20040818_ACM_B13330_SOW.pdf

PDF 677 KB Posted

Attached to
Replace Steam System Breakers DFAC, Bldg. 13330 Federal contract opportunity
Solicitation number
FA461019RA029
Issued by
Department of the Air Force Space Command

About this file

Asbestos abatement SOW

View the file

Other files for this federal contract opportunity

Other files attached to Replace Steam System Breakers DFAC, Bldg. 13330, newest first.
File Type Posted
19990000_ACM_LBP_B13330_Abate_Plan_(1).pdf PDF
RFIs_2.pdf PDF
Solicitation_Amendment_FA461019RA0290003_SF_30.pdf PDF
XUMU_18-1015B_13330_Steam_Replacement_Breakers_Dining_Facility_RFIs.pdf PDF
19990924_ACM_LBP_B13330_Final_Rpt_DO_0084_Part4.pdf PDF
19990924_ACM_LBP_B13330_Final_Rpt_DO_0084_Part2.pdf PDF
19990924_ACM_LBP_B13330_Final_Rpt_DO_0084_Part3.pdf PDF
19990924_ACM_LBP_B13330_Final_Rpt_DO_0084_Part1.pdf PDF
Building_13330_Combined_DWG.pdf PDF
19990924_ACM_LBP_B13330_Final_Rpt_DO_0084_Part5.pdf PDF
Solicitation_Amendment_FA461019RA0290002_SF_30.pdf PDF
Attach_09__Blodgett_BCX-14G-NAT_Natural_Gas_Double_(Price).pdf PDF
18-1015B_Site_Visit_Minutes.pdf PDF
18-1015B_Site_Visit_Sign_in_Sheet.pdf PDF
Attach_07_VAFB_Electrical_Material_Specifications_Part3.pdf PDF
Attach_03_DOL_Wage_Determination.pdf PDF
Attach_02_Product_Examples_and_Specifications_Part2.pdf PDF
Attach_05_01_00_00_General_Requirements.pdf PDF
Attach_07_VAFB_Electrical_Material_Specifications_Part1.pdf PDF
Attach_07_VAFB_Electrical_Material_Specifications_Part5.pdf PDF
Attach_06_VAFB_01_44_00.pdf PDF
Attach_07_VAFB_Electrical_Material_Specifications_Part2.pdf PDF
Attach_02_Product_Examples_and_Specifications_Part1.pdf PDF
Attach_04_RMDF.pdf PDF
Attach_02_Product_Examples_and_Specifications_Part3.pdf PDF
Attach_08_Environmental_Specs_01_57_20_April_2018.pdf PDF
Solicitation_-_FA461019RA029.pdf PDF
Attach_01_18-1015B_SOW.pdf PDF
Attach_07_VAFB_Electrical_Material_Specifications_Part4.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

08-05-/04 12:22 FROM-ASI Inc.

A.S.I., INC.

Facsimile

661-327-2977 T-581 P01/06 U-079

To: 8~L~ Dt)qadJ,lo Date: 8~/8 -Q<f Company: QO -!£6!Cffl/ Pages: C, k~

Phone: Fax: SfoS 7 3.Y.:- 13~

COMMENTS

/6 -fhk wh(,..,,f ~ t1Lv /06k, h~ for

From the desk of ...

KE\/jN O'MALLEY General Manager

2130 E. BrundaSle Ln Beke:stje!G. CA 93307 i-':~-;: 55~ 327·2900 ry~ 561 327·2977

08-05-'04 12:22 FROM-ASI Inc. 661-327-2977 T-581 P02/06 U-079

Site Idelltification:

Contact Person:

Location(s) :

~laterial & Amount:

Asbestos Contentffype:

Abate:ment PrOCed1.1reS

Access;

ASBES·f<:>S A'BATEME~r PR()!ECT

SCOPE OF WORK

'VAN'DENBERG AIR FORCE B.l\.SE

BUILDING 1333()

AUGUST 18, 2004

Vandenberg Ai." FOl"ce Base

Kevin 07~lalley

A.S.J., In.c.

(661)321-2900

Btti}(ling 13330

Disposal of pipe fittings and boiler.

2-150/0 chrysotile

See attached

Available

Electricity/water Hool<: up:

Decon/Containrnent Setup:

Security and Safety;

worl~er Protection:

Start Date:

Completion Date:

Worker Hourst

Available -long cords, hoses ma.y he necessary.

One stage Jecon sha111e utili~ed.

-'fhe corrtractor is responsi.ble for the safety of his personnel and equipment. Compliance with Cal/OSHA regulatiolls for ashestos worl~ is mandatory..

1-\11 ahatement personnel shall 'wear half fa.ced.

respirators with HEPA cartridges and disposable coveralls.

To he arranged

T0 he arranged l"Q be arranged

08-05-'04 12:23 FROM-ASI Inc. 661-327-2977 T-581 P03/06 U-079

A.SJ., INC.

