 214.24$
53,929.21$
11.00% 5,932.21$ 59,861.42$
0.00% -$ 59,861.42$
0.00% -$ 59,861.42$
0.00% -$ 59,861.42$
TOTAL COST TO ASUS FOR SEWER SERVICE 59,861.42$
TOTAL COST TO ASUS FOR WATER & SEWER SERVICE 161,359.17$
Profit
SUB-TOTAL
Bond (If Required)
TOTAL COST TO ASUS FOR SEWER SERVICE
Organic Construction OH
SUB-TOTAL
Home Office Overhead (G & A)
SUB-TOTAL
INDIRECT COSTS
Sales Tax Small Tools Allowance (% of Bare Labor)
SUB-TOTAL
SEWER SUB-TOTALS (Bare Costs)
DIRECT COSTS
TASK DESCRIPTION
WATER SUB-TOTALS (Bare Costs)
DIRECT COSTS
SUB-TOTAL
TOTAL
Estimator: Brian Peterson
QUANTITY
Engineer:
Date Entered: 2/24/2020
ADDITIONAL ITEMS - Fully Loaded Costs
ADDITIONAL ITEMS - Fully Loaded Costs
Mobilization
Sales Tax Small Tools Allowance (% of Bare Labor)
Organic Construction OH
SUB-TOTAL
Home Office Overhead (G & A)
INDIRECT COSTS
SUB-TOTAL
Profit
SUB-TOTAL
Bond (If Required)
SUB-TOTAL COST
Mobilization
This quote/design and any attachments contain information from Old North Utility Services. This submittal contains proprietary information considered the intellectual property of Old North Utility Services, Inc.
CATALOG PRICE ESTIMATE Estimate Status: PRELIMINARY GWO: 272000139 Project: ASUS Example Project Checked: RFP: N/A Location: Ft. Riley, FRUS Approved: Proj: N/A
LABOR MATERIAL EQUIPMENT DIRECT
Units UM COST COST COST Cost
Water 10"x6" MJ Cut In Tee 1 EA 853.11$ 1,222.89$ 528.31$ -$ 2,604.31$ 6"x6" MJ Tee 1 EA 351.79$ 356.57$ 232.46$ -$ 940.82$ 6" MJ Sleeve 1 EA 175.88$ 181.62$ 105.66$ -$ 463.16$ 10" MJ Sleeve 1 EA 228.68$ 342.22$ 147.93$ -$ 718.82$ 6" 45° MJ Bend 4 EA 1,055.26$ 986.50$ 633.97$ -$ 2,675.74$ 6" 45° MJ Vertical Bend 4 EA 1,055.26$ 986.50$ 633.97$ -$ 2,675.74$ Fire Hydrant (NO tee or valve incl.) 1 EA 179.38$ 1,712.58$ 105.66$ -$ 1,997.62$ 6" MJ Gate Valve & Box 2 EA 666.59$ 1,365.58$ 380.38$ -$ 2,412.55$ Concrete Valve Anchor 2 EA 70.35$ 136.83$ 70.35$ -$ 277.53$ 6" C900 PVC Pipe, Standard Depth 800 LF 7,514.05$ 4,648.00$ 8,079.33$ 1,018.58$ 21,259.96$ 6" C900 PVC Pipe (8 ft deep) 730 LF 15,264.26$ 4,256.00$ 18,911.29$ 1,273.23$ 39,704.78$ Disinfection, Pressure Test and Bac-T Test 1 EA 1,608.02$ 150.00$ -$ -$ 1,758.02$ Thrust Blocking up to 8" Dia. 6 EA 120.51$ 898.50$ -$ -$ 1,019.01$ Remove and Replace Asphalt Pavement - 6" Thickness 53.33 SY -$ -$ -$ 3,236.60$ 3,236.60$ 8" Stone Base Course 53.33 SY 31.86$ 466.93$ 27.81$ -$ 526.61$ Erosion Control Measures 1 LS 32.92$ 32.00$ 31.90$ -$ 96.82$ Site Restoration 1 LS 744.94$ 422.85$ -$ -$ 1,167.79$
Water Subtotal (Bare Costs) 29,952.86$ 18,165.57$ 29,889.03$ 5,528.41$ 83,535.87$ 83,535.87$
Sewer 4' ID Manhole (0'-6') 3 EA 2,062.93$ 5,717.87$ 2,566.21$ -$ 10,347.00$ 8" SDR26 HW PVC Sewer Pipe (0'-6') 785 LF 8,649.18$ 16,265.03$ 9,347.23$ 1,527.88$ 35,789.32$ Sewer Line Low Pressure Air Testing (Subcontract) 3 EA -$ -$ -$ 977.13$ 977.13$ Sewer Manhole Vacuum Test (Subcontract) 3 EA -$ -$ -$ 977.13$ 977.13$ Core Drill and Insert Boot (no earthwork) 1 EA -$ -$ -$ 491.40$ 491.40$
Sewer Subtotal (Bare Costs) 10,712.11$ 21,982.90$ 11,913.44$ 3,973.54$ 48,581.98$ 48,581.98$
Project Bare Costs 40,664.98$ 40,148.47$ 41,802.47$ 9,501.95$ 132,117.86$
TOTALTASK DESCRIPTION
Estimator: Brian Peterson Engineer:
Date Entered: 2/24/2020
QUANTITY
| JDE Adder Sheet |
| Engineering Fee Breakdown |
| Summary |