General Decision Number: WA140042 02/21/2014 WA42
Superseded General Decision Number: WA20130042
State: Washington
Construction Type: Building
County: Spokane County in Washington.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date 0 01/03/2014 1 02/21/2014
ASBE0082-001 08/01/2012
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 32.17 16.25
BRWA0001-002 06/01/2013
Rates Fringes
BRICKLAYER.......................$ 27.83 14.55
CARP0004-011 06/01/2013
Rates Fringes
CARPENTER (Excluding Acoustical ceiling, Drywall Hanging and Form Work)...........$ 26.56 12.87
ZONE PAY:
ZONE 1 0-45 MILES FREE
ZONE 2 46-65 MILES $2.00/PER HOUR
ZONE 3 66-100 MILES $3.00/PER HOUR
ZONE 4 OVER 100 MILES $4.50/PER HOUR
DISPATCH POINTS:
CARPENTERS/MILLWRIGHTS: PASCO (515 N. Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARPENTERS: COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever
4/23/2014http://www.wdol.gov/wdol/scafiles/davisbacon/WA42.dvb?v=1
FA4620-14-R-B001
Attachment 8(a) is closest to the worksite).
CARPENTERS: MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
HAZMAT PROJECTS:
Anyone working on a HAZMAT job (task, where HAZMAT certification is required, shall be compensated at a premium, in addition to the classification working in as follows:
LEVEL D+ $.25 per hour - This is the lowest level of proection. No respirator is used and skin proection is minimal.
LEVEL C+ $.50 per hour - This level uses an air purifying respirator or additional protective clothing.
LEVEL B+ $.75 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit."
LEVEL A+ $1.00 per hour - This level utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line.
ELEC0073-003 07/01/2013
Rates Fringes
ELECTRICIAN......................$ 29.07 16.15
ELEC0073-010 06/01/2013
Rates Fringes
ELECTRICIAN (Sound Equipment Installation Only)...............$ 23.55 12.44
ENGI0370-017 06/01/2013
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 25.56 12.85
GROUP 2.....................$ 25.88 12.85
GROUP 3.....................$ 26.49 12.85
GROUP 4.....................$ 26.65 12.85
GROUP 5.....................$ 26.81 12.85
GROUP 6.....................$ 27.09 12.85
GROUP 7.....................$ 27.36 12.85
GROUP 8.....................$ 28.46 12.85
ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00
Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;
Lewiston, Idaho
4/23/2014http://www.wdol.gov/wdol/scafiles/davisbacon/WA42.dvb?v=1
Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Compactor; Drill Oiler; Rollers, all types on subgrade, including seal and chip coatings
GROUP 2: Fork Lift
GROUP 3: Bulldozer (up to D-6 or equivalent)
GROUP 4: Drills (churn, core, calyx or diamond); Oiler;
Loaders (overhead & front-end, under 4 yds. R/T); Vacuum Drill (reverse circulation drill under 8 inch bit)
GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (hoe Ram) (under 3/4 yd.); Cranes (25 tons & under), Drilling Equipment(8 inch bit & over) (Robbins, reverse circulation & similar)
GROUP 6: Asphalt Roller; Backhoe (45,000 gw and over to 110,000 gw); Trackhoe/Excavator (Hoe Ram) (3/4 yd. to 3 yd.); Compactor (self-propelled with blade); Cranes (over 25 tons, to and including 45 tons), Bulldozer, 834 R/T & similar; Loader Operator (front-end & overhead, 4 yds.
incl. 8 yds.); Scrapers, all, rubber-tired; Screed Operator
GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (Hoe Ram) (3 yds & over); Cranes (over 45 tons to but not including 85 tons); Loaders (overhead & front-end, over 8 yds. to 10 yds.); Rubber-tired Scrapers (multiple engine with three or more scrapers); Blade
GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower); Loaders (overhead and front-end, 10 yards and over)
BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale
NOTE:
In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.
HAZMAT:
Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.
IRON0014-012 07/01/2013
Rates Fringes
IRONWORKER (Ornamental, Reinforcing and Structural)......$ 31.60 21.35
LABO0238-014 06/01/2013
4/23/2014http://www.wdol.gov/wdol/scafiles/davisbacon/WA42.dvb?v=1
Rates Fringes
LABORER: Mason Tender - Brick...$ 24.10 10.65
LABO0238-024 06/01/2013
Rates Fringes
LABORER
GROUP 1.....................$ 22.00 10.65
GROUP 2.....................$ 24.10 10.65
GROUP 3.....................$ 24.37 10.65
GROUP 4.....................$ 24.64 10.65
Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00
BASE POINTS: Spokane, Pasco, Lewiston
Zone 1: 0-45 radius miles from the main post office.
