Atch 4 Price Breakdown VCC SCS-AMENDED_20240919.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
VSFB Vehicle Corrosion Control Services Federal contract opportunity
Solicitation number
FA461024Q0038
Issued by
Department of the Air Force Space Command

About this file

This document is a price breakdown sheet for a federal contract opportunity related to vehicle corrosion control services at Vandenberg Space Force Base. The contract will be a firm-fixed-price contract with a five-year period of performance from December 1, 2024 to November 30, 2029. The contractor is required to provide a firm-fixed-price proposal that includes a breakdown of the labor hours for each labor category and a list of the materials/parts needed for the repairs. The government has estimated a material cost of $15,000 per year. The contract is a 100% small business set-aside under NAICS code 811121 with a size standard of $9 million. Proposals are due by October 4, 2024 at 8:00 AM PST. The contracting agency is the Department of the Air Force Space Command.

View the file

Other files for this federal contract opportunity

Other files attached to VSFB Vehicle Corrosion Control Services, newest first.
File Type Posted
Site Visit Photo Request.docx DOCX document
Vendor Q and A.docx DOCX document
Atch 1 PWS Vehicle Corrosion Control 20240926.pdf PDF
FA461024Q00380001 Corrosion Control 20241002.pdf PDF
24Q0038 Vendor QA 20241002.docx DOCX document
Vendor Q and A.docx DOCX document
Atch 1 - Performance Work Statement VCC.docx DOCX document
Vendor Q and A.docx DOCX document
Atch 4 Price Breakdown VCC 2ROPS-AMENDED_20240919.xlsx XLSX spreadsheet
Atch 2 SCA WD 2015-5647_Rev22_20240722.pdf PDF
Atch 3 Price Breakdown VCC LRS 20240903.xlsx XLSX spreadsheet
FA461024Q0038 Corrosion Control RFQ 20240903.pdf PDF
Atch 1 - Performance Work Statement VCC.docx DOCX document
Atch 4 Price Breakdown VCC SCS 20240903.xlsx XLSX spreadsheet
Atch 5 Technical Response Questionaire 20191010.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 0002- Base Year SCS Vehicle Corrosion Control

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the of the labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet.
CLIN 0001 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
0002AAutomotive Glass WorkerxLabor Hour25=$ - 0
0002BMotor Equipment Metal WorkerxLabor Hour25=$ - 0
0002CMotor Vehicle MechanicxLabor Hour25=$ - 0
0002DPainter, AutomotivexLabor Hour600=$ - 0
0002ETruck Driver, HeavyxLabor Hour25=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

0002F Government Estimated Cost for Materials $ 15,000.00 (Block E)

Total Proposed Price for CLIN 0001 (Sum of Blocks D + E = F) $15,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 0002.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with Joint Federal Travel Regulation (JFTR).

&"-,Bold"&14Price Breakdown &12 30th Space Communcations Squadron (SCS) - AKA 2nd Range Operations Squadron (2 ROPS)&14 CLIN 0002 CLIN 0002, Base Year 1 December 2024 - 30 November 2025

CLIN 2002-Year 2 SCS Vehicle Corrosion Control

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet.
Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
2002AAutomotive Glass WorkerxLabor Hour25=$ - 0
2002BMotor Equipment Metal WorkerxLabor Hour25=$ - 0
2002CMotor Vehicle MechanicxLabor Hour25=$ - 0
2002DPainter, AutomotivexLabor Hour600=$ - 0
2002ETruck Driver, HeavyxLabor Hour25=$ - 0

Total Proposed Labor Price 1 $ - 0 (Block D)

2002F Government Estimated Cost for Materials $ 15,000.00 (Block E)

Total Proposed Price for Year 2 (Sum of Blocks D + E = F) $15,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 2002.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR.

&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (30 SCS) CLIN 2002 1 December 2025 - 30 November 2026

CLIN 3002-Year 3 SCS Vehicle Corrosion Control

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet.
Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
3002AAutomotive Glass WorkerxLabor Hour25=$ - 0
3002BMotor Equipment Metal WorkerxLabor Hour25=$ - 0
3002CMotor Vehicle MechanicxLabor Hour25=$ - 0
3002DPainter, AutomotivexLabor Hour600=$ - 0
3002ETruck Driver, HeavyxLabor Hour25=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

3002F Government Estimated Cost for Materials $ 15,000.00 (Block E)

Total Proposed Price for Year 3 (Sum of Blocks D + E = F) $15,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 3002.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR.

&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (30 SCS) CLIN 3002 1 December 2026 - 30 November 2027

CLIN 4002-Year 4 SCS Vehicle Corrosion Control

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet.
Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
4002AAutomotive Glass WorkerxLabor Hour25=$ - 0
4002BMotor Equipment Metal WorkerxLabor Hour25=$ - 0
4002CMotor Vehicle MechanicxLabor Hour25=$ - 0
4002DPainter, AutomotivexLabor Hour600=$ - 0
4002ETruck Driver, HeavyxLabor Hour25=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

4002F Government Estimated Cost for Materials $ 15,000.00 (Block E)

Total Proposed Price for CLIN 3001 (Sum of Blocks D + E = F) $15,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 4002.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR.

&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (30 SCS) CLIN 4002 1 December 2027- 30 November 2028

CLIN 5002-Year 5 SCS Vehicle Corrosion Control

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet.
Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
5002AAutomotive Glass WorkerxLabor Hour25=$ - 0
5002BMotor Equipment Metal WorkerxLabor Hour25=$ - 0
5002CMotor Vehicle MechanicxLabor Hour25=$ - 0
5002DPainter, AutomotivexLabor Hour600=$ - 0
5002ETruck Driver, HeavyxLabor Hour25=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

5002F Government Estimated Cost for Materials $ 15,000.00 (Block E)

Total Proposed Price for Year 5 (Sum of Blocks D + E = F) $15,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 5002.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR.

&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (30 SCS) CLIN 5002 1 December 2028 - 30 November 2029

File details come from the government source that posted it. Updated .