FA4620-12-R-B001 Atch 4 Past Performance Information.pdf

PDF 14 KB Posted

Attached to
Fairchild MACC Federal contract opportunity
Solicitation number
FA4620-12-R-B001
Issued by
Department of the Air Force Air Mobility Command

About this file

FA4620-12-R-B001 Atch 4 Past Performance Information

View the file

Other files for this federal contract opportunity

Other files attached to Fairchild MACC, newest first.
File Type Posted
FA4620-12-R-B001 Amd 2 Rev Atch 2 MACC SOW Seed Project 12-0023 Repair SA Range 2 May 12.pdf PDF
FA4620-12-R-B001 Amendment 2 Revised Section L Page 58 of 65.pdf PDF
FA4620-12-R-B001 Amendment 2 Fairchild MACC.pdf PDF
FA4620-12-R-B001 Atch 12 2012 Fairchild AFB Base Design Standards.pdf PDF
FA4620-12-R-B001 Amendment 2 Revised Section L Page 61 of 65.pdf PDF
FA4620-12-R-B001 Amendment 2 Revised Section L Page 60 of 65.pdf PDF
FA4620-12-R-B001 Amendment 2 Revised Section M Page 63 of 65.pdf PDF
FA4620-12-R-B001 Amendment 1 Revised Section L Page 59 of 65.pdf PDF
FA4620-12-R-B001 Amendment 1 Revised Section M Page 64 of 65.pdf PDF
FA4620-12-R-B001 Amendment 1 Revised Section L Page 61 of 65.pdf PDF
FA4620-12-R-B001 Amendment 1 Revised Section L Page 60 of 65.pdf PDF
MACC Pre-Proposal Conference Sign-in Sheets.pdf PDF
FA4620-12-R-B001 Amd 1 Revised Atch 2 MACC Seed Project SOW 26 Apr 12.pdf PDF
FA4620-12-R-B001 Amendment 1 Fairchild MACC.pdf PDF
FA4620-12-R-B001 Atch 9 Fairchild AFB Base Design Standards.pdf PDF
FA4620-12-R-B001 Atch 7 Subcontractor-Teaming Arrangement Release.pdf PDF
Fairchild MACC FA4620-12-R-B001 MACC Seed Project SOW Atch C- Bullet Trap Repair Details.pdf PDF
Fairchild MACC FA4620-12-R-B001 MACC Seed Project SOW Atch F - Limited LBP Survey.pdf PDF
FA4620-12-R-B001 Atch 8a WD WA120042 Building - Spokane County.pdf PDF
Fairchild MACC FA4620-12-R-B001 MACC Seed Project SOW Atch A - Bldg 2076 As-Builts.pdf PDF
Fairchild MACC FA4620-12-R-B001 MACC Seed Project SOW Atch E - Limited Asbestos Survey.pdf PDF
FA4620-12-R-B001 Atch 11 Fairchild AFB Operational Climate Weather Data.pdf PDF
FA4620-12-R-B001 Atch 2 MACC Seed Project TORFP cover letter with SOW dated 22 Mar 12.pdf PDF
FA4620-12-R-B001 Atch 8c WD WA120001 Highway - Statewide.pdf PDF
FA4620-12-R-B001 Atch 3 MACC Seed Project Price Schedule.pdf PDF
Fairchild MACC FA4620-12-R-B001 MACC Seed Project SOW Atch D - Bullet Deflector Photos —
FA4620-12-R-B001 Atch 5 Past Perf Cover Letter and Questionnaire.pdf PDF
Fairchild MACC FA4620-12-R-B001 MACC Seed Project SOW Atch B - Proposed Ventilation Openings.pdf PDF
FA4620-12-R-B001 Atch 1 MACC Specifications dated 5 Apr 12.pdf PDF
FA4620-12-R-B001 Atch 8d WD WA120024 Residential - Spokane County.pdf PDF
FA4620-12-R-B001 Atch 8b WD WA120101 Heavy —
FA4620-12-R-B001 MACC Solicitation.pdf PDF
Fairchild MACC FA4620-12-R-B001 MACC Seed Project SOW Atch G - Lead Soil Analysis —
FA4620-12-R-B001 Atch 10 Architectural Compatibility Plan.pdf PDF
FA4620-12-R-B001 Atch 6 MACC Orientation Seminar Task Order 0001 SOW dated 9 Feb 12.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104

FA4620-12-R-B001

Attachment 4 5 April 2012

SECTION L

PAST PERFORMANCE INFORMATION

Limitations: 5 Contracts

Provide the information requested in this form for each contract/program being described.

Provide frank, concise comments regarding your performance on the contracts you identify.

Limit the number of past efforts submitted and the length of each submission to the limitations set forth at Section L, Paragraph 2.2.2 of this solicitation.

A. Offeror Name (Company/Division): ____________________ CAGE Code: ____________________ DUNS Number: ____________________ (NOTE: If the company or division performing this effort is different than the offeror or the relevance of this effort to the instant acquisition is impacted by any company/corporate organizational change, note those changes. Refer to the "Organizational Structure Change History" you provided as part of your Past Performance Volume).

B. Program Title:

C. Contract Specifics:

Contracting Agency or Customer:

Contract Number: Contract Type:

Contract Type: Period of Performance:

Original Contract $ Value: Current Contract $ Value:

(Do not include unexercised options) If Original $ Value and Current $ Value are different, provide a brief description of the reason.

D. Brief Description of Effort as Prime or Subcontractor (Please indicate whether it was development and/or production, or other acquisition phase and highlight portions considered most relevant to current acquisition)

E. Completion Date:

Original Date: Current Schedule:

Estimate at Completion:

How Many Times Changed:

Primary Causes of Change:

FA4620-12-R-B001

Attachment 4 5 April 2012

F. Primary Customer Points of Contact: (For Government contracts, provide current information on all three individuals. For commercial contracts, provide points of contact fulfilling these same roles).

1. Program Manager and/or Site Manager

Name:

Office/Address:

Telephone Number: Fax Number:

2. Contracting Officer

Name:

Office/Address:

Telephone Number: Fax Number:

3. Administrative/Contracting Officer

Name:

Office/Address:

Telephone Number: Fax Number:

G. Address any design efforts associated with this contract/program. Indicate design contractor’s cost, scope, and any challenges on schedule concerns regarding the design.

H. Specify, by name, any key individual(s) who participated in this program and are proposed to support the instant acquisition. Also, indicate their contractual roles for both acquisitions to include the design contractor’s contact information (address and phone number).

I. Describe the nature or portion of the work on the effort performed by the business entity being reported here. Also, estimate the percentage of the total proposed effort performed by this entity and whether this entity will be performing as the prime, subcontractor, or a corporate division related to the prime (define relationship).

File details come from the government source that posted it. Updated .