Atch 4 Price Breakdown VCC SCS 20240903.xlsx
XLSX spreadsheet 34 KB Posted
- Attached to
- VSFB Vehicle Corrosion Control Services
- Solicitation number
- FA461024Q0038
About this file
This document is a price breakdown for vehicle corrosion control services required under a federal contract opportunity. The contract is for a 5-year period from December 2024 to November 2029, with each year priced separately. The contractor is required to provide a firm-fixed-price proposal that includes a breakdown of labor hours for specific labor categories and an estimated cost for materials, with a total proposed price for each year. The government has estimated the materials cost at $15,000 per year. The contract opportunity is a 100% small business set-aside under NAICS code 811121, with quotes due by October 4, 2024. The contracting agency is the Department of the Air Force Space Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Photo Request.docx | DOCX document | |
| Vendor Q and A.docx | DOCX document | |
| Atch 1 PWS Vehicle Corrosion Control 20240926.pdf | ||
| FA461024Q00380001 Corrosion Control 20241002.pdf | ||
| 24Q0038 Vendor QA 20241002.docx | DOCX document | |
| Vendor Q and A.docx | DOCX document | |
| Atch 1 - Performance Work Statement VCC.docx | DOCX document | |
| Vendor Q and A.docx | DOCX document | |
| Atch 4 Price Breakdown VCC 2ROPS-AMENDED_20240919.xlsx | XLSX spreadsheet | |
| Atch 4 Price Breakdown VCC SCS-AMENDED_20240919.xlsx | XLSX spreadsheet | |
| Atch 2 SCA WD 2015-5647_Rev22_20240722.pdf | ||
| FA461024Q0038 Corrosion Control RFQ 20240903.pdf | ||
| Atch 3 Price Breakdown VCC LRS 20240903.xlsx | XLSX spreadsheet | |
| Atch 1 - Performance Work Statement VCC.docx | DOCX document | |
| Atch 5 Technical Response Questionaire 20191010.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 0001- Base Year SCS Vehicle Corrosion Control
| A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the of the labor hours for each labor category |
| required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose |
| an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet. |
| CLIN 0001 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates | |||||||
| Labor Category Name | Hourly Rate | Unit of Issue | Estimated Hours | = | Total | ||
| 0001A | Automotive Glass Worker | x | Labor Hour | 25 | = | $ - 0 | |
| 0001B | Motor Equipment Metal Worker | x | Labor Hour | 25 | = | $ - 0 | |
| 0001C | Motor Vehicle Mechanic | x | Labor Hour | 25 | = | $ - 0 | |
| 0001D | Painter, Automotive | x | Labor Hour | 600 | = | $ - 0 | |
| 0001E | Truck Driver, Heavy | x | Labor Hour | 25 | = | $ - 0 |
Total Proposed Labor Price $ - 0 (Block D)
0001F Government Estimated Cost for Materials $ 15,000.00 (Block E)
Total Proposed Price for CLIN 0001 (Sum of Blocks D + E = F) $15,000.00 (Block F)
| Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 0001. |
| *If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose |
| travel costs (transportation, lodging and per diem) costs and shall be in accordance with Joint Federal Travel Regulation (JFTR). |
&"-,Bold"&14Price Breakdown 30 Space Communcations Squadron (SCS) CLIN 0001 CLIN 0001, Base Year 1 December 2024 - 30 November 2025
Year 2 SCS Vehicle Corrosion Control
| A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category |
| required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose |
| an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet. |
| Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates | ||||||
| Labor Category Name | Hourly Rate | Unit of Issue | Estimated Hours | = | Total | |
| Automotive Glass Worker | x | Labor Hour | 25 | = | $ - 0 | |
| Motor Equipment Metal Worker | x | Labor Hour | 25 | = | $ - 0 | |
| Motor Vehicle Mechanic | x | Labor Hour | 25 | = | $ - 0 | |
| Painter, Automotive | x | Labor Hour | 600 | = | $ - 0 | |
| Truck Driver, Heavy | x | Labor Hour | 25 | = | $ - 0 |
Total Proposed Labor Price 1 $ - 0 (Block D)
Government Estimated Cost for Materials $ 15,000.00 (Block E)
Total Proposed Price for Year 2 (Sum of Blocks D + E = F) $15,000.00 (Block F)
| Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 1001. |
| *If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose |
| travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR. |
&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (30 SCS) CLIN 1001 1 December 2025 - 30 November 2026
Year 3 SCS Vehicle Corrosion Control
| A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category |
| required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose |
| an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet. |
| Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates | ||||||
| Labor Category Name | Hourly Rate | Unit of Issue | Estimated Hours | = | Total | |
| Automotive Glass Worker | x | Labor Hour | 25 | = | $ - 0 | |
| Motor Equipment Metal Worker | x | Labor Hour | 25 | = | $ - 0 | |
| Motor Vehicle Mechanic | x | Labor Hour | 25 | = | $ - 0 | |
| Painter, Automotive | x | Labor Hour | 600 | = | $ - 0 | |
| Truck Driver, Heavy | x | Labor Hour | 25 | = | $ - 0 |
Total Proposed Labor Price $ - 0 (Block D)
Government Estimated Cost for Materials $ 15,000.00 (Block E)
Total Proposed Price for Year 3 (Sum of Blocks D + E = F) $15,000.00 (Block F)
| Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 2001. |
| *If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose |
| travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR. |
&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (30 SCS) 1 December 2026 - 30 November 2027
Year 4 SCS Vehicle Corrosion Control
| A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category |
| required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose |
| an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet. |
| Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates | ||||||
| Labor Category Name | Hourly Rate | Unit of Issue | Estimated Hours | = | Total | |
| Automotive Glass Worker | x | Labor Hour | 25 | = | $ - 0 | |
| Motor Equipment Metal Worker | x | Labor Hour | 25 | = | $ - 0 | |
| Motor Vehicle Mechanic | x | Labor Hour | 25 | = | $ - 0 | |
| Painter, Automotive | x | Labor Hour | 600 | = | $ - 0 | |
| Truck Driver, Heavy | x | Labor Hour | 25 | = | $ - 0 |
Total Proposed Labor Price $ - 0 (Block D)
Government Estimated Cost for Materials $ 15,000.00 (Block E)
Total Proposed Price for CLIN 3001 (Sum of Blocks D + E = F) $15,000.00 (Block F)
| Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 3001. |
| *If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose |
| travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR. |
&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (30 SCS) 1 December 2027- 30 November 2028
Year 5 SCS Vehicle Corrosion Control
| A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category |
| required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose |
| an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet. |
| Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates | ||||||
| Labor Category Name | Hourly Rate | Unit of Issue | Estimated Hours | = | Total | |
| Automotive Glass Worker | x | Labor Hour | 25 | = | $ - 0 | |
| Motor Equipment Metal Worker | x | Labor Hour | 25 | = | $ - 0 | |
| Motor Vehicle Mechanic | x | Labor Hour | 25 | = | $ - 0 | |
| Painter, Automotive | x | Labor Hour | 600 | = | $ - 0 | |
| Truck Driver, Heavy | x | Labor Hour | 25 | = | $ - 0 |
Total Proposed Labor Price $ - 0 (Block D)
Government Estimated Cost for Materials $ 15,000.00 (Block E)
Total Proposed Price for Year 5 (Sum of Blocks D + E = F) $15,000.00 (Block F)
| Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 4001. |
| *If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose |
| travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR. |
&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (30 SCS) 1 December 2028 - 30 November 2029
File details come from the government source that posted it. Updated .