Atch 4 Price Breakdown VCC SCS 20240903.xlsx
XLSX spreadsheet 34 KB Posted
- Attached to
- VSFB Vehicle Corrosion Control Services Federal contract opportunity
- Solicitation number
- FA461024Q0038
About this file
This document is a price breakdown for vehicle corrosion control services required under a federal contract opportunity. The contract is for a 5-year period from December 2024 to November 2029, with each year priced separately. The contractor is required to provide a firm-fixed-price proposal that includes a breakdown of labor hours for specific labor categories and an estimated cost for materials, with a total proposed price for each year. The government has estimated the materials cost at $15,000 per year. The contract opportunity is a 100% small business set-aside under NAICS code 811121, with quotes due by October 4, 2024. The contracting agency is the Department of the Air Force Space Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Photo Request.docx | DOCX document | |
| Vendor Q and A.docx | DOCX document | |
| Atch 1 PWS Vehicle Corrosion Control 20240926.pdf | ||
| FA461024Q00380001 Corrosion Control 20241002.pdf | ||
| 24Q0038 Vendor QA 20241002.docx | DOCX document | |
| Vendor Q and A.docx | DOCX document | |
| Atch 1 - Performance Work Statement VCC.docx | DOCX document | |
| Vendor Q and A.docx | DOCX document | |
| Atch 4 Price Breakdown VCC 2ROPS-AMENDED_20240919.xlsx | XLSX spreadsheet | |
| Atch 4 Price Breakdown VCC SCS-AMENDED_20240919.xlsx | XLSX spreadsheet | |
| FA461024Q0038 Corrosion Control RFQ 20240903.pdf | ||
| Atch 1 - Performance Work Statement VCC.docx | DOCX document | |
| Atch 2 SCA WD 2015-5647_Rev22_20240722.pdf | ||
| Atch 3 Price Breakdown VCC LRS 20240903.xlsx | XLSX spreadsheet | |
| Atch 5 Technical Response Questionaire 20191010.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 0001- Base Year SCS Vehicle Corrosion Control
| A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the of the labor hours for each labor category |
| required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose |
| an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet. |
| CLIN 0001 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates | |||||||
| Labor Category Name | Hourly Rate | Unit of Issue | Estimated Hours | = | Total | ||
| 0001A | Automotive Glass Worker | x | Labor Hour | 25 | = | $ - 0 | |
| 0001B | Motor Equipment Metal Worker | x | Labor Hour | 25 | = | $ - 0 | |
| 0001C | Motor Vehicle Mechanic | x | Labor Hour | 25 | = | $ - 0 | |
| 0001D | Painter, Automotive | x | Labor Hour | 600 | = | $ - 0 | |
| 0001E | Truck Driver, Heavy | x | Labor Hour | 25 | = | $ - 0 |
Total Proposed Labor Price $ - 0 (Block D)
0001F Government Estimated Cost for Materials $ 15,000.00 (Block E)
Total Proposed Price for CLIN 0001 (Sum of Blocks D + E = F) $15,000.00 (Block F)
| Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 0001. |
| *If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose |
| travel costs (transportation, lodging and per diem) costs and shall be in accordance with Joint Federal Travel Regulation (JFTR). |
&"-,Bold"&14Price Breakdown 30 Space Communcations Squadron (SCS) CLIN 0001 CLIN 0001, Base Year 1 December 2024 - 30 November 2025
Year 2 SCS Vehicle Corrosion Control
| A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category |
| required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose |
| an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet. |
| Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates | ||||||
| Labor Category Name | Hourly Rate | Unit of Issue | Estimated Hours | = | Total | |
| Automotive Glass Worker | x | Labor Hour | 25 | = | $ - 0 | |
| Motor Equipment Metal Worker | x | Labor Hour | 25 | = | $ - 0 | |
| Motor Vehicle Mechanic | x | Labor Hour | 25 | = | $ - 0 | |
| Painter, Automotive | x | Labor Hour | 600 | = | $ - 0 | |
| Truck Driver, Heavy | x | Labor Hour | 25 | = | $ - 0 |
Total Proposed Labor Price 1 $ - 0 (Block D)
Government Estimated Cost for Materials $ 15,000.00 (Block E)
Total Proposed Price for Year 2 (Sum of Blocks D + E = F) $15,000.00 (Block F)
| Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 1001. |
| *If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose |
| travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR. |
&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (30 SCS) CLIN 1001 1 December 2025 - 30 November 2026
Year 3 SCS Vehicle Corrosion Control
| A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category |
| required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose |
| an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet. |
| Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates | ||||||
| Labor Category Name | Hourly Rate | Unit of Issue | Estimated Hours | = | Total | |
| Automotive Glass Worker | x | Labor Hour | 25 | = | $ - 0 | |
| Motor Equipment Metal Worker | x | Labor Hour | 25 | = | $ - 0 | |
| Motor Vehicle Mechanic | x | Labor Hour | 25 | = | $ - 0 | |
| Painter, Automotive | x | Labor Hour | 600 | = | $ - 0 | |
| Truck Driver, Heavy | x | Labor Hour | 25 | = | $ - 0 |
Total Proposed Labor Price $ - 0 (Block D)
Government Estimated Cost for Materials $ 15,000.00 (Block E)
Total Proposed Price for Year 3 (Sum of Blocks D + E = F) $15,000.00 (Block F)
| Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 2001. |
| *If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose |
| travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR. |
&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (30 SCS) 1 December 2026 - 30 November 2027
Year 4 SCS Vehicle Corrosion Control
| A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category |
| required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose |
| an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet. |
| Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates | ||||||
| Labor Category Name | Hourly Rate | Unit of Issue | Estimated Hours | = | Total | |
| Automotive Glass Worker | x | Labor Hour | 25 | = | $ - 0 | |
| Motor Equipment Metal Worker | x | Labor Hour | 25 | = | $ - 0 | |
| Motor Vehicle Mechanic | x | Labor Hour | 25 | = | $ - 0 | |
| Painter, Automotive | x | Labor Hour | 600 | = | $ - 0 | |
| Truck Driver, Heavy | x | Labor Hour | 25 | = | $ - 0 |
Total Proposed Labor Price $ - 0 (Block D)
Government Estimated Cost for Materials $ 15,000.00 (Block E)
Total Proposed Price for CLIN 3001 (Sum of Blocks D + E = F) $15,000.00 (Block F)
| Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 3001. |
| *If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose |
| travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR. |
&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (30 SCS) 1 December 2027- 30 November 2028
Year 5 SCS Vehicle Corrosion Control
| A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category |
| required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose |
| an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet. |
| Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates | ||||||
| Labor Category Name | Hourly Rate | Unit of Issue | Estimated Hours | = | Total | |
| Automotive Glass Worker | x | Labor Hour | 25 | = | $ - 0 | |
| Motor Equipment Metal Worker | x | Labor Hour | 25 | = | $ - 0 | |
| Motor Vehicle Mechanic | x | Labor Hour | 25 | = | $ - 0 | |
| Painter, Automotive | x | Labor Hour | 600 | = | $ - 0 | |
| Truck Driver, Heavy | x | Labor Hour | 25 | = | $ - 0 |
Total Proposed Labor Price $ - 0 (Block D)
Government Estimated Cost for Materials $ 15,000.00 (Block E)
Total Proposed Price for Year 5 (Sum of Blocks D + E = F) $15,000.00 (Block F)
| Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 4001. |
| *If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose |
| travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR. |
&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (30 SCS) 1 December 2028 - 30 November 2029
File details come from the government source that posted it. Updated .