SITE-SPECIFIC SELECTIVE ASBESTOS ABATEMENT PLAN

BUILDING 13330

SCOPE OF WORK

Thescope ofwork includes theloadingofpipefittings andorpipeinsulationandaboiler, andtheproper packaging of the material for transportation and disposal to an approved landfill.

Theworkwillbeperformed in suchamanneras tominimize theinterruption of thenormal useof the facility.

METHODS AND PROCEDURES

Handlingofasbestos materials isperOSHA Construction Industry Standard 29CFR1926.1101, and is incorporated herein as if actually written in this site-specific plan.

EN(11NEERING CONTROLS

Engineering controls willincludetheuse'ofPPE forallpersonnel designated towork intheregulatedarea.

The regulated area will be cordoned off with warning signs and barriertape.

Thework areawillcontinuouslybewetted withamixtureofonepartremoval encapsulantandfourparts water. The mist will be createdutilizingan airless sprayeror commercially availableatomizer.

WORK. PROCED1JRES

Workprocedures shallincludetheuseofthe"wetmethod"ofremoval orpackagingofthewastewithin the workarea. Personsenteringintothework areawilldon full-bodydisposable protective coveralls, gloves, safety glasses,hard hats and a respirator, equipped with HEPA filter cartridges.

Theasbestos materialswillbe wrapped andplacedin6 milpolybagswithoutdisturbing theasbestos material from its substrate.

The exterioroftheasbestos wastedisposalbagswillbecleaned, re-bagged andbemanually carriedto disposal container

A WasteManifest will becompleted foreachsuchcontainerwhenthevolumeofthecontainerisoptimized (volume may vary due to the weight ofthe material). 30CES/CEV will be notified at least48 hours in advanceofthescheduleddateofpick-upbythetransporter. 30CES/CEV' willverifythematerials being disposedhave properlybeenpackagedandthe amountof the materialbeingdisposed is accurately recordedon the manifest.

08-05-'04 12:23 FROM-ASI Inc. 661-327-2977 T-581 P04/06 U-079

Onthescheduled dateofpick-up, thernanifestwill besignedby theTransporters Agent (transporter) and by the30CES/CEV(generator). TIlepersonsauthorizedtosign themanifestareBillyDelgadillo ext.6 5725 and/or Kevin Erik 6-8438 with Clean Harbors.

DECONTAMINAIION PRAC"rI(~ES

Commercially availabledecontamination units will be utilized. Waste waterand waterused during abatement willbefilteredthrough a25-andI-micron,inseries, commercial water filter priortothewater being discharged in the public sewer system. In some cases, and at the discretion of A.S.I., Inc.

contaminated water maybe place directly into 6 mil bags, as other asbestos-contaminatedwaste.

No drinks,tobaccoor foodproducts willbepermitted within theworkarea. Consumptionoffood will only occur outsideof the demarcated "caution" area of the project.

A.S.!.,Inc.'s competent on-sitepersonwill beresponsible forassuring thatpersonnel andequipment are properly decontaminated prior to exiting the decontamination unit

SITE SECl.JRITY

Theworkwillbeperformed duringnormal workinghours suchthatthenormal operationsperformed within the building aremmimally interrupted, Construction barrier tape labeledeitheras"Caution or Danger Asbestos" willbe positionedabout the entrance to the work area"

Only authorized personnel willbepermittedto entertheregulated work area. Thosepersons entering the regulated workarea shall record onthe"Entry-Exit" loghis/hername, social securitynumber, timeofentry and timeofexit Saidpersonnelshallreceive trainingregardingthis sitespecifichealthandsafetyplan, which shall includeemergencyevacuationnotification, emergencyresponseactions, and thelocation ofthe reassembly point.

A.S.!., Inc.'S on..sitecompetentpersonshallassurethat thosepersonsentering aregulated work areahave received suchtraining, havecurrentmedical surveillancedocumentation, andhavedocumentation where such authorization to enter is granted by other than a regulatory agency, or A.S.!., Inc.

A.S.I.,Inc.shall utilize the availablepowersupplyand electric serviceprovided within theregulatedwork areashall beGround FaultCircuit Interrupter(GFCI) protected. Electric cords shallbeprovided with a ground plug. Double insulated tools shall 'be prohibited on A.SJ.'s work ..site.

A.S.I., Inc. shallprovidetwo(minimumZtll , 1OBC) fireextinguishers; oneshall bepositionedimmediately outsidetheentrance tothedecontaminationunitanda secondextinguisher shallbeplaced intheregulated work area. ArSJ., Inc. may place a clearpolyethylene bag over the fire extinguisher to prevent contamination, however, thebag shallbe so labeled to allowimmediate access to the extinguisher, 08-05-'04 12:24 FROM-ASI Inc.

cubic centimeter of air.

661-327-2977 T-581 P06/06 U-079

Phasecontrast microscopy(PCM) samplesshallbe analyzed by anAIHAlaboratorywhoseanalystshave completed the NIOSH Course 582 and are AIHAregistered asbestos analysts.

Post abatement/clearance samples will not be collected.

Airmonitoring samples shall be readby Asbestos Testing Laboratory, 6723 Meany Ave~1 Suite D, Bakersfield, CA 93308

Allairsampling resultswill bemade available tothebasebioenvironmental, theasbestos officerandBestek Engineering.

WASTE HANDLING

Thewastegeneratedduringtheasbestos..relatedworkwill initiallybeplacein 6 mil bags. Thosebagswill beevacuatedusing aHEPA-filtered VaCUUln7 thebagswill betwisted, andthetwistwillbetaped with dU(,1 tape and the twist will be doubled over (goose neck) and be re...taped.

Theexterioroftheinitially bagged materialwillbe cleanedand will be insertedintoasecondbagandthe hermetic sealing process repeated.

The waste hauler shall be Remedial Transportation Solutions, (661) 746-1132.

Asbestos waste will be disposed at La paz County Landfill, Parker AZ.

REGULATORY NOTIFICATION

No abatement isbeingperformedon thisproject Disposal of less than 160s.f. is thescopeofwork. ASI, Inc.shallberesponsible forany andallothernotifications requiredbyregulatory agenciesexercisingcontrol over asbestos-related work.

RECORD KEEPIN(i

A project log, entry - exit log, record oftoolbox safety, and other project documents required to be maintainedby theContractDocuments (previouslysubmitted andapproved) will be maintained on siteand a dailyqualitycontrol reportwillbesubmitted totheContractingOfficer andBestek ifrequested inwriting prior to the start of the project.

Personsengaged in thehandlingofasbestos shallhavebeentrained, withinthepast12months, byanEPA accreditedtraining agencyasanAsbestosWorkeror Supervisor. Certifications ofAHERAtrainingshall be maintained on-site for inspection.

Medical s-urveillance, workerEPA-accredited training,respiratorydevicefit-testing, andcertificates of specialized training willbe likewise maintained on-site.

08-05-'04 12:24 FROM-ASI Inc.

PRE-START MEETING

661-327-2977 T-581 P05/06 U-079

A prestartorpreparatorymeetingwillbe heldprior tocommencementofworkwith theasbestosofficer Mr. William Delgadillo.

As partofthe"preparatorymeeting", emergencyescaperoutes shallbe identifiedbyA.S.I.,Inc. Bestek Engineeringshall notify itsbuildingmanagerofthose locations where workwillbeperformed, theduration oftheexistenceofcritical barriers sothatthebuilding managermay establishnewescaperoutes forthe buildingoccupants. Intheevent ofan emergency, A.SJ.shall immediatelyevacuatethework area, without regardfordecontamination, andassemble intheparking lot. Onceassembled, A.S.!. 's competentperson shalldirect oneworker todia1911 andnotifytheappropriate emergencyresponse agency ofthesituation and then conduct a "roll call" to assureall workers haveevacuated the work area.

A.S.L shall postwithin thecleanroomofthedecontamination unitthename,address, andphonenumber of the followingagency or individuals:

Bestek Engineering A.S.I., Inc. Office Asbestos Program Officer Bio-Environmental Engineering A.S.I.'s Project Superintendent

RESPIRATORY PROTECTION

A.S.I., Inc,employeeswillbe individually assignedandbe requiredto weara respiratory deviceequipped with HEPA filtercartridges fromthetimeofinitialworkandcontinuously- until the workis completedor the individual exits the work area.

Should anyone worker's 8hourtimeweightedaverageexposureequalorexceed1.0flee, thelevelof respiratory protection must be upgradedto that ofa full face, supplied-air (pressuredemandmode) respirator.

AIR MONITORING

A.S.!., Inc.willperform employees exposureairmonitoringof a1east25 percentofA.S.!., Inc.'s work force, or a minimum oftwosamples to ascertain A.S.I.,Inc. t s employeeexposure does not exceed the 8 hour time weightedaverageexposurelevel (8-hrTWA) of 0.1 fiberper cubiccentimeterofair, Said samples will be collectedon commerciallyprepared 25 mm, with an open face SO mm electrically conductive cowl, 0.8micronfiltermediacassettes specificallydesigned forasbestos ata flow ratebetween

0.5 and 2.5 litersperminute. The samplevolumewill 'vary with the anticipatedfiltermedia loading, however, theideal volumewillrangebetween 120and600liters. Samples willbe analyzed usingMethod NIOSH7400, using '-'A" countingrules. A.S.I., Inc. 'Will also collect"excursion"samples; samplesdesigned to determineanemployees highestpotentialexposure. Thoseexcursionsamples willbecollected on commercially prepared 25mm, 0,,8 micronfilter mediacassettes specifically designed forasbestos.

Excursion sampleshave adurationofthirtyminutes (30min.)and will becollectedatacalibrated flow rate ofbetween 0.5and5.0litersperminute. TIle 30-minuteexcursion limit, assetby OSHA,is 1.0 fibers per

File details come from the government source that posted it.