Zone 2: 45 radius miles and over from the main post office
LABORERS CLASSIFICATIONS
GROUP 1: Flagman
GROUP 2: Common or General Laborer; Form-Stripping
GROUP 3: Chipping Guns; Concrete Saw; Pipelayer
GROUP 4: Asphalt Raker; Grade Checker; Gunite; Vibrating Plate
PAIN0054-004 06/01/2008
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 22.78 8.88
PAIN0054-006 07/01/2012
Rates Fringes
GLAZIER..........................$ 17.46 7.12
PAIN0054-012 10/01/2005
Rates Fringes
FLOOR LAYER: Carpet and Vinyl....$ 15.50 4.22
PLAS0072-006 06/01/2012
Rates Fringes
PLASTERER........................$ 25.44 11.64
Zone Differential (Add to Zone 1 rate): Zone 2 - $2.00
BASE POINTS: Spokane, Pasco, Lewiston, Wenatchee
Zone 1: 0-45 radius miles from the main post office
Zone 2: Over 45 radius miles from the main post office
PLUM0044-001 06/01/2013
Rates Fringes
Plumbers and Pipefitters.........$ 35.81 17.34
ROOF0189-013 07/01/2011
Rates Fringes
ROOFER (Including Tearoff).......$ 23.10 9.95
SHEE0066-007 06/01/2013
Rates Fringes
Sheet metal worker (Includes HVAC DUCT and Metal Roof Installation)....................$ 28.25 17.22
* TEAM0690-008 01/01/2014
Rates Fringes
Truck drivers: (ANYONE
WORKING ON HAZMAT JOBS SEE
FOOTNOTE A BELOW)
ZONE 1: LEWISTON ZONE
CENTER
GROUP 3....................$ 22.94 15.19
GROUP 4....................$ 23.27 15.19
GROUP 5....................$ 23.38 15.19
GROUP 6....................$ 23.55 15.19
GROUP 7....................$ 24.08 15.19
GROUP 8....................$ 24.44 15.19
ZONE 1: PASCO ZONE CENTER
GROUP 3....................$ 24.42 15.19
GROUP 4....................$ 24.75 15.19
GROUP 5....................$ 24.86 15.19
GROUP 6....................$ 25.02 15.19
GROUP 7....................$ 25.56 15.19
GROUP 8....................$ 25.88 15.19
ZONE 1: SPOKANE ZONE CENTER
GROUP 3....................$ 22.94 15.19
GROUP 4....................$ 23.27 15.19
GROUP 5....................$ 23.38 15.19
GROUP 6....................$ 23.55 15.19
GROUP 7....................$ 24.08 15.19
GROUP 8....................$ 24.44 15.19
Zone Differential (Add to Zone 1 rate: Zone 1 +$2.00)
BASE POINTS: Spokane, Moses Lake, Pasco, Lewiston
4/23/2014http://www.wdol.gov/wdol/scafiles/davisbacon/WA42.dvb?v=1
Zone 1: 0-45 radius miles from the main post office Zone 2: Outside a 45 mile radius from the main post office
TRUCK DRIVERS CLASSIFICATIONS
GROUP 3: Trucks, side, end, bottom and articulated end dump (3 yards to and including 6 yds.)
GROUP 4: Trucks, side, end, bottom and articulated end dump (over 6 yds. to & including 12 yds.)
GROUP 5: Trucks, side, end, bottom and articulated end dump (over 12 yds. to & including 20 yds.)
GROUP 6: Trucks, side, end, bottom and articulated end dump (over 20 yds. to & including 40 yds.)
GROUP 7: Truck, side, end, bottom and articulated end dump (over 40 yds. to & including 100 yds.)
GROUP 8: Trucks, side, end, bottom and articulated end dump (over 100 yds.)
FOOTNOTE A - Anyone working on a HAZMAT job, where HAZMAT cerfification is required, shall be compensated as a premium, in addition to the classification working in as follows:
LEVEL C-D: - $.50 PER HOUR - This level may use an air purifying respirator or additional protective clothing.
LEVEL A-B: - $1.00 PER HOUR - Uses supplied air in conjunction with a chemical splash suit or fully encapsulated suit with a self-contained breathing apparatus.
Employees shall be paid Hazmat pay in increments of four(4) and eight(8) hours.
SUWA2009-030 05/22/2009
Rates Fringes
CARPENTER (Acoustical Ceiling Installation Only)...............$ 18.00 1.43
CARPENTER (Drywall Hanging Only)............................$ 20.62 0.00
CARPENTER (Form Work Only).......$ 18.63 2.65
LABORER: Handheld Drill.........$ 17.17 5.36
LABORER: Irrigation.............$ 11.58 0.00
LABORER: Landscape..............$ 11.48 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 9.00 0.00
4/23/2014http://www.wdol.gov/wdol/scafiles/davisbacon/WA42.dvb?v=1
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 15.31 0.00
OPERATOR: Concrete Pumper.......$ 22.30 5.27
OPERATOR: Mechanic..............$ 24.33 4.33
PAINTER: Brush Only.............$ 13.00 0.50
PAINTER: Roller.................$ 22.62 0.25
PAINTER: Spray..................$ 22.47 0.00
TILE SETTER......................$ 14.83 0.00
TRUCK DRIVER: Semi-Trailer Truck............................$ 20.59 5.56
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any
4/23/2014http://www.wdol.gov/wdol/scafiles/davisbacon/WA42.dvb?v=1 changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
4/23/2014http://www.wdol.gov/wdol/scafiles/davisbacon/WA42.dvb?v=1
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION