Attachment_3_-_Seed_Project_Price_Schedule.pdf

PDF 81 KB Posted

Attached to
Fairchild AFB MATOC 2014 Federal contract opportunity
Solicitation number
FA4620-14-R-B001
Issued by
Department of the Air Force Air Mobility Command

About this file

Attachment 3 - Seed Project Price Schedule

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4620-14-R-B001

Attachment 3

FOR OFFICIAL USE ONLY Page 1 of 1

PRICE SCHEDULE

GJKZ 10-0210 CONST, Irrigation System, FamCamp East Side

Fairchild Air Force Base, Washington

CLIN DESCRIPTION QTY UNIT PRICE

0001 BASIC REQUIREMENT:

All labor, materials and equipment necessary to perform GJKZ 10-0210 CONST, Irrigation System, FamCamp East Side, complete, including but not limited to design, material submittal process, and construction associated with the project. Includes all General Requirements associated with project.

0001AA PROJECT GJKZ 12-0042

All labor, materials and equipment necessary to accomplish the design, material submittal process, construction and closeout associated with the project, complete, including all General Requirements associated with project.

1 JOB $

TOTAL PRICE - CLIN 0001AA TOTAL $

• NOTE: CLIN 0001AA is subject to a statutory cost limitation of $750,000.00 as specified at

DFAR 252.236-7006.

252.236-7006 Cost Limitation.

COST LIMITATION (JAN 1997)

(a) Certain items in this solicitation are subject to statutory cost limitations. The limitations are stated in the Schedule.

(b) An offer which does not state separate prices for the items identified in the Schedule as subject to a cost limitation may be considered nonresponsive.

(c) Prices stated in offers for items subject to cost limitations shall include an appropriate apportionment of all costs, direct and indirect, overhead, and profit.

(d) Offers may be rejected which—

(1) Are materially unbalanced for the purpose of bringing items within cost limitations; or

(2) Exceed the cost limitations, unless the limitations have been waived by the Government prior to award.

(End of provision)

FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .