FA4620-12-R-B001 Atch 2 MACC Seed Project TORFP cover letter with SOW dated 22 Mar 12.pdf
PDF 77 KB Posted
- Attached to
- Fairchild MACC
- Solicitation number
- FA4620-12-R-B001
About this file
FA4620-12-R-B001 Atch 2 MACC Seed Project TORFP cover letter with SOW dated 22 Mar 12
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEMORA
FROM:
SUBJECT
1. Fairch and C
2. The p specif
3. Requi
Venti 13 Fe
• A im as
4. The p
5. The to phase
• Ph pr
• Ph th
• Ph of
6. Notic order the pr
7. Liqui follow
• L
• L
• L
ANDUM FO
92 CONS/LG
110 W. Ent S Fairchild AF
T: Task Order Project G Fairchild hild AFB invi Containment, project is a W fied in Section irements for s lation and Co ebruary 2012.
All labor, mate mprove ventil s described in project magnit otal Performa es:
hase I is iden repare, submi hase II is iden he work site a hase III is ide f all required e to Proceed and receipt o receding phas dated damage ws.
LDs for Phase LDs for Phase LDs for Phase
DEPA
HEADQUA
FAIRCH
R MACC CO
GCB
Street
FB, WA 9901
r Request For
GJKZ 12-0023
AFB WA
ites you to su SA Range, B ork Element # n 01000, Para subject projec ontainment, S
The project i erials and equ lation of the b n the SOW.
tude is betwe ance Period fo ntified as the m it and receive ntified as the and physically entified as the closeout requ
(NTP) for Ph of bonds. NTP se.
es (LDs) shall
I will be asse II will be ass III will be as
ARTMENT
ARTERS 92D
HILD AIR FO
AMC – Glo
ONTRACTOR
1-8568 r Proposal (TO 3, Repair (R& ubmit a propos ldg 2076, Fai
#2, “Design B agraph 1.2, of ct are describe A Range, Bld includes, but uipment neces building, exten en $100,000.
or this task or material subm e approval on physical wor y accomplish e closeout pha uirements.
hase I will be P for Phases I l apply for Ph essed in the am sessed in the a ssessed in the
T OF THE A
AIR REFUEL
ORCE BASE W
obal Reach for Am
RS
ORFP) under &M) Ventilatio sal for Projec irchild AFB W
Build Effort R f the basic MA ed in the attac dg 2076, State is not limited ssary to modi nd the baffle
00 and $250, rder is 180 cal mittals phase.
all submittals k phase. It ha the work.
ase. It has a du issued within II and III will hase I through mount of $19 amount of $50 amount of $1
AIR FORCE
LING WING
WASHINGTO
merica r the MACC:
on and Conta ct GJKZ 12-00
WA
Required with ACC Specific ched GJKZ 12 ement of Wor d to the follow fy the existin to the bullet t
000.00.
lendar days, b
It has a durat s other than th as a duration o duration of 30 n 15 calendar l be issued up h III. Breakdo
90.00 per cale
06.00 per cal
172.00 per ca
E
(AMC)
ON
ainment, SA R
023, Repair ( h Provided Pa cations.
2-0023, Repa rk (SOW) dat wing:
ng Small Arm trap and other broken into th ation of 90 cal hose for close of 60 calenda calendar day days after aw pon substantia owns for each endar day.
endar day.
alendar day.
6 April
Range, Bldg 2
R&M) Ventil artial Design” air (R&M) ted ms Range to r associated w hree distinct lendar days to eout.
ar days to occu ys for complet ward of the tas al completion h phase are as l 2012
2076, lation
” as work o upy tion sk n of s
8. Antic groun http://
9. The su 100% requi
10. The “ solicit
11. The S solicit
12. A pre
13. Propo evalua
14. Price Attach
15. If you
Richa ipated recove nd granulated /www.epa.go uccessful offe % of the task o ired per solic
“Building” W tation is appli
Superintenden tation Attachm e-proposal site osals shall be ated for awar proposal shal hment 3).
u have any qu ard Hedrick at ered materials blast furnace v/cpg/factsht feror will be re order price wit citation Secti age Determin icable to this nt/QC respons ment 9, Fairc e visit will be submitted to rd in accordan ll consist of c uestions, pleas t (509) 247-4 s for project u e slag. Recove s.htm and http equired to sub thin ten (10) on I, FAR 52 nation for Spo project.
sibilities may child AFB Bas held as speci this office in nce with Secti completing the se contact Do 867, richard.h
TOR
use include: ce ered material p://www.ener bmit a perform calendar days 2.228-1, Secti okane County be combined se Design Sta ified in the so accordance w ion M of the s e Governmen onna Early at ( hedrick.2@us
RICH
Cont
F
RFP GJKZ 12-0
ement and co product infor rgystar.gov/p mance and pa s after task or ion H.1.19, a y (Attachment
d. QC requirem andards, Divi olicitation. Se with the Secti solicitation.
nt provided pr
(509) 247-48 s.af.mil.
HARD A. HE
tracting Offic
FA4620-12-R-
0023, Repair S oncrete contai rmation is pub products/produ ayment bond rder award. A and Section L t 8a) as refere ments must b sion 01, Secti ee Section L, ion L of the so rice schedule
68, donna.ear
EDRICK
cer
-B001, Attachm A Range Vent
Page ining fly ash o blished at ucts.
in the amoun A bid bond is L 2.3.2.
enced in the b be met per ion 014000.
FAR 52.236-
olicitation an
(MACC
rly@us.af.mi ment 2 tilation or nt of basic
-27.
d l or
FA4620-12-R-B001
Attachment 2
13 Feb 12
STATEMENT OF WORK
FOR
MACC SEED PROJECT
REPAIR (R&M), VENTILATION AND CONTAINMENT,
SA RANGE, B2076
AT
FAIRCHILD AIR FORCE BASE, WASHINGTON
Project No.: GJKZ 12-0023
13 FEBRUARY 2012
1. PRE-PROPOSAL REQUIREMENTS
During the pre-proposal site visit, contractors shall visit the site and become familiar with the project requirements. Plans are attached to show the location and general scope of work.
Government furnished information/materials are not guaranteed to represent actual conditions and shall therefore be field verified prior to incorporation into the design.
Questions arising at the site visit shall be submitted to the Contracting Officer in writing.
2. SCOPE
This Statement of Work (SOW) defines the scope for this task order to include proposal, design, and construction actions at the Small Arms Range at Building 2076 on Fairchild Air Force Base (FAFB), Washington (WA), in accordance with the MACC Specifications Section 01000, paragraph 1.2 Work Element No. 2 (Design Build Effort Required with Provided Partial Design) as well as technical and regulatory requirements. The intent of this project is to modify the existing Small Arms Range to improve ventilation of the building, enlarge a portion of the bullet trap, and making other modifications as needed. Following is a brief summary of the project and is provided solely for the purpose of revealing the general nature of the work involved. The place of performance shall be at Fairchild AFB, WA. The total performance period for this project is 180 calendar days. NOTE: The seed project task order NTP shall be issued after successful completion of the orientation seminar task order requirements.
2.1 Project Management Plan: The Government will reference the basic MACC Specifications, Base Design Standards (BDS), and Architectural Compatibility Plan (ACP) for information relating to quality control, teaming, personnel qualifications, etc…
13 Feb 12
2.2 Phase I, Design and Material Submittal, has a duration of 90 calendar days to prepare, submit and receive approval on all submittals other than those required for closeout.
Schedule the Phase I design work with the following considerations:
2.2.1 Contractor shall furnish a 35% Design submittal for Government review 60 calendar days after receipt of Notice to Proceed (NTP) for the design/material submittal phase. The design shall be based on the Government’s conceptual designs provided herein, to include attachments. Refer to MACC Specifications Section 01400, paragraph 13, Preliminary (35%) Design for requirements as applicable to the scope of this task order. The design is to provide the maximum open area on the back (interior) wall of building 2076 to improve ventilation of the bullet firing area in Building 2076 while maintaining the structural integrity of the building. As-built drawings of Building 2076 are provided in Attachment A and the proposed opening locations are shown in Attachment B. The design submittal shall include structural analysis of the proposed building modifications. Design shall also include modifications to the bullet trap as shown on Attachment C. The contractor shall comply with Fairchild Base Design Standards and all current and applicable codes. Allow 7 calendar days for Government review of the 35% Design submittal.
2.2.2 Contractor shall schedule a 35% Design review conference at Fairchild AFB after Government comments have been furnished to the contractor. Allow 10 calendar days to complete 35% design updates, resubmit and obtain Government approval.
2.2.3 The 35% Design, all material submittals, and approval of submittals, shall be accomplished during the Phase I performance period.
2.3 NTP for Phase II, Physical Work, will be issued after successful completion of Phase I. Phase II has a duration of 60 calendar days to occupy the work site and to physically accomplish the work. Material gathering shall be accomplished after the submittals have been reviewed and approved by the Government Project Manager (PM) and the Contracting Officer (CO). Material gathering may be accomplished in both Phase I and Phase II of the task order. A Winter Exclusion period does not apply to this project.
2.3.1 Site Conditions/Background: An attempt was made to improve the ventilation of the enclosed firing points on the partially contained firing range by adding un-tempered fan-forced air along the rear wall, directed on the firing points.
The unpredictable nature of the airflow on an open-front enclosure made this unsuccessful. Per ETL 11-18 Small Arms Range Design and Construction, Para 7.1.1.3.2: "Existing partially contained ranges that have an enclosed firing platform with sidewalls and back wall shall remove the sidewalls and back wall to improve natural ventilation." Opening these walls will provide the best ventilation possible within the limits of feasible structural modifications of the existing firing point enclosure. Also, the current arms range does not adequately confine bullets due to a gap in the bullet trap that can allow bullets to be deflected outside of the range. This potentially unsafe condition should be alleviated with extension of the top plate of the bullet trap.
13 Feb 12
2.3.2 Physical work pertinent to the project Task Order shall include, but not be limited to, the following:
2.3.2.1 Open pre-cast concrete wall panels of enclosed firing point structure to maximum extent possible within current structural design requirements of the building. Provide headers, beams, and/or structural supports necessary to allow pre-cast panel cutting and removal. The wall opening will require removal of the existing fan system. The removed fans and fan motors shall be returned to the Government. Remove all unused electrical components to this system back to the electrical panel.
Some of these new electrical components may be reused as applicable for the roll-up doors, if suitable. Remove and repair metal fascia as needed to improve ventilation while providing aesthetic appearance and needed weather protection. Provide an electrically operated roll-up door for each new wall opening to fully close the opening. Provide a separate door operating switch for each new roll-up door. Provide appropriate finishes to all newly exposed structures. Paint as necessary per Fairchild Base Design Standards.
2.3.2.2 Extend the top plate, per Attachments C, of the bullet trap by approximately 18 inches to close a gap in the system. Photographs of the existing top plate forward edge are provided in Attachment D. The extension shall match the existing in type, thickness and material.
2.3.2.3 A limited asbestos survey was conducted on the building. No asbestos was detected in the survey. See Attachment E for details. In the event that suspected asbestos containing materials are encountered during construction, the contractor shall immediately contact the Contracting Officer.
2.3.2.4 A limited lead-based paint survey was conducted on the building. The west interior/exterior yellow wall paint coating was found to contain lead. See Attachment F for details. Follow recommendations presented in the report and applicable state and Federal regulations for disposal of this paint.
2.3.2.5 Avoid disturbing the soils within the firing range. The gravel and dirt within the firing range has lead contamination. See Attachment G for details. In the event that soil excavation is required by the contractor as part of the construction process, any required hazmat surveys and/or remediation expenses shall be treated as a differing site condition and shall be approved by the Contracting Officer prior to accomplishing any/all work. No gravel or soil shall be removed from the site without proper waste characterization prior to removal. The contractor shall develop and submit appropriate site safety and disposal plans for dealing with the disturbed soils prior to commencement of work.
2.4 Phase III is identified as the Closeout Phase and has a duration of 30 calendar days for completion of all closeout requirements specified the FAFB Base Design Standards Division 1.
13 Feb 12
3. TECHNICAL REFERENCES
The documents listed in MACC Specifications Section 01300 are incorporated here by reference. Requirements for implementing the Fairchild AFB Green Procurement Plan and use of Recovered Materials are referenced in the BDS as "92 CES, Green Procurement Program Plan, 2006". The following products have been identified as EPA-designated items of Recovered Materials required for this project: cement and concrete containing fly ash or ground granulated blast furnace slag. This list, however, may not be complete.
4. SUBMITTAL ITEMS AND QUANTITIES
Upon award provide: submittal register; submittals required per section 013300.00 and other applicable submittals per FAFB Base Design Standards Division 1 prior to physical work. Provide the following for all design work.
SUBMITTAL DESCRIPTION NUMBER OF COPIES
PHASE I - 35% PRELIMINARY DESIGN
• 35% Design Submittal Final Drawings for construction, stamped and submitted for approval
• Design Analysis and Specifications: engineered/stamped calculations, and narrative describing design and loads.
• Electronic data: All drawings, narratives and calculations in Adobe PDF format with drawings also in AutoCAD format.
Drawings: 2 half size & 1 full size Other docs: 2 hard copies Electronic Data: 2 CDs
PHASE III - AS-BUILTS
• AS-BUILTS - Red-line drawings full size (paper) and electronic (both AutoCAD and PDF) copies of Final as built drawings after completion of physical construction.
2 hard copies & 2 CDs
5. SOW ATTACHMENTS:
A. Building 2076 As-Built Plans B. Proposed Openings for Ventilation C. Bullet Trap Repair Details D. Bullet Deflector Photos (2) E. Limited Asbestos Survey F. Limited Lead-Based Paint Survey G. Lead Soil Analysis (2)
END OF STATEMENT OF WORK